Data Center Power & Policy in Philippines

Every government action on data centers and power in Philippines that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 20 November 2026, DC Market Insights tracks 14 government actions on data centers and power in Philippines, 12 of them in force. Philippines has 1 restriction on new data centers in force: Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45). 2 incentive schemes apply, including 2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47).

14Actions tracked
12In force
—Industrial power price
22.2%Renewable share of generation

Market snapshot

Philippines power and policy: key facts

  • Renewable share of electricity generation: 22.2% (2024). Rank 31 of 42 tracked countries, highest first.
  • Grid emission factor: 0.71 kgCO2/kWh (2017). Rank 3 of 35 tracked countries, highest first.
  • Latest change: DOE urges dedicated power supply for Pax Silica AI/data hub to protect Luzon Grid (Department of Energy, 28 Jul 2026).
  • By type: 4 regulation, 2 grid access, 2 incentive and 2 plan or strategy.

Power indicators for Philippines

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 22.2% 2024 · RE share of 2024 gross generation as stated in DOE 2024 Power Statistics (28,193,102 MWh of 126,940,827 MWh). DOE 2024 Power Statistics – Gross Generation
Grid emission factor 0.71 kgCO2/kWh 2017 · Luzon-Visayas grid, simple operating margin, 2015-2017 NGEF, tCO2/MWh (= kgCO2/kWh). Same grid: build margin 0.5979; combined margin 0.6836 (wind/solar), 0.5979 (other). Latest DOE-published NGEF found. Mindanao grid OM 0.7797 (same source). Not a grid av DOE 2015-2017 National Grid Emission Factor (NGEF)
Peak electricity demand 19.3 GW 2024 · 19,274 MW total non-coincidental peak demand (Luzon 14,016; Visayas 2,681; Mindanao 2,577 MW), converted to GW. DOE 2024 Power Statistics – Summary
Installed generation capacity 29.7 GW 2024 · 29,706 MW installed (dependable 26,087 MW), converted MW to GW. Row "Total Installed Capacity" in table "Installed Capacity by Plant Type in MW", 2024 column 29,706 (2023: 28,291). DOE 2024 Power Statistics – Summary

In force now in Philippines

Restriction (1)

  • RestrictionIn force

    Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45)

    AO No. 45 (23 July 2026) amends AO No. 18 (June 2019), which had suspended processing of new ecozone applications in Metro Manila. PEZA may again accept and evaluate applications for new IT parks and IT centers in the NCR, while the moratorium on all other economic zone types in Metro Manila remains in force. Affects where PEZA-registered IT/data facilities can locate in NCR.

    Office of the President; PEZA · PTV News (Philippine government broadcaster)

Grid access (1)

  • Grid accessIn force

    Energy Virtual One-Stop Shop (EVOSS) Act, RA 11234

    RA 11234 creates an online single gateway for permitting new power generation, transmission and distribution projects, with deemed-approval of complete applications not acted on in time (excluding DENR/ERC actions on fossil fuel projects) and fixed LGU processing periods. Relevant to captive or dedicated generation for data center campuses.

    Congress of the Philippines; DOE

Power tariff (1)

  • Power tariffIn force

    ERC lowers RCOA/contestable-customer threshold to 100 kW (ERC Resolution No. 22, s. 2025)

    ERC Resolution No. 22, Series of 2025 lowers eligibility for the Competitive Retail Electricity Market/RCOA and Retail Aggregation Program to an average monthly peak demand of at least 100 kW (from 500 kW), effective 26 June 2026. Before that date only end-users meeting the 500 kW threshold could switch. The 100 kW level mirrors the DOE Green Energy Option Program (GEOP) threshold.

    100 kW New minimum average monthly peak demand; previous threshold 500 kW. Resolution issue date not stated in the IEMOP bulletin; 2025-11-07 is the date of the first press report found (Philstar). IEMOP bulletin dated 5 May 2026.

    Energy Regulatory Commission (as published by IEMOP) · Effective 26 Jun 2026

Incentive (2)

  • IncentiveIn force

    2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47)

    The 2026 SIPP, formulated by the Board of Investments in consultation with the Fiscal Incentives Review Board and approved by President Marcos via Memorandum Order No. 47, places frontier technologies including data center facilities in Tier III, the top priority tier for CREATE/CREATE MORE fiscal incentives.

    Board of Investments / Office of the President

  • IncentiveIn force

    CREATE MORE Act (RA 12066) – 100% additional deduction on power expense

    CREATE MORE amends the Tax Code incentive regime for registered business enterprises (RBEs). Under the Enhanced Deductions Regime, RBEs may take a 100% additional deduction on power expense (up from 50%), applicable only to power used for the registered project or activity; RBEs can alternatively elect a 5% Special Corporate Income Tax. Incentives can run up to 17 or 27 years. Particularly relevant to power-intensive data centers registered under the SIPP.

    100 % Additional deduction on power expense (previously 50%)

    Congress of the Philippines; Department of Finance

Renewable energy (1)

  • Renewable energyIn force

    Renewable Energy Act of 2008 (RA 9513) – Renewable Portfolio Standards

    RA 9513 established the framework for RE development, including Renewable Portfolio Standards (RPS) requiring electricity suppliers to source an agreed portion of supply from eligible RE, priority connection facilities for RE plants in transmission and distribution plans, and fiscal incentives for RE developers.

    Congress of the Philippines; DOE

Efficiency rule (1)

  • Efficiency ruleIn force

    Energy Efficiency and Conservation Act (RA 11285) – designated establishments

    RA 11285 institutionalises energy efficiency. Energy-intensive private or public entities identified by DOE by annual energy consumption are 'designated establishments' (Type 1 and Type 2) that must employ certified energy conservation officers/energy managers and implement energy management, with consumption thresholds adjustable by DOE. Large data centers would fall within its commercial/industrial scope by consumption.

    Congress of the Philippines; DOE

Regulation (4)

  • RegulationIn force

    Konektadong Pinoy Act (RA 12234) – open access in data transmission

    RA 12234 liberalises the data transmission industry: data transmission industry participants (DTIPs) register with the NTC rather than needing a legislative franchise, with foreign entities subject to other applicable laws and foreign government-controlled entities excluded. The Act does not use the term data center. It lapsed into law without the President's signature on 24 August 2025.

    Congress of the Philippines; DICT; NTC

  • RegulationIn force

    DICT Cloud First Policy as amended (Department Circular No. 010, s. 2020)

    DICT DC No. 010 s. 2020 amends the government Cloud First Policy (DC 2017-002). It covers executive agencies, GOCCs, SUCs, LGUs and cloud providers serving government, updates data classification (highly sensitive, above-sensitive, sensitive, non-sensitive government data) and asserts that Philippine law applies to data owned or processed by government or Philippines-linked entities.

    Department of Information and Communications Technology

  • RegulationIn force

    Data Privacy Act of 2012 (RA 10173) – accountability for cross-border transfers

    The Data Privacy Act imposes no data localization requirement; instead, personal information controllers remain accountable for personal data transferred to third parties for processing, domestically or internationally, subject to cross-border arrangement and cooperation. Administered by the National Privacy Commission.

    Congress of the Philippines; National Privacy Commission · National Privacy Commission – RA 10173 text

  • RegulationIn force

    Electric Power Industry Reform Act (EPIRA), RA 9136 – retail competition and open access

    EPIRA restructured the power sector, deregulated generation (no national franchise needed for generation companies) and mandated Retail Competition and Open Access (RCOA) on distribution wires, letting contestable end-users (as determined by the ERC) choose their electricity supplier. This is the legal basis for large loads such as data centers to contract supply directly with generators or retail electricity suppliers.

    Congress of the Philippines

Plan or strategy (1)

  • Plan or strategyIn force

    DOE renewable share targets (35% by 2030, 50% by 2040) and RPS increment raised to 2.5%

    DOE targets renewable energy at 35% of the power generation mix by 2030 and 50% by 2040 (Philippine Energy Plan). The minimum annual incremental RE requirement under the RPS for grid mandated participants was raised from 1% to 2.5% starting 2023. DOE reported a record 794.34 MW of RE capacity added in 2024.

    35 % 35% RE share by 2030, 50% by 2040. DOE page carries no date; 2025-02-11 taken from contemporaneous press coverage of the release.

    Department of Energy · DOE press release: PH push for renewable energy yields record-breaking installations

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Grid accessAnnounced

    DOE urges dedicated power supply for Pax Silica AI/data hub to protect Luzon Grid

    Energy Secretary Sharon Garin said the Pax Silica project should build its own generation rather than draw on the Luzon Grid, warning that a 200-500 MW load could destabilise it; options cited were small modular nuclear reactors, LNG/indigenous gas or hybrid conventional-RE plants built by the locator or within the economic zone. Statement, not a formal issuance.

    Department of Energy

  • Plan or strategyProposed

    House Bill 3445 – Online Network Philippines Act (ICT hubs incl. 'Data Farms')

    Bill filed in the 20th Congress (House) by the Revilla representatives to establish ICT hubs nationwide, with at least one hub per province. 'Data Farms' (physical facilities housing servers and network equipment) are one ICT hub classification, subject to data security laws.

    House of Representatives (20th Congress) · House of Representatives – HB03445

Timeline of data center and power policy in Philippines

DateActionTypeStatusAuthority
28 Jul 2026DOE urges dedicated power supply for Pax Silica AI/data hub to protect Luzon GridGrid accessAnnouncedDepartment of Energy
23 Jul 2026Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45)RestrictionIn forceOffice of the President; PEZA
2 Jun 20262026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47)IncentiveIn forceBoard of Investments / Office of the President
7 Nov 2025ERC lowers RCOA/contestable-customer threshold to 100 kW (ERC Resolution No. 22, s. 2025)Power tariffIn forceEnergy Regulatory Commission (as published by IEMOP)
24 Aug 2025Konektadong Pinoy Act (RA 12234) – open access in data transmissionRegulationIn forceCongress of the Philippines; DICT; NTC
11 Aug 2025House Bill 3445 – Online Network Philippines Act (ICT hubs incl. 'Data Farms')Plan or strategyProposedHouse of Representatives (20th Congress)
11 Feb 2025DOE renewable share targets (35% by 2030, 50% by 2040) and RPS increment raised to 2.5%Plan or strategyIn forceDepartment of Energy
8 Nov 2024CREATE MORE Act (RA 12066) – 100% additional deduction on power expenseIncentiveIn forceCongress of the Philippines; Department of Finance
4 Jun 2020DICT Cloud First Policy as amended (Department Circular No. 010, s. 2020)RegulationIn forceDepartment of Information and Communications Technology
12 Apr 2019Energy Efficiency and Conservation Act (RA 11285) – designated establishmentsEfficiency ruleIn forceCongress of the Philippines; DOE
8 Mar 2019Energy Virtual One-Stop Shop (EVOSS) Act, RA 11234Grid accessIn forceCongress of the Philippines; DOE
15 Aug 2012Data Privacy Act of 2012 (RA 10173) – accountability for cross-border transfersRegulationIn forceCongress of the Philippines; National Privacy Commission
16 Dec 2008Renewable Energy Act of 2008 (RA 9513) – Renewable Portfolio StandardsRenewable energyIn forceCongress of the Philippines; DOE
8 Jun 2001Electric Power Industry Reform Act (EPIRA), RA 9136 – retail competition and open accessRegulationIn forceCongress of the Philippines

How Philippines compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Philippines?

Yes. 1 restriction on new data centers is in force in Philippines: Lifting of Metro Manila moratorium on new IT parks and IT centers (Administrative Order No. 45).

What incentives does Philippines offer data centers?

In force: 2026 Strategic Investment Priority Plan lists data center facilities in Tier III (Memorandum Order No. 47) and CREATE MORE Act (RA 12066) – 100% additional deduction on power expense. Each is listed with its authority and dates on this page.

How much of Philippines’s electricity is renewable?

Renewables supplied 22.2% of electricity generation in Philippines in 2024.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst