Data Center Power & Policy in Thailand
Every government action on data centers and power in Thailand that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 21 November 2026, DC Market Insights tracks 14 government actions on data centers and power in Thailand, 9 of them in force. We have found no moratorium or restriction on new data centers in force in Thailand. 2 incentive schemes apply, including BOI data center incentive terms: 8 or 5 years CIT exemption, one level lower in the EEC.
Market snapshot
Thailand power and policy: key facts
- Industrial electricity price: 120 USD/MWh (2026). Rank 13 of 30 tracked countries, highest first.
- Grid emission factor: 0.48 kgCO2/kWh (2026). Rank 8 of 36 tracked countries, highest first.
- Latest change: Ft for Jan-Apr 2027: two-tier proposal, 103.34 satang for medium and large users (Energy Regulatory Commission (ERC), 17 Nov 2026).
- By type: 4 regulation, 3 power tariff, 2 incentive and 2 grid access.
Power indicators for Thailand
Latest official figure for each indicator, with earlier years where we have them.
In force now in Thailand
Grid access (1)
EGAT and PEA EEC grid reinforcement for 1,150 MW of data center demand
EGAT and the Ministry of Energy are upgrading EEC substations under the Quick Big Win policy to meet urgent data center demand of 1,150 MW, with new PEA delivery points at Rayong 2 (150 MW), Phanthong (250 MW) and Phanthong 2 (250 MW, Dec 2026), plus Pluak Daeng and Sattahip upgrades.
1,150 MW
Power tariff (2)
Tariff restructure from Sep 2026 bills: public-lighting cost removed, average about 3.89 THB/kWh
ERC removed public-lighting costs from the base tariff from September 2026 bills, cutting the base from 3.78 to about 3.72 THB per unit and the average from 3.95 to about 3.89 THB per unit excluding VAT; the Ft stays at 16.23 satang and the first 200 residential units are capped at 3 THB.
3.89 THB/kWh approximate average, excl. VAT
Ft for Sep-Dec 2026 held at 16.23 satang/kWh (average 3.95 THB/kWh)
ERC kept the fuel adjustment charge (Ft) for Sep-Dec 2026 at 16.23 satang per unit, unchanged from May-Aug 2026, so the national average tariff stays at 3.95 THB per unit excluding VAT. The ERC hearing showed the full Ft formula would have been 94.82 satang (average 4.73 THB); the lower option used a Pool Gas revision and a clawback. Base tariff 3.7833 THB.
16.23 satang/kWh hearing document: https://www.erc.or.th/web-upload/200xf869baf82be74c18cc110e974eea8d5c/202607/m_publichearing/8776/601/file_download/5e0b74ed380a5f11a4b8537a757b9358.pdf
Incentive (2)
BOI data center incentive terms: 8 or 5 years CIT exemption, one level lower in the EEC
BOI's August 2026 investor presentation gives the data center corporate income tax exemption as 8 years for PUE of 1.3 or lower and 5 years for PUE above 1.3; the incentive group is lowered by one level for data centers in the Eastern Economic Corridor (EEC). Conditions include at least 2 MW IT load, ISO/IEC 27001 before using the exemption, a water plan and a certificate of power supply capacity from the utility.
8 years CIT exemption for PUE 1.3
BOI Announcement Sor. 5/2568: data center promotion split by PUE (activities 8.2.1.1 and 8.2.1.2)
BOI amended Announcement 9/2565 for data center activity 8.2.1, for applications submitted from 1 Jul 2025: data centers with PUE not exceeding 1.3 (8.2.1.1) get incentive group A2, other data centers (8.2.1.2) get A3. Both need IT load of at least 2 MW, telecom connections and a water management plan; ISO/IEC 27001 certification is required before the corporate income tax exemption can be used.
1.3 PUE maximum PUE for the A2 category; minimum 2 MW IT load for both
Renewable energy (1)
Direct PPA pilot for data centers, 2,000 MW
National pilot allowing renewable generators to sell power directly to end users through third-party access, aimed at data center companies whose parent companies require renewable electricity; pilot trading volume 2,000 MW. Policy approved by the National Energy Policy Council in 2024 (date from law-firm commentary).
2,000 MW pilot volume; NEPC approval date 25 Jun 2024 from Hunton Andrews Kurth (secondary)
Regulation (2)
PM's Office Regulation on the Data Center Business Policy Committee B.E. 2569
Cabinet approved on 5 Aug 2026 a Prime Minister's Office regulation setting up a Data Center Business Policy Committee chaired by a Deputy PM, with the DES, Interior and Energy ministers as deputy chairs. It proposes policies, standards and frameworks to Cabinet covering clean energy, fair energy prices, water allocation, urban planning and zoning, fire safety, data security and community impacts; agencies report every 3 months.
PDPA cross-border transfer rules (Sections 28 and 29)
PDPC notifications under PDPA Sections 28 and 29, issued 25 Dec 2023 and in effect from 24 Mar 2024, allow personal data transfers abroad to destinations with adequate protection standards, or under appropriate safeguards (BCRs, standard contractual clauses, certification). No data localisation requirement.
Plan or strategy (1)
Cloud First Policy committee
Cabinet approved a Cloud First Policy committee chaired by the Minister of Digital Economy and Society, with DGA, the Budget Bureau and BOI as members, to set government cloud use policy and supervise cloud procurement, aiming to make Thailand a regional cloud hub.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Ft for Jan-Apr 2027: two-tier proposal, 103.34 satang for medium and large users
ERC considered Ft estimates for Jan-Apr 2027 on 17 Nov 2026 and opened public comments from 18 to 24 Nov 2026. The standard formula gives a retail Ft of 132.48 satang; EGAT proposes 16.23 satang for households, small businesses and agricultural pumping and 103.34 satang for all other users including medium and large businesses. No decision yet.
103.34 satang/kWh proposed tier for medium and large users, excl. VAT
ERC draft: dedicated licence to sell electricity to data centers
ERC held a public hearing from 19 Sep to 18 Oct 2026 on draft principles creating a specific licence category for distributing electricity to data centers; applicants would disclose supply plans (UGT, Direct PPA, self-generation) and existing sellers would reapply within 180 days after the rule takes effect. It sits alongside the NEPC framework for grid access security deposits for large data center users.
180 days transition for existing sellers
NEPC 2/2569: grid-use security deposit for data centers and Direct PPA opened
NEPC meeting No. 2/2569, chaired by the Prime Minister, approved a framework requiring data center operators to post a security deposit for use of the power grid and to have a water management plan, and unlocked Direct PPA renewable purchases via third-party access for data centers and industry. No deposit amount was published.
UGT1 2026 premium proposed at 0.0375 THB/unit
The ERC Office held a hearing from 7 to 19 Jan 2026 on the 2026 Utility Green Tariff 1 (RECs from existing EGAT hydro): proposed premium 0.0375 THB per unit over the standard tariff (REC 0.0286 plus administration 0.0089). Final adopted figure not confirmed.
0.04 THB/kWh premium over standard tariff
ERC draft Direct PPA Regulation and TPA Code for data centers
ERC released draft Direct PPA rules and a Third Party Access Code on 3 Oct 2025. As reported, eligible data centers need at least 50 MW IT base load per building, BOI promotion, 100% renewable supply and a 10-year power plan; generators at least 1,000 kVA. The wheeling (TPA) charge was still under review in late 2026.
50 MW minimum IT base load per building (draft)
Timeline of data center and power policy in Thailand
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 17 Nov 2026 | Ft for Jan-Apr 2027: two-tier proposal, 103.34 satang for medium and large users | Power tariff | Proposed | Energy Regulatory Commission (ERC) |
| 19 Sep 2026 | ERC draft: dedicated licence to sell electricity to data centers | Regulation | Proposed | Energy Regulatory Commission (ERC) |
| 12 Aug 2026 | Tariff restructure from Sep 2026 bills: public-lighting cost removed, average about 3.89 THB/kWh | Power tariff | In force | Energy Regulatory Commission (ERC) |
| 5 Aug 2026 | PM's Office Regulation on the Data Center Business Policy Committee B.E. 2569 | Regulation | In force | Office of the Prime Minister / Cabinet |
| 4 Aug 2026 | BOI data center incentive terms: 8 or 5 years CIT exemption, one level lower in the EEC | Incentive | In force | Board of Investment of Thailand (BOI) |
| 23 Jul 2026 | Ft for Sep-Dec 2026 held at 16.23 satang/kWh (average 3.95 THB/kWh) | Power tariff | In force | Energy Regulatory Commission (ERC) |
| 15 Jul 2026 | NEPC 2/2569: grid-use security deposit for data centers and Direct PPA opened | Grid access | Announced | National Energy Policy Council (NEPC) |
| 16 Feb 2026 | EGAT and PEA EEC grid reinforcement for 1,150 MW of data center demand | Grid access | In force | EGAT / Ministry of Energy |
| 7 Jan 2026 | UGT1 2026 premium proposed at 0.0375 THB/unit | Renewable energy | Proposed | Office of the Energy Regulatory Commission |
| 3 Oct 2025 | ERC draft Direct PPA Regulation and TPA Code for data centers | Regulation | Proposed | Energy Regulatory Commission (ERC) |
| 5 Jun 2025 | BOI Announcement Sor. 5/2568: data center promotion split by PUE (activities 8.2.1.1 and 8.2.1.2) | Incentive | In force | Board of Investment of Thailand (BOI) |
| 25 Jun 2024 | Cloud First Policy committee | Plan or strategy | In force | Cabinet / Ministry of Digital Economy and Society |
| 25 Jun 2024 | Direct PPA pilot for data centers, 2,000 MW | Renewable energy | In force | Energy Regulatory Commission (ERC) / National Energy Policy Council (NEPC) |
| 25 Dec 2023 | PDPA cross-border transfer rules (Sections 28 and 29) | Regulation | In force | Personal Data Protection Committee (PDPC) |
How Thailand compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in Thailand?
We have found no moratorium or restriction on new data centers in force in Thailand as of 21 November 2026. Proposed or announced measures, if any, are listed in the timeline.
What incentives does Thailand offer data centers?
In force: BOI data center incentive terms: 8 or 5 years CIT exemption, one level lower in the EEC and BOI Announcement Sor. 5/2568: data center promotion split by PUE (activities 8.2.1.1 and 8.2.1.2). Each is listed with its authority and dates on this page.
What does electricity cost for data centers in Thailand?
The industrial electricity price in Thailand was 120 USD/MWh in 2026 (National average tariff 3.95 THB/kWh excl. VAT for Sep-Dec 2026 (all customers, not industrial-only; base 3.7833 + Ft 0.1623), converted at Bank of Thailand 2025 average 32.87 THB/USD. MEA/PEA 69 kV TOU energy 4.1025 on-peak / 2.5849 off-peak THB/kWh plus). Data center contracts can differ by voltage level, contract length and location.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.