Australia Data Center Capacity

Installed data center capacity in Australia (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 November 2026

How much data center capacity Australia has installed, how it compares with the rest of Asia Pacific, and what our trackers show about its sites, operators, deals and rules.

1.5 GWInstalled, end 2025IT load, DC Market Insights estimate
4%Share of Asia Pacific2025
#9Rank among 33 countriesInstalled capacity, 2025
86Sites in our tracker55 with a stated MW

Australia data center capacity at a glance

Australia had about 1.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 4% of the capacity in Asia Pacific and puts Australia at number 9 of the 33 countries in our global model. Our Data Center Tracker holds 86 sites in Australia run by 12 operators: 60 operational, 10 under construction and 16 planned. Our trackers also hold 30 verified deals and 7 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Australia

2,402 MWStated at operational sites (60)
1,537 MWUnder construction (10 sites)
6,601 MWPlanned (16 sites)
12Operators

Largest tracked sites

SiteOperatorCityStatusMW
CDC GregadooCDC Data CentresWagga WaggaPlanned1,400
CDC Kemps CreekCDC Data CentresKemps CreekPlanned1,400
M5 MelbourneNEXTDCMelbournePlanned1,200 IT
Keppel AI Data Centre Campus (Morwell)KeppelMorwellPlanned720
AirTrunk Kurri KurriAirTrunkKurri KurriPlanned551
S7 SydneyNEXTDCSydneyPlanned550 IT
CDC Marsden Park CampusCDC Data CentresSydneyUnder construction504
CDC Laverton CampusCDC Data CentresMelbourneUnder construction400
SYD3AirTrunkSydneyOperational400
S4 SydneyNEXTDCSydneyUnder construction365 IT

Every Australia site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Sydney2791,143
Melbourne1971,076
Canberra105124
Perth6330
Adelaide5310
Brisbane4314
Darwin211
Maroochydore211

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
CDC Data Centres146674,019
NEXTDC265582,367
AirTrunk7895905
Keppel2n/a720
STACK Infrastructure4180n/a
DCI Data Centers6563
Macquarie Data Centres368n/a
Vantage Data Centers1n/a64

Operators ranked by MW stated at their tracked sites in Australia.

Rules in force

  • Plan2026 Electricity Statement of Opportunities, data centre forecasts
  • Plan2026 Integrated System Plan (ISP)
  • TariffJemena site-specific (individually calculated) network tariffs for large HV and sub-transmission customers
  • IncentiveInvestment Delivery Authority endorsement of 15 data centre projects
  • PlanExpectations for Data Centres and AI Infrastructure Developers

From government sources. Power and policy in Australia

Recent deals

  • Nov 2026 · M&AUp to 9.9% of NEXTDC Ltd (ASX: NXT), USD 501 m
  • Oct 2026 · FinancingAirTrunk SYD3 campus, Western Sydney, USD 3.0 bn
  • Oct 2026 · Land / campusDigiCo SYD1 data centre, Sydney (71 MW), 71 MW
  • Oct 2026 · JV / partnershipHyperscale data center campus JV, Australia (initial campuses Sydney and Melbourne, 450 MW power secured), 450 MW
  • Oct 2026 · FinancingZerra DC
  • Sep 2026 · Land / campusFour-building campus at 216 Ashfords Road, Gregadoo, near Wagga Wagga, 1,400 MW, USD 10.7 bn

Deal Tracker

Other countries in Asia Pacific

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Australia in the full data pack

By year to 2035

Installed MW for Australia from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Australia have?

We estimate about 1.5 GW of installed data center capacity (IT load) in Australia at the end of 2025, about 4% of Asia Pacific and number 9 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Australia?

Our Data Center Tracker lists 86 sites in Australia (60 operational, 10 under construction, 16 planned), run by 12 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Australia?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are CDC Data Centres, NEXTDC, AirTrunk. Site capacity is counted only where a source states it.

What rules apply to data centers in Australia?

Our Power and Policy Tracker lists 7 government measures in force for Australia, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Australia data center capacity grow to 2035?

The full data pack gives installed capacity for Australia by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.