Proprietary data

Data Centers in India

Every data center in India that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 19 November 2026, DC Market Insights tracks 199 data centers in India run by 31 operators: 126 operational, 21 under construction and 52 planned. Stated operational capacity is 2,276 MW, with a further 1,714 MW under construction and 6,126 MW planned. AdaniConneX holds the largest share of tracked operational capacity (45%).

199Facilities tracked
31Operators
2,276 MWOperational (126 sites)
1,714 MWUnder construction (21 sites)
6,126 MWPlanned (52 sites)

MW = IT capacity where the source states it, otherwise total capacity. 133 of 199 facilities have a stated capacity; the others are counted as sites only.

AWS Thane (Balkum Pada) Land Parcel · Amazon Web Services · Thane (approximate location)STT Pune 4 · STT GDC India · Pune (approximate location)STT Pune 5 · STT GDC India · Pune (approximate location)STT Ahmedabad 1 · STT GDC India · Gandhinagar (approximate location)STT Bengaluru 1 · STT GDC India · Bengaluru (approximate location)STT Bengaluru 2 · STT GDC India · Bengaluru (approximate location)STT Bengaluru 3 · STT GDC India · Bengaluru (approximate location)STT Chennai 1 · STT GDC India · Chennai (approximate location)STT Chennai 2 · STT GDC India · Chennai (approximate location)STT Chennai 3 · STT GDC India · Chennai (approximate location)STT Chennai 4 · STT GDC India · Chennai (approximate location)STT Chennai 7 · STT GDC India · Chennai (approximate location)STT Delhi 1 · STT GDC India · Delhi (approximate location)STT Delhi 2 · STT GDC India · Delhi (approximate location)STT Delhi 3 · STT GDC India · Delhi (approximate location)STT Hyderabad 1 · STT GDC India · Hyderabad (approximate location)STT Jaipur 1 · STT GDC India · Jaipur (approximate location)STT Kolkata 1 · STT GDC India · Kolkata (approximate location)STT Kolkata 2 · STT GDC India · Kolkata (approximate location)STT Mumbai 1 · STT GDC India · Mumbai (approximate location)STT Mumbai 2 · STT GDC India · Mumbai (approximate location)STT Mumbai 3 · STT GDC India · Mumbai (approximate location)STT Navi Mumbai 1 · STT GDC India · Navi Mumbai (approximate location)STT Navi Mumbai 2 · STT GDC India · Navi Mumbai (approximate location)STT Navi Mumbai 3 · STT GDC India · Navi Mumbai (approximate location)STT Navi Mumbai 4 · STT GDC India · Navi Mumbai (approximate location)STT Palava 1 · STT GDC India · Palava (approximate location)STT Palava 4 · STT GDC India · Palava (approximate location)STT Palava 5 · STT GDC India · Palava (approximate location)STT Noida 1 · STT GDC India · Noida (approximate location)STT Noida 2 · STT GDC India · Noida (approximate location)STT Noida 3 · STT GDC India · Noida (approximate location)STT Pune 1 · STT GDC India · Pune (approximate location)STT Pune 2 · STT GDC India · Pune (approximate location)STT Pune 3 · STT GDC India · Pune (approximate location)Mumbai 5 · NTT DATA · Mumbai (approximate location)Mumbai 6 · NTT DATA · Mumbai (approximate location)Mumbai 7 · NTT DATA · Mumbai (approximate location)Mumbai Vikhroli · NTT DATA · Mumbai (approximate location)Mumbai Vikhroli IV · NTT DATA · Mumbai (approximate location)Mumbai BSE · NTT DATA · Mumbai (approximate location)Navi Mumbai NAV1 campus · NTT DATA · Navi Mumbai (approximate location)Navi Mumbai NAV2 campus · NTT DATA · Navi Mumbai (approximate location)Bengaluru 2 · NTT DATA · Bengaluru (approximate location)Bengaluru 3 · NTT DATA · Bengaluru (approximate location)Bengaluru 4 campus · NTT DATA · Bengaluru (approximate location)Chennai 1 · NTT DATA · Chennai (approximate location)Chennai 2 · NTT DATA · Chennai (approximate location)Noida 1 · NTT DATA · Noida (approximate location)Noida 2 · NTT DATA · Noida (approximate location)Kolkata 1 · NTT DATA · Kolkata (approximate location)Nxtra Chennai hyperscale data centre (38 MW) · Nxtra (Airtel) · Chennai (approximate location)Nxtra Pune Campus · Nxtra (Airtel) · Pune (approximate location)Nxtra Mumbai 90 MW Campus · Nxtra (Airtel) · Mumbai (approximate location)Nxtra Kolkata (KOL 1), New Town · Nxtra (Airtel) · Kolkata (approximate location)Nxtra Hyderabad (HYD 1), Kokapet · Nxtra (Airtel) · Hyderabad (approximate location)Sify Rabale · Sify · Navi Mumbai (approximate location)Sify Airoli · Sify · Navi Mumbai (approximate location)Sify Vashi · Sify · Navi Mumbai (approximate location)Sify Chennai 01 (Tidel Park) · Sify · Chennai (approximate location)Sify Chennai 02 (Siruseri) · Sify · Chennai (approximate location)Sify Noida 01 · Sify · Noida (approximate location)Sify Noida 02 · Sify · Noida (approximate location)Sify Bengaluru 01 · Sify · Bengaluru (approximate location)Sify Bengaluru 02 (Aerospace Park) · Sify · Bengaluru (approximate location)Sify Hyderabad 01 · Sify · Hyderabad (approximate location)Sify Hyderabad 02 (Fab City) · Sify · Hyderabad (approximate location)Sify Kolkata 01 · Sify · Kolkata (approximate location)Sify AI Edge Chandigarh 01 · Sify · Chandigarh (approximate location)Sify AI Edge Lucknow 01 · Sify · Lucknow (approximate location)Sify AI Edge Nagpur 01 · Sify · Nagpur (approximate location)Sify AI Edge Kolkata 02 · Sify · Kolkata (approximate location)Mumbai DC1 & DC2 · CtrlS · Navi Mumbai (approximate location)Mumbai DC3 · CtrlS · Navi Mumbai (approximate location)Mumbai DC4 · CtrlS · Navi Mumbai (approximate location)Mumbai DC5 · CtrlS · Navi Mumbai (approximate location)Mumbai DC6 & DC7 · CtrlS · Navi Mumbai (approximate location)Chennai Datacenter Park · CtrlS · Chennai (approximate location)Hyderabad DC1 · CtrlS · Hyderabad (approximate location)Hyderabad DC2 · CtrlS · Hyderabad (approximate location)Hyderabad DC3 · CtrlS · Hyderabad (approximate location)Noida DC1 · CtrlS · Noida (approximate location)Bangalore DC1 · CtrlS · Bengaluru (approximate location)Kolkata DC1 · CtrlS · Kolkata (approximate location)Hyderabad Future City Campus · CtrlS · Hyderabad (approximate location)Lucknow Edge DC · CtrlS · Lucknow (approximate location)Patna Edge DC1 · CtrlS · Patna (approximate location)Patna Edge DC2 · CtrlS · Patna (approximate location)Ahmedabad Edge DC · CtrlS · Ahmedabad (approximate location)Hyderabad Chandan Valley Campus · CtrlS · Hyderabad (approximate location)Bhubaneswar Edge DC · CtrlS · Bhubaneswar (approximate location)Bhopal Edge DC · CtrlS · Bhopal (approximate location)Kochi Edge DC · CtrlS · Kochi (approximate location)Yotta NM1 · Yotta · Navi Mumbai (approximate location)Yotta D1 · Yotta · Greater Noida (approximate location)Yotta G1 · Yotta · GIFT City (approximate location)Yotta TB1 · Yotta · Navi Mumbai (approximate location)Yotta TB2 · Yotta · Navi Mumbai (approximate location)Yotta Chennai Data Center Park · Yotta · Chennai (approximate location)Yotta Kolkata Data Center Park · Yotta · Kolkata (approximate location)AdaniConneX Chennai 1 · AdaniConneX · Chennai (approximate location)AdaniConneX Hyderabad · AdaniConneX · Hyderabad (approximate location)AdaniConneX Noida · AdaniConneX · Noida (approximate location)AdaniConneX Pune · AdaniConneX · Pune (approximate location)AdaniConneX Navi Mumbai · AdaniConneX · Navi Mumbai (approximate location)AdaniConneX Visakhapatnam · AdaniConneX · Visakhapatnam (approximate location)MAA10 · Digital Connexion · Chennai (approximate location)BOM10 · Digital Connexion · Mumbai (approximate location)Digital Connexion Visakhapatnam Campus · Digital Connexion · Visakhapatnam (approximate location)MUM-1 · Iron Mountain · Navi Mumbai (approximate location)MUM-2 · Iron Mountain · Navi Mumbai (approximate location)MUM-3 · Iron Mountain · Navi Mumbai (approximate location)Pune Data Center · iron-mountain · Pune (approximate location)Delhi-NCR Data Center · iron-mountain · Noida (approximate location)BLR-1 · iron-mountain · Bengaluru (approximate location)HYD-1 · iron-mountain · Hyderabad (approximate location)MB1 · Equinix · Mumbai (approximate location)MB2 · Equinix · Mumbai (approximate location)MB3 · Equinix · Mumbai (approximate location)MB4 · Equinix · Mumbai (approximate location)CN1 · Equinix · Chennai (approximate location)MU1 · Princeton Digital Group · Navi Mumbai (approximate location)MU1 expansion (three new buildings) · Princeton Digital Group · Navi Mumbai (approximate location)MU2 · Princeton Digital Group · Navi Mumbai (approximate location)HY1 · Princeton Digital Group · Hyderabad (approximate location)CH1 · Princeton Digital Group · Chennai (approximate location)CapitaLand Data Centre Navi Mumbai Tower 1 · CapitaLand · Navi Mumbai (approximate location)CapitaLand Data Centre Navi Mumbai Tower 2 · CapitaLand · Navi Mumbai (approximate location)CapitaLand Data Centre ITPH Hyderabad · CapitaLand · Hyderabad (approximate location)CapitaLand Data Centre Chennai (Ambattur) · CapitaLand · Chennai (approximate location)CapitaLand Data Centre ITPB Bengaluru · CapitaLand · Bengaluru (approximate location)Mumbai 1 and 2 (Navi Mumbai) · Colt DCS · Navi Mumbai (approximate location)Colt Chennai Data Centre (Ambattur) · Colt DCS · Chennai (approximate location)Lumina CloudInfra Airoli Campus · Lumina CloudInfra · Navi Mumbai (approximate location)Lumina CloudInfra Chennai (Ambattur) Campus · Lumina CloudInfra · Chennai (approximate location)BOM1 · Digital Edge · Navi Mumbai (approximate location)BOM2 · Digital Edge · Navi Mumbai (approximate location)BOM3 · Digital Edge · Navi Mumbai (approximate location)BBY01 · Bridge Data Centres · Navi Mumbai (approximate location)Pi Amaravati Data Center · Pi Datacenters · Vijayawada (approximate location)Pi Mumbai Data Center · Pi Datacenters · Mumbai (approximate location)Pi Hyderabad Data Center · Pi Datacenters · Hyderabad (approximate location)RackBank Indore Data Center · RackBank · Indore (approximate location)RackBank Indore AI Data Center · RackBank · Indore (approximate location)RackBank Nava Raipur Data Centre Campus · RackBank · Nava Raipur (approximate location)Techno Digital Chennai Data Center · Techno Digital · Chennai (approximate location)Techno Digital Kolkata Data Center · Techno Digital · Kolkata (approximate location)Anant Raj Manesar Data Centre Park · Anant Raj · Manesar (approximate location)Anant Raj Panchkula Data Centre · Anant Raj · Panchkula (approximate location)Anant Raj Rai Data Centre Park · Anant Raj · Rai (approximate location)Mahape BOM 02 (Navi Mumbai) · L&T Cloudfiniti · Navi Mumbai (approximate location)Panvel Phase 2 · L&T Cloudfiniti · Panvel (approximate location)Panvel BOM 01 · L&T Cloudfiniti · Panvel (approximate location)MAA 01 Sriperumbudur (Chennai) · L&T Cloudfiniti · Sriperumbudur (approximate location)ESDS Nashik DC · ESDS · Nashik (approximate location)ESDS Airoli DC · ESDS · Navi Mumbai (approximate location)ESDS STPI Bengaluru DC · ESDS · Bengaluru (approximate location)ESDS STPI Mohali DC · ESDS · Mohali (approximate location)ESDS STPI Noida DC · ESDS · Noida (approximate location)ESDS STPI Kolkata DC · ESDS · Kolkata (approximate location)ESDS CEL Ghaziabad DC · ESDS · Ghaziabad (approximate location)Google Visakhapatnam AI Hub (Tarluvada) · Google · Visakhapatnam (approximate location)Reliance Jamnagar AI Data Centre · Reliance Jio · Jamnagar (approximate location)AWS Taloja Navi Mumbai Data Centre · Amazon Web Services · Navi Mumbai (approximate location)Chennai DC1 · CtrlS · Chennai (approximate location)Chennai DC2 · CtrlS · Chennai (approximate location)RailTel Gurugram Data Centre · RailTel · Gurugram (approximate location)RailTel Secunderabad Data Centre · RailTel · Secunderabad (approximate location)RailTel Noida Data Centre · RailTel · Noida (approximate location)Microsoft Hyderabad (India South Central) datacenter region · Microsoft · Hyderabad (approximate location)Microsoft Pune (Central India) datacenter region · Microsoft · Pune (approximate location)Microsoft Chennai (South India) datacenter region · Microsoft · Chennai (approximate location)Microsoft Mumbai (West India) datacenter region · Microsoft · Mumbai (approximate location)Microsoft Pune Hinjewadi land parcel (16 acres) · Microsoft · Pune (approximate location)NIC National Data Centre Delhi · National Informatics Centre · Delhi (approximate location)NIC National Data Centre Pune · National Informatics Centre · Pune (approximate location)NIC National Data Centre Hyderabad · National Informatics Centre · Hyderabad (approximate location)NIC National Data Centre Bhubaneswar · National Informatics Centre · Bhubaneswar (approximate location)Cyfuture Noida Data Center 1 · Cyfuture · Noida (approximate location)Cyfuture Noida Data Center 2 · Cyfuture · Noida (approximate location)Cyfuture Jaipur Data Center · Cyfuture · Jaipur (approximate location)Cyfuture Raipur Data Center · Cyfuture · Raipur (approximate location)Bodh Gaya AI Factory · CtrlS · Bodh Gaya (approximate location)Iron Mountain CHN-1 Chennai · Iron Mountain · Chennai (approximate location)Mumbai 3 (Navi Mumbai) · Colt DCS · Navi Mumbai (approximate location)Cyfuture Bangalore Data Center · Cyfuture · Bengaluru (approximate location)Cyfuture Noida Liquid Cooled AI Data Center · Cyfuture · Noida (approximate location)NIC National Data Centre for North Eastern Region (NDC NER) · National Informatics Centre · Amingaon (approximate location)NIC Chandigarh Data Centre · National Informatics Centre · Chandigarh (approximate location)NIC National Data Centre Bhopal (proposed) · National Informatics Centre · Bhopal (approximate location)ESR Rabale MU1 Data Centre · ESR · Navi Mumbai (approximate location)HyperVault Hyderabad AI Data Center Campus · HyperVault · Hyderabad (approximate location)HyperVault Pune (Bopkhel) data center site · HyperVault · Pune (approximate location)Chennai 52 MW AI-ready data centre (Phase 2) · L&T Cloudfiniti · Sriperumbudur (approximate location)Bengaluru Whitefield · L&T Cloudfiniti · Bengaluru (approximate location)Mumbai Edge DC · L&T Cloudfiniti · Mumbai (approximate location)Chennai Edge DC · L&T Cloudfiniti · Chennai (approximate location)Baroda Edge DC · L&T Cloudfiniti · Vadodara (approximate location)Surat Edge DC · L&T Cloudfiniti · Surat (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

India data center market: key facts

  • Capacity under construction or planned (7,840 MW) is 3.4 times the operational base of 2,276 MW.
  • The three largest operators by operational capacity, AdaniConneX, CtrlS and STT GDC India, hold 67% of tracked operational MW.
  • AdaniConneX has the largest development pipeline in India: 2,000 MW under construction or planned.
  • The largest operational facility we track is AdaniConneX Hyderabad (AdaniConneX, Hyderabad) at 600 MW.
  • The largest project in the pipeline is AdaniConneX Navi Mumbai (1,000 MW, planned).
  • Hyderabad is the largest cluster: 17 of 199 facilities and 36% of tracked capacity.
  • By type, the tracker lists 116 colocation, 61 hyperscale and 15 edge facilities.
  • 4 facilities publish a PUE figure; the lowest is 1.35 at Techno Digital Chennai Data Center (Techno Digital) and the median is 1.37.
  • 133 of 199 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational2,276 MW
Under construction1,714 MW
Planned6,126 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
4≤20142'15'16'17'18'19'2038'2133'2228'23613'24422'2577'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in India by tracked capacity, MW
AdaniConneX3,033 MW
CtrlS1,971 MW
HyperVault1,000 MW
Sify478 MW
NTT DATA262 MW

OperationalUnder construction or planned

Capacity by market in India, MW
Hyderabad3,635 MW
Navi Mumbai2,074 MW
Visakhapatnam1,000 MW
Chennai823 MW
Mumbai816 MW
Pune331 MW
Noida278 MW
Sonipat200 MW
Bengaluru197 MW
Dombivali171 MW

OperationalUnder construction or planned

Facilities by type
Colocation116
Hyperscale61
Edge15
Enterprise7

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the India data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 7 October 2026. Government sources are linked; the full source list comes with the Excel data.

India's installed data centre power capacity rose from around 375 MW in 2020 to 1.57 GW as of August 2026, according to the Press Information Bureau. Data centres were added to India's Harmonized List of Infrastructure in the Union Budget 2022-23. Press Information Bureau (Ministry of Information and Broadcasting)

Policy and incentives

Data centres were added to India's Harmonized List of Infrastructure in the Union Budget 2022-23, giving the sector infrastructure status. Press Information Bureau (Ministry of Information and Broadcasting)

Budget 2026-27 proposes a tax holiday until 2047 for eligible foreign cloud providers that use India-based data centres for global operations, covering Tax Year 2026-27 to Tax Year 2046-47. Press Information Bureau

Budget 2026-27 proposes a safe harbour margin of 15 percent on cost for Indian data centre entities operating as cost-plus centres for foreign cloud providers. Press Information Bureau

The Digital Personal Data Protection Rules 2025 were notified in November 2025, operationalising the DPDP Act 2023 with an 18-month phased compliance timeline. Press Information Bureau (Ministry of Electronics and IT)

The Uttar Pradesh Data Centre Policy 2026, notified on 9 July 2026, targets additional data centre capacity of 2 GW and more and offers data centre units a 7% capital subsidy capped at Rs 20 crore. Government of Uttar Pradesh (Invest UP)

Power and grid

The Green Energy Open Access Rules, notified by the Ministry of Power on 6 June 2022, cut the open access threshold for green power from 1 MW to 100 kW. Press Information Bureau (Ministry of Power)

India met an all-time peak electricity demand of 256.1 GW on 25 April 2026 without any shortage, according to the Ministry of Power. Press Information Bureau (Ministry of Power)

As of 31 March 2026, India had 283.46 GW of non-fossil installed capacity, made up of 274.68 GW renewable energy and 8.78 GW nuclear. Press Information Bureau (Ministry of New and Renewable Energy)

The Uttar Pradesh Data Centre Policy 2026 offers data centre units a 100% electricity duty exemption for 10 years from commercial operation and allows open access power purchase for units outside data centre parks. Government of Uttar Pradesh (Invest UP)

Tamil Nadu's Data Centre Policy 2021 offered electricity at industrial tariff and dual power supply to data centres set up between 1 April 2021 and 31 March 2026. ELCOT (Electronics Corporation of Tamil Nadu), Government of Tamil Nadu

Land, zoning and sites

The Uttar Pradesh Data Centre Policy 2026, notified on 9 July 2026, gives 100% stamp duty exemption on purchase or lease of land from a government authority or entity, and 50% exemption on the second transaction. Department of IT and Electronics, Government of Uttar Pradesh (Invest UP)

Under the Uttar Pradesh Data Centre Policy 2026, land bought or leased by a data centre during the policy period gets a base FAR of 3.0 free of charge, plus an additional FAR of 1.0 on a chargeable basis. Invest UP, Government of Uttar Pradesh

The Uttar Pradesh Data Centre Policy 2026 offers a 25% land subsidy on sector rates for land from state agencies in Madhyanchal and Paschimanchal, and 50% in Bundelkhand and Purvanchal. It defines a data centre park as a minimum of 40 MW total load. Invest UP, Government of Uttar Pradesh

The Tamil Nadu Data Centre Policy 2021 gave a 50% stamp duty concession in Category A and B districts and a 100% exemption in Category C districts for land bought or leased from ELCOT, SIDCO or SIPCOT. Information Technology Department, Government of Tamil Nadu

Demand and connectivity

TRAI reported 1,101.21 million broadband subscribers in India at the end of August 2026, up from 1,094.48 million at the end of July 2026. Total telephone subscribers were 1,360.70 million. Telecom Regulatory Authority of India (TRAI)

Under the IndiaAI Mission, more than 38,000 high-end GPUs have been made available at Rs 65 per hour, and the government announced 20,000 more GPUs to be added (PIB, 17 February 2026). Press Information Bureau (PIB)

TRAI stated in June 2023 that 17 submarine cables land at cable landing stations in India, with the highest concentration in Mumbai and Chennai. Telecom Regulatory Authority of India (TRAI)

MeitY stated in March 2026 that four submarine cable systems were being commissioned (India Europe Xpress, SEA-ME-WE-6, 2Africa and Raman). It also stated that data centre capacity in India grew from 375 MW in 2020 to more than 1,500 MW by 2025. Press Information Bureau (PIB), Ministry of Electronics and IT

Sustainability, water and climate

As of 31 July 2026, India had 300.50 GW of non-fossil installed power capacity. This is over 54% of total installed capacity of about 552 GW. Press Information Bureau (PIB), Ministry of New and Renewable Energy

MNRE stated in August 2026 that the 300 GW of non-fossil capacity is over 60% of the 500 GW non-fossil capacity targeted for 2030. Solar accounts for 164.59 GW of it. Press Information Bureau (PIB), Ministry of New and Renewable Energy

India's updated NDC (August 2022) targets a 45% cut in the emissions intensity of GDP by 2030 from 2005 levels, and 50% of installed power capacity from non-fossil sources by 2030. Press Information Bureau (PIB), Ministry of Environment, Forest and Climate Change

The Central Ground Water Authority issued 12,650 groundwater extraction NOCs to industries drawing 10,000 litres per day or more between 1 January 2018 and 31 December 2022, the Ministry of Jal Shakti told Parliament. Lok Sabha (Ministry of Jal Shakti answer)

Operators in India

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
STT GDC India34217 MW393 MW9.5%
CtrlS24276 MW1,695 MW12%
Sify16188 MW290 MW8.3%
NTT DATA16135 MW127 MW5.9%
L&T Cloudfiniti1032 MW162 MW1.4%
iron-mountain88.3 MW108 MW0.4%
Yotta785 MW—3.7%
National Informatics Centre72 MW—0.1%
ESDS7———
AdaniConneX61,033 MW2,000 MW45%
Cyfuture63 MW10 MW0.1%
CapitaLand550 MW37 MW2.2%
Princeton Digital Group548 MW382 MW2.1%
Nxtra (Airtel)538 MW315 MW1.7%
Microsoft5———
Equinix5———
Pi Datacenters363 MW—2.8%
Anant Raj328 MW200 MW1.2%
Colt DCS322 MW96 MW1%
Digital Connexion320 MW—0.9%
RackBank37 MW160 MW0.3%
Digital Edge3———
RailTel3———
Lumina CloudInfra2—276 MW—
Amazon Web Services2—473 MW—
HyperVault2—1,000 MW—
Techno Digital2—56 MW—
Bridge Data Centres120 MW—0.9%
Google1———
Reliance Jio1———
ESR1—60 MW—

Largest data center projects in India

Under construction and planned facilities with a stated capacity, largest first. 1,714 MW under construction and 6,126 MW planned in total.

ProjectLocationStatusTypeCapacity
AdaniConneX Navi MumbaiAdaniConneX Navi Mumbai Planned Hyperscale 1,000 MW
AdaniConneX VisakhapatnamAdaniConneX Visakhapatnam Under construction Hyperscale 1,000 MW
HyperVault Hyderabad AI Data Center CampusHyperVault Hyderabad Planned Hyperscale 1,000 MW
Hyderabad Future City CampusCtrlS Hyderabad Planned Hyperscale 750 MW
Hyderabad Chandan Valley CampusCtrlS Hyderabad Planned Hyperscale 700 MW
AWS Taloja Navi Mumbai Data CentreAmazon Web Services Navi Mumbai Planned Hyperscale 473 MW
Sify Hyderabad 02 (Fab City)Sify Hyderabad Planned Hyperscale 250 MW
Lumina CloudInfra Chennai (Ambattur) CampusLumina CloudInfra Chennai Planned Hyperscale 216 MW
Anant Raj Rai Data Centre ParkAnant Raj Rai Planned Colocation 200 MW
Nxtra Hyderabad (HYD 1), KokapetNxtra (Airtel) Hyderabad Planned Hyperscale 200 MW
Bodh Gaya AI FactoryCtrlS Bodh Gaya Planned Hyperscale 150 MW
MU2Princeton Digital Group Navi Mumbai Planned Hyperscale 120 MW

How India compares in Asia-Pacific

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
India199312,276 MW7,840 MW
Malaysia81311,248 MW3,511 MW
Indonesia21899 MW1,672 MW
Japan7420697 MW1,059 MW
Australia63170 MW1,138 MW
Singapore5221400 MW315 MW
Uzbekistan1383.1 MW364 MW
Kazakhstan361333.1 MW312 MW
South Korea8468.4 MW228 MW
China209196 MW64 MW
Taiwan361192 MW165 MW
Thailand8625 MW232 MW

Data center deals in India

Our Deal Tracker lists 34 deals in India since January 2026, with $106.59B in disclosed value.

  • Bharti Airtel → Strategic land parcel for data-centre expansion (India) Land / campus $299.1M
  • AdaniConneX → Vizag Mega Data Center Park Limited M&A $114.9M
  • Neysa → AI compute capacity at STT Noida 2, Noida, Uttar Pradesh (first phase up to 9,000 GPUs, live from Q1 CY2027) Land / campus
  • CtrlS Datacenters → 150 MW hyperscale AI factory, Bodh Gaya, Bihar Land / campus $1.05B · 150 MW
  • ReNew Wind Energy Pvt. Ltd. (ReNew) → 750MW green integrated data centre park, Mumbai Metropolitan Region (Panvel, Khalapur, Taloja, Bhokharpada) Land / campus $7.23B · 750 MW
  • Anant Raj Cloud Singapore Pte. Ltd. (Anant Raj); Orange Business Services Singapore Pte. Ltd. → Marketing Haryana-hosted data centre and cloud services (Ashok Cloud) to overseas customers JV / partnership

All India deals in the Deal Tracker

Facilities

199 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Mumbai DC5CtrlS Navi Mumbai Operational 32 MW total — Operator / official
Bengaluru WhitefieldL&T Cloudfiniti Bengaluru Planned 30 MW — Operator / official
MAA 01 Sriperumbudur (Chennai)L&T Cloudfiniti
History
  1. Operational
  2. Operational
  3. Operational
Sriperumbudur Operational 30 MW IT — Operator / official
Navi Mumbai NAV1 campusNTT DATA Navi Mumbai Operational 30 MW IT — Operator / official
Yotta D1Yotta Greater Noida Operational 30 MW IT — Operator / official
STT Navi Mumbai 1STT GDC India Navi Mumbai Planned 28 MW IT — Operator / official
STT Noida 3STT GDC India Noida Planned 28 MW IT — Operator / official
STT Chennai 2STT GDC India Chennai Operational 26 MW IT — Operator / official
Sify Chennai 02 (Siruseri)Sify Chennai Operational 25.9 MW IT — Operator / official
Sify Noida 02Sify Noida Operational 25.9 MW IT — Operator / official
Mumbai 7NTT DATA Mumbai Operational 25.6 MW IT — Operator / official
Kolkata 1NTT DATA Kolkata Planned 25 MW IT — Operator / official
Nxtra Kolkata (KOL 1), New TownNxtra (Airtel) Kolkata Under construction 25 MW IT — Operator / official
STT Pune 5STT GDC India Pune Operational 24 MW IT — Operator / official
Iron Mountain CHN-1 ChennaiIron Mountain Chennai Under construction 23.2 MW total — Operator / official
Noida 2NTT DATA Noida Operational 22.4 MW IT — Trade press
Mumbai 1 and 2 (Navi Mumbai)Colt DCS Navi Mumbai Operational 22 MW IT 2023 Operator / official
STT Noida 2STT GDC India Noida Planned 22 MW IT — Operator / official
Anant Raj Manesar Data Centre ParkAnant Raj Manesar Operational 21 MW total — Trade press
BBY01Bridge Data Centres Navi Mumbai Operational 20 MW IT — Operator / official
MAA10Digital Connexion Chennai Operational 20 MW total — Operator / official
Techno Digital Kolkata Data CenterTechno Digital Kolkata Planned 20 MW total — Trade press
Mumbai 6NTT DATA Mumbai Operational 19.2 MW IT — Operator / official
STT Bengaluru 3STT GDC India Bengaluru Operational 18 MW IT — Operator / official
STT Pune 4STT GDC India Pune Operational 18 MW IT — Operator / official
STT Chennai 4STT GDC India
History
  1. Under construction
  2. Planned
  3. Under construction
Chennai Under construction 17 MW IT — Operator / official
STT Noida 1STT GDC India Noida Operational 17 MW IT — Operator / official
Kolkata DC1CtrlS
History
  1. Operational
  2. Operational
Kolkata Operational 16 MW IT 2025 Operator / official
STT Chennai 3STT GDC India Chennai Operational 15 MW IT — Operator / official
STT Pune 2STT GDC India Pune Operational 15 MW IT — Operator / official
STT Pune 3STT GDC India Pune Operational 15 MW IT — Operator / official
Sify Hyderabad 01Sify Hyderabad Operational 14.4 MW IT — Operator / official
Bangalore DC1CtrlS Bengaluru Operational 13 MW IT — Operator / official
Hyderabad DC3CtrlS
History
  1. Operational
  2. Operational
Hyderabad Operational 13 MW IT 2024 Operator / official
Mumbai 5NTT DATA Mumbai Operational 12.5 MW IT — Operator / official
Bengaluru 3NTT DATA Bengaluru Operational 12 MW IT — Operator / official
Patna Edge DC2CtrlS
History
  1. Operational
  2. Operational
Patna Operational 12 MW IT 2026 Operator / official
Sify Noida 01Sify Noida Operational 11 MW IT — Operator / official
STT Delhi 3STT GDC India Delhi Operational 10.1 MW IT — Operator / official
Cyfuture Noida Liquid Cooled AI Data CenterCyfuture Noida Under construction 10 MW IT — Operator / official
Mumbai DC3CtrlS Navi Mumbai Operational 10 MW total — Operator / official
Ahmedabad Edge DCCtrlS Ahmedabad Operational 9.2 MW IT — Operator / official
STT Mumbai 3STT GDC India Mumbai Operational 9 MW IT — Operator / official
STT Pune 1STT GDC India Pune Operational 9 MW IT — Operator / official
Noida DC1CtrlS Noida Operational 8 MW IT — Operator / official
Hyderabad DC2CtrlS Hyderabad Operational 7.4 MW total — Operator / official
STT Chennai 7STT GDC India
History
  1. Operational
  2. Operational
Chennai Operational 7.2 MW IT 2026 Operator / official
Anant Raj Panchkula Data CentreAnant Raj Panchkula Operational 7 MW IT — Trade press
RackBank Indore Data CenterRackBank Indore Operational 7 MW total — Operator / official
Hyderabad DC1CtrlS Hyderabad Operational 6 MW total — Operator / official

Get the data

Every data center in India, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

Data Centers in India: Capacity Sheet

199 facilities

Every tracked data center in India with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in India

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

India

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in India?

DC Market Insights tracks 199 data centers in India as of November 2026: 126 operational, 21 under construction and 52 planned, run by 31 operators. The count grows as we verify more sites.

What is the data center capacity of India?

Tracked operational capacity in India is 2,276 MW, with 1,714 MW under construction and 6,126 MW planned. These totals use the capacity each source states (IT load where given) and cover 133 of 199 tracked facilities.

Which companies operate the most data center capacity in India?

By tracked operational capacity, the largest operators in India are AdaniConneX (1,033 MW), CtrlS (276 MW) and STT GDC India (217 MW).

Where are the data centers in India located?

The largest clusters by tracked capacity are Hyderabad (17 facilities), Navi Mumbai (21 facilities) and Visakhapatnam (3 facilities). The map above shows every site.

Which new data centers are being built in India?

We track 1,714 MW under construction and 6,126 MW planned. The largest projects are AdaniConneX Navi Mumbai (1,000 MW), AdaniConneX Visakhapatnam (1,000 MW) and HyperVault Hyderabad AI Data Center Campus (1,000 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does India have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See India capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy