Data Center Power & Policy in Bangladesh

Every government action on data centers and power in Bangladesh that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 8 October 2026, DC Market Insights tracks 4 government actions on data centers and power in Bangladesh, 2 of them in force. We have found no moratorium or restriction on new data centers in force in Bangladesh.

4Actions tracked
2In force
—Industrial power price
2%Renewable share of generation

Market snapshot

Bangladesh power and policy: key facts

  • Renewable share of electricity generation: 2% (2025). Rank 42 of 42 tracked countries, highest first.
  • Latest change: Announcement of expansion of the National Data Centre (NDC) and the NDC Disaster Recovery Centre (ICT Division, Ministry of Posts, Telecommunications and ICT, 20 Aug 2025).
  • By type: 2 plan or strategy and 2 regulation.

Power indicators for Bangladesh

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 2% 2025 · Ember country profile: 2% of electricity generation from low-carbon sources in 2025 (solar and wind alone 1.5%); low-carbon share used as renewable share. SREDA site was unreachable.
Peak electricity demand 17.2 GW 2026 · Maximum (peak) generation record 17,201 MW on 20 May 2026, from Power Division 'at a glance' table; peak generation used as proxy for peak demand (served); converted MW to GW. Power Division, Ministry of Power, Energy and Mineral Resources
Installed generation capacity 32.7 GW 2026 · Power Division 'at a glance' table: electricity generation capacity 32,688 MW including captive and renewable, data as of 15 Sep 2026; converted MW to GW. Power Division figure used because BPDB site was unreachable. Power Division, Ministry of Power, Energy and Mineral Resources

In force now in Bangladesh

Regulation (2)

  • RegulationIn force

    User's Policy for National Data Center, Bangladesh Computer Council

    Policy governing use of the National Data Center run by the Bangladesh Computer Council, published by the ICT Division on 29 October 2020. Services are available to ministries, government departments and directorates, other government, semi-government and public bodies, and banks. States the data centre will be certified Tier 3 by EPI India, with 99.982% availability.

    Bangladesh Computer Council / ICT Division · ICT Division, Government of Bangladesh

  • RegulationIn force

    Data Centre Guideline 2020 (ডাটা সেন্টার নির্দেশিকা ২০২০)

    ICT Division guideline on data centres, published 22 July 2020 per the ICT Division listing. Sets out a Tier I to Tier IV requirement table sourced from the Uptime Institute, with availability of 99.671%, 99.749%, 99.982% and 99.995% respectively, and UPS/generator requirements by tier (optional, yes, yes, dual).

    ICT Division, Ministry of Posts, Telecommunications and ICT · ICT Division, Government of Bangladesh

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Plan or strategyAnnounced

    Announcement of expansion of the National Data Centre (NDC) and the NDC Disaster Recovery Centre

    Press release of 20 August 2025 (Jashore): during a visit to the Jashore Software Technology Park and the NDC disaster recovery data centre run by the Bangladesh Computer Council, the Special Assistant for Posts, Telecom and ICT gave direction on the design of a planned new data centre and expressed hope that the expansion of the NDC and the disaster recovery data centre would be carried out within six months.

    ICT Division, Ministry of Posts, Telecommunications and ICT · Jashore · ICT Division, Government of Bangladesh

  • Plan or strategyAnnounced

    ICT Adviser directive to increase data centre capacity (press release, 23 September 2024)

    ICT Division press release of 23 September 2024 stating that the ICT Adviser urged an increase in data centre capacity, with the Bangladesh Computer Council to work on increasing the capacity of its data centre.

    ICT Division, Ministry of Posts, Telecommunications and ICT · ICT Division, Government of Bangladesh

Timeline of data center and power policy in Bangladesh

DateActionTypeStatusAuthority
20 Aug 2025Announcement of expansion of the National Data Centre (NDC) and the NDC Disaster Recovery Centre JashorePlan or strategyAnnouncedICT Division, Ministry of Posts, Telecommunications and ICT
23 Sep 2024ICT Adviser directive to increase data centre capacity (press release, 23 September 2024)Plan or strategyAnnouncedICT Division, Ministry of Posts, Telecommunications and ICT
29 Oct 2020User's Policy for National Data Center, Bangladesh Computer CouncilRegulationIn forceBangladesh Computer Council / ICT Division
22 Jul 2020Data Centre Guideline 2020 (ডাটা সেন্টার নির্দেশিকা ২০২০)RegulationIn forceICT Division, Ministry of Posts, Telecommunications and ICT

How Bangladesh compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Bangladesh?

We have found no moratorium or restriction on new data centers in force in Bangladesh as of 8 October 2026. Proposed or announced measures, if any, are listed in the timeline.

How much of Bangladesh’s electricity is renewable?

Renewables supplied 2% of electricity generation in Bangladesh in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst