In short

As of 25 November 2026, DC Market Insights tracks 55 data centers in Mexico run by 21 operators: 45 operational, 3 under construction and 7 planned. Stated operational capacity is 187 MW, with a further 306 MW under construction and 1,000 MW planned. Ascenty holds the largest share of tracked operational capacity (43%).

55Facilities tracked
21Operators
187 MWOperational (45 sites)
306 MWUnder construction (3 sites)
1,000 MWPlanned (7 sites)

MW = IT capacity where the source states it, otherwise total capacity. 15 of 55 facilities have a stated capacity; the others are counted as sites only.

Querétaro 1 (QRO1) · Ascenty · Colón (approximate location)Querétaro 2 (QRO2) · Ascenty · Querétaro (approximate location)Querétaro 3 (QRO3) · Ascenty · Querétaro (approximate location)MX1 · Equinix · Querétaro (approximate location)MX2 · Equinix · Querétaro (approximate location)MO1 · Equinix · Monterrey (approximate location)DC QR01 · ODATA · Querétaro (approximate location)DC QR02 · ODATA · Querétaro (approximate location)DC QR03 · ODATA · El Marqués (approximate location)KIO QRO3 · KIO Networks · El Marqués (approximate location)KIO MEX8 · KIO Networks · Mexico City (approximate location)KIO MTY2 · KIO Networks · Pesquería (approximate location)CloudHQ Querétaro campus · CloudHQ · Querétaro (approximate location)AWS Mexico (Central) Region · Amazon Web Services · Querétaro (approximate location)Microsoft México Central region · Microsoft · Querétaro (approximate location)Google Cloud Querétaro region · Google · Querétaro (approximate location)Oracle Cloud Querétaro region · Oracle · Querétaro (approximate location)Oracle Cloud Monterrey region · Oracle · Monterrey (approximate location)Triara Querétaro · Telmex · Querétaro (approximate location)Triara Monterrey · Telmex · Monterrey (approximate location)Telmex Centro de Datos Ciudad de México · Telmex · Mexico City (approximate location)Telmex Centro de Datos Guadalajara · Telmex · Guadalajara (approximate location)Telmex Centro de Datos Cancún · Telmex · Cancún (approximate location)Telmex Triara Tijuana · Telmex · Tijuana (approximate location)Telmex Triara Chihuahua · Telmex · Chihuahua (approximate location)TERRANOVA Querétaro (first Mexico data center) · TERRANOVA · Querétaro (approximate location)DataPark Tultitlán · Axtel · Tultitlán (approximate location)Complejo Tecnológico LE, CPD I · BBVA · Atizapán de Zaragoza (approximate location)Complejo Tecnológico LE, CPD II · BBVA · Atizapán de Zaragoza (approximate location)CEMEX Global Data Center · CEMEX · Monterrey (approximate location)Centro de Cómputo Principal de la CNBV · Comisión Nacional Bancaria y de Valores · Mexico City (approximate location)EDGE Data Center MTY · Flō Networks · Monterrey (approximate location)Centro de Datos Principal IFT · Instituto Federal de Telecomunicaciones · Mexico City (approximate location)redIT DataPark · Metro Net · Huixquilucan (approximate location)Data Center MTP Santa Fe · Mexico Telecom Partners · Mexico City (approximate location)KIO QRO1 · KIO Networks · El Marqués (exact location)KIO QRO2 · KIO Networks · El Marqués (exact location)KIO MEX1 · KIO Networks · Mexico City (exact location)KIO MEX2 · KIO Networks · Mexico City (exact location)KIO MEX3 · KIO Networks · Mexico City (exact location)KIO MEX4 · KIO Networks · Huixquilucan (exact location)KIO MEX5 · KIO Networks · Tultitlán (exact location)KIO MEX6 · KIO Networks · Lerma (exact location)KIO MTY1 · KIO Networks · San Pedro Garza García (exact location)KIO HER1 · KIO Networks · Hermosillo (exact location)KIO MER1 · KIO Networks · Mérida (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Mexico data center market: key facts

  • Capacity under construction or planned (1,306 MW) is 7.0 times the operational base of 187 MW.
  • The three largest operators by operational capacity, Ascenty, ODATA and KIO Networks, hold 93% of tracked operational MW.
  • CloudHQ has the largest development pipeline in Mexico: 900 MW under construction or planned.
  • The largest operational facility we track is DC QR01 (ODATA, Querétaro) at 32 MW.
  • The largest project in the pipeline is CloudHQ Querétaro campus (900 MW, planned).
  • Querétaro is the largest cluster: 20 of 55 facilities and 98% of tracked capacity.
  • By type, the tracker lists 32 colocation, 15 hyperscale and 5 enterprise facilities.
  • 4 facilities publish a PUE figure; the lowest is 1.70 at KIO MEX1 (KIO Networks) and the median is 1.70.
  • 15 of 55 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational187 MW
Under construction306 MW
Planned1,000 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Mexico by tracked capacity, MW
CloudHQ900 MW
ODATA374 MW
Ascenty81 MW
TERRANOVA8.1 MW

OperationalUnder construction or planned

Capacity by market in Mexico, MW
Querétaro1,470 MW
San Miguel de Allende12 MW
Tepotzotlán7.1 MW
Mexico City4 MW

OperationalUnder construction or planned

Facilities by type
Colocation32
Hyperscale15
Enterprise5
Other2
Edge1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Mexico data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 15 October 2026. Government sources are linked; the full source list comes with the Excel data.

Mexico's 2025 Electricity Sector Law keeps state utility CFE dominant: the State must hold at least 54% of energy injected into the grid, and private plants work within SENER planning. Data centres can build their own plants under the self-supply regime (0.7 MW and up, simplified permits to 20 MW), now processed through a single SENER window with fixed deadlines. Load centres of 1 MW or more sign the CNE model connection contract. Grid congestion, above all in Querétaro, is the main constraint. Clean energy was 24.3% of generation in 2024; the goal is 38% by 2030. Cámara de Diputados, Ley del Sector Eléctrico (DOF 18-03-2025)

Policy and incentives

The Ley del Sector Eléctrico (DOF 18 Mar 2025) requires the State to keep at least 54% of the average energy injected into the grid; private generation fills the rest under SENER planning. Ley del Sector Eléctrico, Art. 12

Self-supply (autoconsumo) covers own plants of 0.7 MW or more, isolated or interconnected; interconnected plants of 0.7 to 20 MW get a simplified CNE permit. Ley del Sector Eléctrico, Arts. 30-32

SENER's Ventanilla Única de Autoconsumo (guidelines signed 4 May 2026) handles 0.7 to 20 MW self-supply projects with fixed deadlines: CNE permit in 30 business days, CENACE studies in 30. DOF (SIDOF), Lineamientos Ventanilla Única de Autoconsumo

A SENER/CNE study, 'Integración de Centros de Datos al Sistema Eléctrico Nacional' (May 2026), expects about 1,500 MW of new data-centre demand by 2030 (2.86% of peak demand) and about US$18bn of investment, and proposes self-supply, storage and flexible operation.

Power and grid

CNE model contract (DOF 17 Mar 2026): load centres of 1 MW or more sign an interconnection/connection contract, pay for specific works and post guarantees; CENACE instructs signing within 10 business days. DOF (SIDOF), CNE modelo de contrato de interconexión y conexión

SENER/CNE say new transmission lines can take 4 to 8 years; congestion is worst in Querétaro. About 7,000 MW of load requests were under study in December 2025.

CFE energized substations in Querétaro in January 2026 adding 26.8 MW, including 2 MW for AWS and 18.8 MW for ODATA.

Sustainability, water and climate

Clean energy made 24.32% of power generation in 2024; PROSENER 2025-2030 targets 38% by 2030. DOF (SIDOF), Programa Sectorial de Energía 2025-2030

Official grid emission factor for 2023: 0.438 tCO2e/MWh. Gobierno de México, Aviso FE-SEN 2023

Data rules

New personal data law (DOF 20 Mar 2025, in force 21 Mar 2025) allows national and international transfers and has no data localisation rule; the Secretaría Anticorrupción y Buen Gobierno enforces it. Cámara de Diputados, LFPDPPP

Operators in Mexico

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
KIO Networks1419 MW104 MW10%
Telmex7———
Scala Data Centers65.1 MW2 MW2.7%
ODATA474 MW300 MW40%
Equinix4———
Ascenty381 MW—43%
BBVA2———
Oracle2———
TERRANOVA18.1 MW—4.3%
Microsoft1———
Metro Net1———
Instituto Federal de Telecomunicaciones1———
Flō Networks1———
Comisión Nacional Bancaria y de Valores1———
CEMEX1———
Axtel1———
Amazon Web Services1———
NextStream1———
Mexico Telecom Partners1———
Google1———
CloudHQ1—900 MW—

Largest data center projects in Mexico

Under construction and planned facilities with a stated capacity, largest first. 306 MW under construction and 1,000 MW planned in total.

ProjectLocationStatusTypeCapacity
CloudHQ Querétaro campusCloudHQ Querétaro Planned Hyperscale 900 MW
DC QR03ODATA El Marqués Under construction Hyperscale 300 MW
KIO QRO3KIO Networks El Marqués Planned Colocation 100 MW
KIO MEX8KIO Networks Mexico City Under construction Colocation 4 MW
SMEXTP02Scala Data Centers Tepotzotlán Under construction Hyperscale 2 MW

How Mexico compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States1,34317311,428 MW67,165 MW
Canada10022508 MW9,877 MW
Brazil17361493 MW3,751 MW
Mexico5521187 MW1,306 MW
Chile5523115 MW1,029 MW
Argentina171514.5 MW920 MW
Uruguay95—500 MW
Paraguay65300 MW106 MW
Colombia372514.8 MW183 MW
Guatemala1082.9 MW52 MW
Peru221224.7 MW—
Ecuador1261 MW16 MW

Data center deals in Mexico

Our Deal Tracker lists 1 deals in Mexico since August 2026, with $1.30B in disclosed value.

All Mexico deals in the Deal Tracker

Facilities

55 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CloudHQ Querétaro campusCloudHQ Querétaro Planned 900 MW IT — Trade press
DC QR03ODATA El Marqués Under construction 300 MW IT — Operator / official
KIO QRO3KIO Networks El Marqués Planned 100 MW total — Operator / official
DC QR01ODATA Querétaro Operational 32 MW total — Operator / official
Querétaro 2 (QRO2)Ascenty Querétaro Operational 31 MW total — Operator / official
DC QR02ODATA Querétaro Operational 30 MW total — Operator / official
Querétaro 1 (QRO1)Ascenty Colón Operational 25 MW total — Operator / official
Querétaro 3 (QRO3)Ascenty Querétaro Operational 25 MW total — Operator / official
DC QR04ODATA
History
  1. Operational
  2. Planned
San Miguel de Allende Operational 12 MW IT — Operator / official
KIO QRO2KIO Networks
History
  1. Operational
  2. Operational
  3. Operational
El Marqués Operational 12 MW IT 2025 Operator / official
TERRANOVA Querétaro (first Mexico data center)TERRANOVA Querétaro Operational 8.1 MW IT — Trade press
KIO QRO1KIO Networks El Marqués Operational 7 MW IT — Operator / official
SMEXTP01Scala Data Centers Tepotzotlán Operational 5.1 MW IT — Operator / official
KIO MEX8KIO Networks
History
  1. Under construction
  2. Under construction
Mexico City Under construction 4 MW IT — Operator / official
SMEXTP02Scala Data Centers Tepotzotlán Under construction 2 MW IT — Operator / official
AWS Mexico (Central) RegionAmazon Web Services Querétaro Operational — 2025 Operator / official
CEMEX Global Data CenterCEMEX Monterrey Operational — — Operator / official
Centro de Cómputo Principal de la CNBVComisión Nacional Bancaria y de Valores Mexico City Operational — — Operator / official
Centro de Datos Principal IFTInstituto Federal de Telecomunicaciones Mexico City Operational — — Operator / official
Complejo Tecnológico LE, CPD IBBVA Atizapán de Zaragoza Operational — — Operator / official
Complejo Tecnológico LE, CPD IIBBVA Atizapán de Zaragoza Operational — — Operator / official
Data Center MTP Santa FeMexico Telecom Partners Mexico City Operational — — Operator / official
DataPark TultitlánAxtel Tultitlán Operational — — Operator / official
EDGE Data Center MTYFlō Networks Monterrey Operational — — Operator / official
Google Cloud Querétaro regionGoogle Querétaro Operational — 2024 Operator / official
Ixtlahuaca Data Center (Phase 1)NextStream Ixtlahuaca de Rayón Operational — — Operator / official
KIO HER1KIO Networks Hermosillo Operational — — Operator / official
KIO MER1KIO Networks Mérida Operational — — Operator / official
KIO MEX1KIO Networks Mexico City Operational — — Operator / official
KIO MEX2KIO Networks Mexico City Operational — — Operator / official
KIO MEX3KIO Networks Mexico City Operational — — Operator / official
KIO MEX4KIO Networks Huixquilucan Operational — — Operator / official
KIO MEX5KIO Networks Tultitlán Operational — — Operator / official
KIO MEX6KIO Networks Lerma Operational — — Operator / official
KIO MTY1KIO Networks San Pedro Garza García Operational — — Operator / official
KIO MTY2KIO Networks Pesquería Planned — — Operator / official
Microsoft México Central regionMicrosoft Querétaro Operational — 2024 Operator / official
MO1Equinix Monterrey Operational — — Operator / official
MO2Equinix Operational — — Operator / official
MX1Equinix Querétaro Operational — — Operator / official
MX2Equinix Querétaro Operational — — Operator / official
Oracle Cloud Monterrey regionOracle Monterrey Operational — 2023 Operator / official
Oracle Cloud Querétaro regionOracle Querétaro Operational — 2022 Operator / official
redIT DataParkMetro Net Huixquilucan Operational — — Operator / official
SMEXSJ01, SMEXSJ03, SMEXSJ04Scala Data Centers San Juan del Río Planned — — Operator / official
SMEXSJ02Scala Data Centers San Juan del Río Planned — — Operator / official
SQROQT01-SQROQT02Scala Data Centers Querétaro Planned — — Operator / official
SQROQT03-SQROQT04Scala Data Centers Querétaro Planned — — Operator / official
Telmex Centro de Datos CancúnTelmex Cancún Operational — — Operator / official
Telmex Centro de Datos Ciudad de MéxicoTelmex Mexico City Operational — — Operator / official

Get the data

Every data center in Mexico, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

Data Centers in Mexico: Capacity Sheet

55 facilities

Every tracked data center in Mexico with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

4,569 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Mexico

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Mexico

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Mexico?

DC Market Insights tracks 55 data centers in Mexico as of November 2026: 45 operational, 3 under construction and 7 planned, run by 21 operators. The count grows as we verify more sites.

What is the data center capacity of Mexico?

Tracked operational capacity in Mexico is 187 MW, with 306 MW under construction and 1,000 MW planned. These totals use the capacity each source states (IT load where given) and cover 15 of 55 tracked facilities.

Which companies operate the most data center capacity in Mexico?

By tracked operational capacity, the largest operators in Mexico are Ascenty (81 MW), ODATA (74 MW) and KIO Networks (19 MW).

Where are the data centers in Mexico located?

The largest clusters by tracked capacity are Querétaro (20 facilities), San Miguel de Allende (1 facilities) and Tepotzotlán (2 facilities). The map above shows every site.

Which new data centers are being built in Mexico?

We track 306 MW under construction and 1,000 MW planned. The largest projects are CloudHQ Querétaro campus (900 MW), DC QR03 by ODATA (300 MW) and KIO QRO3 (100 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Mexico have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Mexico capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy