Every data center in France that we have verified: operator, location, status and capacity, each checked against its source.
By Amit JainReviewed by Deepti AgrawalUpdated 26 Nov 2026
In short
As of 26 November 2026, DC Market Insights tracks 109 data centers in France run by 20 operators: 93 operational, 2 under construction and 14 planned. Stated operational capacity is 338 MW, with a further 216 MW under construction and 2,206 MW planned. Data4 holds the largest share of tracked operational capacity (75%).
109Facilities tracked
20Operators
338 MWOperational (93 sites)
216 MWUnder construction (2 sites)
2,206 MWPlanned (14 sites)
MW = IT capacity where the source states it, otherwise total capacity. 33 of 109 facilities have a stated capacity; the others are counted as sites only.
OperationalUnder constructionPlannedPin = exact site location; dot = city (approximate)
Market snapshot
France data center market: key facts
Capacity under construction or planned (2,422 MW) is 7.2 times the operational base of 338 MW.
The three largest operators by operational capacity, Data4, Colt DCS and Scaleway, hold 88% of tracked operational MW.
Data4 has the largest development pipeline in France: 950 MW under construction or planned.
The largest operational facility we track is Data4 PAR01 campus (Data4, Nozay) at 250 MW.
The largest project in the pipeline is Data4 Escaudain campus (700 MW, planned).
Paris is the largest cluster: 57 of 109 facilities and 55% of tracked capacity.
By type, the tracker lists 59 colocation, 37 hyperscale and 13 edge facilities.
5 facilities publish a PUE figure; the lowest is 1.36 at Opcore PAR3 (Opcore) and the median is 1.45.
33 of 109 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational338 MW
Under construction216 MW
Planned2,206 MW
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Largest operators in France by tracked capacity, MW
Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.
Data Centers in France: Capacity Sheet
109 facilities
Every tracked data center in France with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.
Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
A second analyst re-opens each source before a facility is published.
Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers are there in France?
DC Market Insights tracks 109 data centers in France as of November 2026: 93 operational, 2 under construction and 14 planned, run by 20 operators. The count grows as we verify more sites.
What is the data center capacity of France?
Tracked operational capacity in France is 338 MW, with 216 MW under construction and 2,206 MW planned. These totals use the capacity each source states (IT load where given) and cover 33 of 109 tracked facilities.
Which companies operate the most data center capacity in France?
By tracked operational capacity, the largest operators in France are Data4 (255 MW), Colt DCS (24 MW) and Scaleway (20 MW).
Where are the data centers in France located?
The largest clusters by tracked capacity are Paris (57 facilities), Escaudain (1 facilities) and Bordeaux (3 facilities). The map above shows every site.
Which new data centers are being built in France?
We track 216 MW under construction and 2,206 MW planned. The largest projects are Data4 Escaudain campus (700 MW), Vantage Bordeaux campus (400 MW) and Data4 PAR03 AI campus (250 MW).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity does France have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.