Proprietary data

Data Centers in France

Every data center in France that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 26 November 2026, DC Market Insights tracks 109 data centers in France run by 20 operators: 93 operational, 2 under construction and 14 planned. Stated operational capacity is 338 MW, with a further 216 MW under construction and 2,206 MW planned. Data4 holds the largest share of tracked operational capacity (75%).

109Facilities tracked
20Operators
338 MWOperational (93 sites)
216 MWUnder construction (2 sites)
2,206 MWPlanned (14 sites)

MW = IT capacity where the source states it, otherwise total capacity. 33 of 109 facilities have a stated capacity; the others are counted as sites only.

Paris South West · Colt DCS · Les Ulis (approximate location)Paris 2 · Colt DCS · Villebon-sur-Yvette (approximate location)Paris 3 · Colt DCS · Villebon-sur-Yvette (approximate location)Paris 4 · Colt DCS · Villebon-sur-Yvette (approximate location)Paris 5 and 6 · Colt DCS · Les Ulis (approximate location)Paris Office & Data Center · Cogent · La Garenne Colombes (approximate location)Paris – Vélizy Data Center · Cogent · Vélizy-Villacoublay (approximate location)Antibes Data Center · Cogent · Antibes (approximate location)Bordeaux Data Center · Cogent · Bordeaux (approximate location)Dijon Data Center · Cogent · Dijon (approximate location)Grenoble Data Center · Cogent · Grenoble (approximate location)Lille Data Center · Cogent · Lille (approximate location)Montpellier Data Center · Cogent · Montpellier (approximate location)Nantes Data Center · Cogent · Nantes (approximate location)Nice Data Center · Cogent · Nice (approximate location)Poitiers Data Center · Cogent · Poitiers (approximate location)Rennes Data Center · Cogent · Rennes (approximate location)Rouen Data Center · Cogent · Rouen (approximate location)Strasbourg Data Center · Cogent · Strasbourg (approximate location)Toulouse Data Center · Cogent · Toulouse (approximate location)Tours Data Center · Cogent · Tours (approximate location)Data4 PAR01 campus · Data4 · Nozay (approximate location)Data4 PAR02 · Data4 · Marcoussis (approximate location)Data4 PAR03 AI campus · Data4 · Nozay (approximate location)Paris PA2 · Equinix · Saint-Denis (approximate location)Paris PA3 · Equinix · Saint-Denis (approximate location)Paris PA7 · Equinix · Courbevoie (approximate location)Paris PA9x · Equinix · Saint-Denis (approximate location)TH3 Paris Magny – Magny 1 · Telehouse · Magny-les-Hameaux (approximate location)TH3 Paris Magny – Magny 2 · Telehouse · Magny-les-Hameaux (approximate location)TH2 Paris Voltaire · Telehouse · Paris (approximate location)Paris PAR1 · Digital Realty · Aubervilliers (approximate location)Paris PAR2 · Digital Realty · Aubervilliers (approximate location)Paris PAR3 · Digital Realty · Saint-Denis (approximate location)Paris PAR4 · Digital Realty · Nanterre (approximate location)Paris PAR5 · Digital Realty · Saint-Denis (approximate location)Paris PAR6 · Digital Realty · Ivry-sur-Seine (approximate location)Paris PAR9 · Digital Realty · La Courneuve (approximate location)Paris PAR10 · Digital Realty · La Courneuve (approximate location)Paris PAR11 · Digital Realty · La Courneuve (approximate location)Paris PAR12 · Digital Realty · Ferrières-en-Brie (approximate location)Paris PAR13 · Digital Realty · Les Ulis (approximate location)Dugny Digital Hub (PAR15-PAR17) · Digital Realty · Dugny (approximate location)DC5 · Scaleway · Saint-Ouen-l'Aumône (approximate location)Paris East · Global Switch · Clichy (approximate location)Data4 Escaudain campus · Data4 · Escaudain (approximate location)OVHcloud CCH01 · OVHcloud · Paris (approximate location)Campus IA Fouju (phase 1: DC1, DC2, DC4) · Campus IA · Fouju (approximate location)Equinix BX1 · Equinix · Bruges (approximate location)Equinix PA15 (Meudon hyperscale project) · Equinix · Meudon (approximate location)Digital Realty MRS1 · Digital Realty · Marseille (approximate location)Digital Realty MRS2 · Digital Realty · Marseille (approximate location)Digital Realty MRS3 · Digital Realty · Marseille (approximate location)Digital Realty MRS4 · Digital Realty · Marseille (approximate location)Digital Realty MRS5 · Digital Realty · Marseille (approximate location)Telehouse TH1 Marseille · Telehouse · Marseille (approximate location)OVHcloud GRA1 · OVHcloud · Gravelines (approximate location)OVHcloud GRA2 · OVHcloud · Gravelines (approximate location)OVHcloud GRA3 · OVHcloud · Gravelines (approximate location)OVHcloud GRA04 · OVHcloud · Gravelines (approximate location)OVHcloud RBX · OVHcloud · Roubaix (approximate location)OVHcloud RBX2 · OVHcloud · Roubaix (approximate location)OVHcloud RBX3 · OVHcloud · Roubaix (approximate location)OVHcloud RBX4 · OVHcloud · Roubaix (approximate location)OVHcloud RBX5 · OVHcloud · Roubaix (approximate location)OVHcloud RBX6 · OVHcloud · Roubaix (approximate location)OVHcloud RBX7 · OVHcloud · Roubaix (approximate location)OVHcloud RBX8 · OVHcloud · Roubaix (approximate location)OVHcloud RBX10 · OVHcloud · Roubaix (approximate location)OVHcloud SBG3 · OVHcloud · Strasbourg (approximate location)OVHcloud SBG5 · OVHcloud · Strasbourg (approximate location)Opcore PAR1 · Opcore · Paris (approximate location)Opcore PAR2 · Opcore · Paris (approximate location)Opcore PAR3 · Opcore · Paris (approximate location)Opcore PAR4 · Opcore · Paris (approximate location)Opcore MRS1 · Opcore · Marseille (approximate location)Opcore LYO1 · Opcore · Lyon (approximate location)NTT DATA Paris 1 Data Center · NTT DATA · Le Coudray-Montceaux (approximate location)Vantage Bordeaux campus · Vantage Data Centers · Bordeaux (approximate location)Thésée TDC01 Aubergenville · Thésée DataCenter · Aubergenville (approximate location)Thésée TDC02 Voisins-le-Bretonneux · Thésée DataCenter · Voisins-le-Bretonneux (approximate location)Etix Lille #1 · Etix Everywhere · Tourcoing (approximate location)Etix Lille #2 · Etix Everywhere · Sainghin-en-Mélantois (approximate location)Etix Lille #3 · Etix Everywhere · Anzin (approximate location)Etix Lille #4 · Etix Everywhere · Fretin (approximate location)Etix Paris #1 · Etix Everywhere · Paris (approximate location)Etix Paris #3 · Etix Everywhere · Vélizy-Villacoublay (approximate location)Etix Nantes #1 · Etix Everywhere · Saint-Herblain (approximate location)Etix Nantes #2 · Etix Everywhere · Carquefou (approximate location)Etix Nantes #3 · Etix Everywhere · Couëron (approximate location)Etix Vendée #1 · Etix Everywhere · La Roche-sur-Yon (approximate location)Etix Lyon #1 · Etix Everywhere · Lyon (approximate location)Etix Toulouse #1 · Etix Everywhere · Balma (approximate location)Etix Montpellier #1 · Etix Everywhere · Montpellier (approximate location)Data Hills Aulnay-sous-Bois data center · Data Hills · Aulnay-sous-Bois (approximate location)Segro Le Bourget data center · Segro · Le Bourget (approximate location)PIPA-DC1 Blyes data center · PIPA-DC1 · Blyes (approximate location)OVHcloud MR901 · OVHcloud · Paris (approximate location)OVHcloud IEB01 · OVHcloud · Paris (approximate location)CyrusOne PAR1 Paris · CyrusOne · Wissous (exact location)CDG Campus · CloudHQ · Lisses (exact location)Paris PA4 · Equinix · Pantin (exact location)Paris PA5 · Equinix · Aubervilliers (exact location)Paris PA6 · Equinix · Aubervilliers (exact location)Paris PA10 · Equinix · Saint-Denis (exact location)Paris PA8x · Equinix · Pantin (exact location)Paris PAR7 · Digital Realty · La Courneuve (exact location)Paris PAR8 · Digital Realty · La Courneuve (exact location)Equinix PA13x · Equinix · Meudon (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

France data center market: key facts

  • Capacity under construction or planned (2,422 MW) is 7.2 times the operational base of 338 MW.
  • The three largest operators by operational capacity, Data4, Colt DCS and Scaleway, hold 88% of tracked operational MW.
  • Data4 has the largest development pipeline in France: 950 MW under construction or planned.
  • The largest operational facility we track is Data4 PAR01 campus (Data4, Nozay) at 250 MW.
  • The largest project in the pipeline is Data4 Escaudain campus (700 MW, planned).
  • Paris is the largest cluster: 57 of 109 facilities and 55% of tracked capacity.
  • By type, the tracker lists 59 colocation, 37 hyperscale and 13 edge facilities.
  • 5 facilities publish a PUE figure; the lowest is 1.36 at Opcore PAR3 (Opcore) and the median is 1.45.
  • 33 of 109 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational338 MW
Under construction216 MW
Planned2,206 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in France by tracked capacity, MW
Data41,205 MW
Colt DCS161 MW
CloudHQ150 MW
PIPA-DC1130 MW
Equinix80 MW
Segro75 MW

OperationalUnder construction or planned

Capacity by market in France, MW
Paris1,518 MW
Escaudain700 MW
Bordeaux400 MW
Lyon130 MW
Lille7 MW
Nantes2.5 MW
Valenciennes1.5 MW
Montpellier0.3 MW
Toulouse0.3 MW
La Roche-sur-Yon0.2 MW

OperationalUnder construction or planned

Facilities by type
Colocation59
Hyperscale37
Edge13

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in France

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Digital Realty19—176 MW—
OVHcloud18———
Cogent16———
Etix Everywhere1316.9 MW—5%
Equinix12—80 MW—
Opcore6———
Colt DCS524 MW137 MW7.1%
Data44255 MW950 MW75%
Telehouse418 MW—5.3%
Thésée DataCenter2———
Scaleway120 MW—5.9%
CyrusOne14.5 MW—1.3%
Global Switch1———
Vantage Data Centers1—400 MW—
Campus IA1———
NTT DATA1—84 MW—
Data Hills1—240 MW—
CloudHQ1—150 MW—
Segro1—75 MW—
PIPA-DC11—130 MW—

Largest data center projects in France

Under construction and planned facilities with a stated capacity, largest first. 216 MW under construction and 2,206 MW planned in total.

ProjectLocationStatusTypeCapacity
Data4 Escaudain campusData4 Escaudain Planned Hyperscale 700 MW
Vantage Bordeaux campusVantage Data Centers Bordeaux Planned Hyperscale 400 MW
Data4 PAR03 AI campusData4 Nozay Planned Hyperscale 250 MW
Data Hills Aulnay-sous-Bois data centerData Hills Aulnay-sous-Bois Planned Hyperscale 240 MW
Dugny Digital Hub (PAR15-PAR17)Digital Realty Dugny Under construction Hyperscale 176 MW
CDG CampusCloudHQ Lisses Planned Hyperscale 150 MW
PIPA-DC1 Blyes data centerPIPA-DC1 Blyes Planned Hyperscale 130 MW
NTT DATA Paris 1 Data CenterNTT DATA Le Coudray-Montceaux Planned Hyperscale 84 MW
Equinix PA15 (Meudon hyperscale project)Equinix Meudon Planned Hyperscale 80 MW
Segro Le Bourget data centerSegro Le Bourget Planned Hyperscale 75 MW
Paris 5 and 6Colt DCS Les Ulis Planned Hyperscale 55 MW
Paris 2Colt DCS Villebon-sur-Yvette Under construction Hyperscale 40 MW

How France compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom207551,064 MW7,741 MW
Germany20364933 MW4,386 MW
Finland4824230 MW2,661 MW
France10920338 MW2,422 MW
Sweden4518172 MW2,510 MW
Ireland461953 MW1,458 MW
Italy2211245 MW1,193 MW
Norway228446 MW820 MW
Denmark361654.6 MW1,004 MW
Russia11121516 MW425 MW
Spain411979.4 MW815 MW
Netherlands11034217 MW449 MW

Data center deals in France

Our Deal Tracker lists 11 deals in France since January 2026, with $95.50B in disclosed value.

  • Digital Realty → Freehold interest in land under Digital Realty's Dugny campus Land / campus $90.0M
  • Marguerite (Marguerite III fund) → PHOCEA DC M&A

All France deals in the Deal Tracker

Facilities

109 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Data4 Escaudain campusData4
History
  1. Announced
  2. Planned
Escaudain Planned 700 MW total — Operator / official
Vantage Bordeaux campusVantage Data Centers
History
  1. Announced
  2. Planned
Bordeaux Planned 400 MW total — Operator / official
Data4 PAR01 campusData4 Nozay Operational 250 MW — Operator / official
Data4 PAR03 AI campusData4
History
  1. Announced
  2. Planned
Nozay Planned 250 MW — Operator / official
Data Hills Aulnay-sous-Bois data centerData Hills Aulnay-sous-Bois Planned 240 MW total — Operator / official
Dugny Digital Hub (PAR15-PAR17)Digital Realty
History · 1 deal
  1. Under construction
  2. Under construction
Dugny Under construction 176 MW IT — Operator / official
CDG CampusCloudHQ Lisses Planned 150 MW IT — Operator / official
PIPA-DC1 Blyes data centerPIPA-DC1 Blyes Planned 130 MW IT — Operator / official
NTT DATA Paris 1 Data CenterNTT DATA Le Coudray-Montceaux Planned 84 MW IT — Operator / official
Equinix PA15 (Meudon hyperscale project)Equinix Meudon Planned 80 MW total — Operator / official
Segro Le Bourget data centerSegro Le Bourget Planned 75 MW total — Operator / official
Paris 5 and 6Colt DCS Les Ulis Planned 55 MW IT — Operator / official
Paris 2Colt DCS Villebon-sur-Yvette Under construction 40 MW IT — Operator / official
Paris 3Colt DCS Villebon-sur-Yvette Planned 32 MW IT — Operator / official
Paris South WestColt DCS Les Ulis Operational 24 MW IT — Operator / official
DC5Scaleway Saint-Ouen-l'Aumône Operational 20 MW IT — Operator / official
TH3 Paris Magny – Magny 2Telehouse Magny-les-Hameaux Operational 18 MW total 2023 Operator / official
Paris 4Colt DCS Villebon-sur-Yvette Planned 9.6 MW IT — Operator / official
Data4 PAR02Data4 Marcoussis Operational 5 MW — Operator / official
CyrusOne PAR1 ParisCyrusOne Wissous Operational 4.5 MW IT — Operator / official
Etix Paris #3Etix Everywhere Vélizy-Villacoublay Operational 4.4 MW — Operator / official
Etix Lille #2Etix Everywhere Sainghin-en-Mélantois Operational 3.2 MW — Operator / official
Etix Lille #4Etix Everywhere Fretin Operational 3.2 MW — Operator / official
Etix Lille #3Etix Everywhere Anzin Operational 1.5 MW — Operator / official
Etix Nantes #3Etix Everywhere Couëron Operational 1.2 MW — Operator / official
Etix Nantes #2Etix Everywhere Carquefou Operational 0.9 MW — Operator / official
Etix Lille #1Etix Everywhere Tourcoing Operational 0.6 MW — Operator / official
Etix Paris #1Etix Everywhere Paris Operational 0.5 MW — Operator / official
Etix Nantes #1Etix Everywhere Saint-Herblain Operational 0.4 MW — Operator / official
Etix Montpellier #1Etix Everywhere Montpellier Operational 0.3 MW — Operator / official
Etix Toulouse #1Etix Everywhere Balma Operational 0.3 MW — Operator / official
Etix Lyon #1Etix Everywhere Lyon Operational 0.2 MW — Operator / official
Etix Vendée #1Etix Everywhere La Roche-sur-Yon Operational 0.2 MW — Operator / official
Antibes Data CenterCogent Antibes Operational — — Operator / official
Bordeaux Data CenterCogent Bordeaux Operational — — Operator / official
Campus IA Fouju (phase 1: DC1, DC2, DC4)Campus IA
History
  1. Planned
  2. Planned
Fouju Planned — — Operator / official
Digital Realty MRS1Digital Realty Marseille Operational — — Operator / official
Digital Realty MRS2Digital Realty Marseille Operational — — Operator / official
Digital Realty MRS3Digital Realty Marseille Operational — — Operator / official
Digital Realty MRS4Digital Realty Marseille Operational — — Operator / official
Digital Realty MRS5Digital Realty Marseille Planned — — Operator / official
Dijon Data CenterCogent Dijon Operational — — Operator / official
Equinix BX1Equinix Bruges Operational — — Operator / official
Equinix PA13xEquinix Meudon Operational — — Operator / official
Grenoble Data CenterCogent Grenoble Operational — — Operator / official
Lille Data CenterCogent Lille Operational — — Operator / official
Montpellier Data CenterCogent Montpellier Operational — — Operator / official
Nantes Data CenterCogent Nantes Operational — — Operator / official
Nice Data CenterCogent Nice Operational — — Operator / official
Opcore LYO1Opcore Lyon Operational — — Operator / official

Get the data

Every data center in France, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

Data Centers in France: Capacity Sheet

109 facilities

Every tracked data center in France with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

4,461 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in France

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

France

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in France?

DC Market Insights tracks 109 data centers in France as of November 2026: 93 operational, 2 under construction and 14 planned, run by 20 operators. The count grows as we verify more sites.

What is the data center capacity of France?

Tracked operational capacity in France is 338 MW, with 216 MW under construction and 2,206 MW planned. These totals use the capacity each source states (IT load where given) and cover 33 of 109 tracked facilities.

Which companies operate the most data center capacity in France?

By tracked operational capacity, the largest operators in France are Data4 (255 MW), Colt DCS (24 MW) and Scaleway (20 MW).

Where are the data centers in France located?

The largest clusters by tracked capacity are Paris (57 facilities), Escaudain (1 facilities) and Bordeaux (3 facilities). The map above shows every site.

Which new data centers are being built in France?

We track 216 MW under construction and 2,206 MW planned. The largest projects are Data4 Escaudain campus (700 MW), Vantage Bordeaux campus (400 MW) and Data4 PAR03 AI campus (250 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does France have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See France capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.