Data Center Power & Policy in Philippines
Every government action on data centers and power in Philippines that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 20 November 2026, DC Market Insights tracks 14 government actions on data centers and power in Philippines, 12 of them in force. Philippines has 1 restriction on new data centers in force: Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45). 2 incentive schemes apply, including 2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47).
Market snapshot
Philippines power and policy: key facts
- Renewable share of electricity generation: 22.2% (2024). Rank 31 of 42 tracked countries, highest first.
- Grid emission factor: 0.71 kgCO2/kWh (2017). Rank 3 of 35 tracked countries, highest first.
- Latest change: DOE urges dedicated power supply for Pax Silica AI/data hub to protect Luzon Grid (Department of Energy, 28 Jul 2026).
- By type: 4 regulation, 2 grid access, 2 incentive and 2 plan or strategy.
Power indicators for Philippines
Latest official figure for each indicator, with earlier years where we have them.
In force now in Philippines
Restriction (1)
Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45)
AO No. 45 (23 July 2026) amends AO No. 18 (June 2019), which had suspended processing of new ecozone applications in Metro Manila. PEZA may again accept and evaluate applications for new IT parks and IT centers in the NCR, while the moratorium on all other economic zone types in Metro Manila remains in force. Affects where PEZA-registered IT/data facilities can locate in NCR.
Grid access (1)
Energy Virtual One-Stop Shop (EVOSS) Act, RA 11234
RA 11234 creates an online single gateway for permitting new power generation, transmission and distribution projects, with deemed-approval of complete applications not acted on in time (excluding DENR/ERC actions on fossil fuel projects) and fixed LGU processing periods. Relevant to captive or dedicated generation for data center campuses.
Power tariff (1)
ERC lowers RCOA/contestable-customer threshold to 100 kW (ERC Resolution No. 22, s. 2025)
ERC Resolution No. 22, Series of 2025 lowers eligibility for the Competitive Retail Electricity Market/RCOA and Retail Aggregation Program to an average monthly peak demand of at least 100 kW (from 500 kW), effective 26 June 2026. Before that date only end-users meeting the 500 kW threshold could switch. The 100 kW level mirrors the DOE Green Energy Option Program (GEOP) threshold.
100 kW New minimum average monthly peak demand; previous threshold 500 kW. Resolution issue date not stated in the IEMOP bulletin; 2025-11-07 is the date of the first press report found (Philstar). IEMOP bulletin dated 5 May 2026.
Incentive (2)
2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47)
The 2026 SIPP, formulated by the Board of Investments in consultation with the Fiscal Incentives Review Board and approved by President Marcos via Memorandum Order No. 47, places frontier technologies including data center facilities in Tier III, the top priority tier for CREATE/CREATE MORE fiscal incentives.
CREATE MORE Act (RA 12066) – 100% additional deduction on power expense
CREATE MORE amends the Tax Code incentive regime for registered business enterprises (RBEs). Under the Enhanced Deductions Regime, RBEs may take a 100% additional deduction on power expense (up from 50%), applicable only to power used for the registered project or activity; RBEs can alternatively elect a 5% Special Corporate Income Tax. Incentives can run up to 17 or 27 years. Particularly relevant to power-intensive data centers registered under the SIPP.
100 % Additional deduction on power expense (previously 50%)
Renewable energy (1)
Renewable Energy Act of 2008 (RA 9513) – Renewable Portfolio Standards
RA 9513 established the framework for RE development, including Renewable Portfolio Standards (RPS) requiring electricity suppliers to source an agreed portion of supply from eligible RE, priority connection facilities for RE plants in transmission and distribution plans, and fiscal incentives for RE developers.
Efficiency rule (1)
Energy Efficiency and Conservation Act (RA 11285) – designated establishments
RA 11285 institutionalises energy efficiency. Energy-intensive private or public entities identified by DOE by annual energy consumption are 'designated establishments' (Type 1 and Type 2) that must employ certified energy conservation officers/energy managers and implement energy management, with consumption thresholds adjustable by DOE. Large data centers would fall within its commercial/industrial scope by consumption.
Regulation (4)
Konektadong Pinoy Act (RA 12234) – open access in data transmission
RA 12234 liberalises the data transmission industry: data transmission industry participants (DTIPs) register with the NTC rather than needing a legislative franchise, with foreign entities subject to other applicable laws and foreign government-controlled entities excluded. The Act does not use the term data center. It lapsed into law without the President's signature on 24 August 2025.
DICT Cloud First Policy as amended (Department Circular No. 010, s. 2020)
DICT DC No. 010 s. 2020 amends the government Cloud First Policy (DC 2017-002). It covers executive agencies, GOCCs, SUCs, LGUs and cloud providers serving government, updates data classification (highly sensitive, above-sensitive, sensitive, non-sensitive government data) and asserts that Philippine law applies to data owned or processed by government or Philippines-linked entities.
Data Privacy Act of 2012 (RA 10173) – accountability for cross-border transfers
The Data Privacy Act imposes no data localization requirement; instead, personal information controllers remain accountable for personal data transferred to third parties for processing, domestically or internationally, subject to cross-border arrangement and cooperation. Administered by the National Privacy Commission.
Electric Power Industry Reform Act (EPIRA), RA 9136 – retail competition and open access
EPIRA restructured the power sector, deregulated generation (no national franchise needed for generation companies) and mandated Retail Competition and Open Access (RCOA) on distribution wires, letting contestable end-users (as determined by the ERC) choose their electricity supplier. This is the legal basis for large loads such as data centers to contract supply directly with generators or retail electricity suppliers.
Plan or strategy (1)
DOE renewable share targets (35% by 2030, 50% by 2040) and RPS increment raised to 2.5%
DOE targets renewable energy at 35% of the power generation mix by 2030 and 50% by 2040 (Philippine Energy Plan). The minimum annual incremental RE requirement under the RPS for grid mandated participants was raised from 1% to 2.5% starting 2023. DOE reported a record 794.34 MW of RE capacity added in 2024.
35 % 35% RE share by 2030, 50% by 2040. DOE page carries no date; 2025-02-11 taken from contemporaneous press coverage of the release.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
DOE urges dedicated power supply for Pax Silica AI/data hub to protect Luzon Grid
Energy Secretary Sharon Garin said the Pax Silica project should build its own generation rather than draw on the Luzon Grid, warning that a 200-500 MW load could destabilise it; options cited were small modular nuclear reactors, LNG/indigenous gas or hybrid conventional-RE plants built by the locator or within the economic zone. Statement, not a formal issuance.
House Bill 3445 – Online Network Philippines Act (ICT hubs incl. 'Data Farms')
Bill filed in the 20th Congress (House) by the Revilla representatives to establish ICT hubs nationwide, with at least one hub per province. 'Data Farms' (physical facilities housing servers and network equipment) are one ICT hub classification, subject to data security laws.
Timeline of data center and power policy in Philippines
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 28 Jul 2026 | DOE urges dedicated power supply for Pax Silica AI/data hub to protect Luzon Grid | Grid access | Announced | Department of Energy |
| 23 Jul 2026 | Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45) | Restriction | In force | Office of the President; PEZA |
| 2 Jun 2026 | 2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47) | Incentive | In force | Board of Investments / Office of the President |
| 7 Nov 2025 | ERC lowers RCOA/contestable-customer threshold to 100 kW (ERC Resolution No. 22, s. 2025) | Power tariff | In force | Energy Regulatory Commission (as published by IEMOP) |
| 24 Aug 2025 | Konektadong Pinoy Act (RA 12234) – open access in data transmission | Regulation | In force | Congress of the Philippines; DICT; NTC |
| 11 Aug 2025 | House Bill 3445 – Online Network Philippines Act (ICT hubs incl. 'Data Farms') | Plan or strategy | Proposed | House of Representatives (20th Congress) |
| 11 Feb 2025 | DOE renewable share targets (35% by 2030, 50% by 2040) and RPS increment raised to 2.5% | Plan or strategy | In force | Department of Energy |
| 8 Nov 2024 | CREATE MORE Act (RA 12066) – 100% additional deduction on power expense | Incentive | In force | Congress of the Philippines; Department of Finance |
| 4 Jun 2020 | DICT Cloud First Policy as amended (Department Circular No. 010, s. 2020) | Regulation | In force | Department of Information and Communications Technology |
| 12 Apr 2019 | Energy Efficiency and Conservation Act (RA 11285) – designated establishments | Efficiency rule | In force | Congress of the Philippines; DOE |
| 8 Mar 2019 | Energy Virtual One-Stop Shop (EVOSS) Act, RA 11234 | Grid access | In force | Congress of the Philippines; DOE |
| 15 Aug 2012 | Data Privacy Act of 2012 (RA 10173) – accountability for cross-border transfers | Regulation | In force | Congress of the Philippines; National Privacy Commission |
| 16 Dec 2008 | Renewable Energy Act of 2008 (RA 9513) – Renewable Portfolio Standards | Renewable energy | In force | Congress of the Philippines; DOE |
| 8 Jun 2001 | Electric Power Industry Reform Act (EPIRA), RA 9136 – retail competition and open access | Regulation | In force | Congress of the Philippines |
How Philippines compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in Philippines?
Yes. 1 restriction on new data centers is in force in Philippines: Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45).
What incentives does Philippines offer data centers?
In force: 2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47) and CREATE MORE Act (RA 12066) – 100% additional deduction on power expense. Each is listed with its authority and dates on this page.
How much of Philippines’s electricity is renewable?
Renewables supplied 22.2% of electricity generation in Philippines in 2024.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.