Proprietary data

Amazon Web Services Data Centers

Data centers operated by Amazon Web Services that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 November 2026, DC Market Insights tracks 58 data centers operated by Amazon Web Services in 8 countries, of which 10 are operational.

58Facilities tracked
8Countries
—Operational (10 sites)
248 MWUnder construction (3 sites)
721 MWPlanned (45 sites)

MW = IT capacity where the source states it, otherwise total capacity. 7 of 58 facilities have a stated capacity; the others are counted as sites only.

AWS Thane (Balkum Pada) Land Parcel · Amazon Web Services · Thane (approximate location)AWS Taloja Navi Mumbai Data Centre · Amazon Web Services · Navi Mumbai (approximate location)AWS Iver (Ridgeway) · Amazon Web Services · Iver (approximate location)AWS Swindon (Burderop) · Amazon Web Services · Swindon (approximate location)AWS European Sovereign Cloud – Baruth/Mark · Amazon Web Services · Baruth/Mark (approximate location)Warrenton data center (Blackwell Road) · Amazon Web Services · Warrenton (approximate location)Salem Township campus (former Cumulus Data campus, Susquehanna) · Amazon Web Services · Salem Township (approximate location) · Owned: AWS bought the campus assets from Talen (Cumulus Data)Falls Township AI innovation campus (Keystone Trade Center) · Amazon Web Services · Falls Township (approximate location) · Owned: (self-build): Amazon is constructing the data centerDevlin Technology Park · Amazon Web Services · Bristow (approximate location)Bristow Campus · Amazon Web Services · Bristow (approximate location)AWS Dean Drive data center complex · Amazon Web Services · Manassas (approximate location)AWS Huechuraba data center · Amazon Web Services · Huechuraba (approximate location)AWS Padre Hurtado data center · Amazon Web Services · Padre Hurtado (approximate location)AWS BWI-150 Frederick · Amazon Web Services · Frederick (approximate location)AWS BWI-151 Frederick · Amazon Web Services · Frederick (approximate location)AWS BWI-152 Frederick · Amazon Web Services · Frederick (approximate location)AWS BWI-153 Frederick · Amazon Web Services · Frederick (approximate location)Amazon Web Services Project Eagle Boling · Amazon Web Services · Boling (approximate location)Amazon Web Services Horizon Junction Floydada · Amazon Web Services · Floydada (approximate location)AWS Mesa Pecos Road campus · Amazon Web Services · Mesa (approximate location)AWS Mesa Elliot Road campus · Amazon Web Services · Mesa (approximate location)Amazon Web Services Boardman · Amazon Web Services · Boardman (approximate location)Amazon Web Services Hermiston · Amazon Web Services · Hermiston (approximate location)Amazon Web Services Boardman Bombing Range Road · Amazon Web Services · Boardman (approximate location)AWS Vicksburg data center campus · Amazon Web Services · Vicksburg (approximate location)AWS Resilient Technology Park campus · Amazon Web Services · Shreveport (approximate location) · Cooling: Evaporative or adiabatic · Leased in colocation: STACK Infrastructure is developer and owner of all three campuses; Amazon is the userAWS New Albany – 2570 Beech Road · Amazon Web Services · New Albany (approximate location)AWS Hilliard – Hayden Run campus · Amazon Web Services · Hilliard (approximate location)AWS New Albany Beech and Miller Roads campus · Amazon Web Services · New Albany (approximate location)AWS Hilliard new campus · Amazon Web Services · Hilliard (approximate location)AWS New Carlisle campus (Project Rainier) · Amazon Web Services · New Carlisle (approximate location) · Owned: (self-build): AWS data center campusAWS Hobart · Amazon Web Services · Hobart (approximate location)AWS Mexico (Central) Region · Amazon Web Services · Querétaro (approximate location)AWS Cruiserath Building A (Mulhuddart) · Amazon Web Services · Dublin (approximate location)AWS Cruiserath Building B (Mulhuddart) · Amazon Web Services · Dublin (approximate location)AWS Cruiserath Building C (Mulhuddart) · Amazon Web Services · Dublin (approximate location)AWS Cruiserath Buildings E, F and G (Mulhuddart) · Amazon Web Services · Dublin (approximate location)AWS Drogheda data storage facility 1 (IDA Business & Technology Park) · Amazon Web Services · Drogheda (approximate location)AWS Drogheda data storage facility 2 (IDA Business & Technology Park) · Amazon Web Services · Drogheda (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Amazon Web Services data centers: key facts

About Amazon Web Services

Amazon Web Services (AWS) is the cloud services business of Amazon.com, Inc. It builds its data centers into Regions made up of Availability Zones. As stated on its website in October 2026, the AWS Cloud spans 124 Availability Zones within 39 geographic Regions, with announced plans for 7 more Availability Zones and 2 more AWS Regions in the Kingdom of Saudi Arabia and Chile. It also runs more than 750 CloudFront points of presence and 15 Regional edge caches.

Headquarters
Seattle, United States
Founded
2006
Ownership
Wholly owned subsidiary of Amazon.com, Inc.
Parent company
Amazon.com, Inc.
Tracked footprint
58 facilities in 8 countries
Website
aws.amazon.com

Data center business

  • Amazon plans to invest up to $50 billion to add nearly 1.3 gigawatts of AI and supercomputing capacity across its AWS Top Secret, AWS Secret and AWS GovCloud (US) Regions for US government agencies, with construction set to break ground in 2026.
  • Amazon plans to invest at least $20 billion in Pennsylvania to expand its data center infrastructure for AI and cloud computing. Salem Township (Luzerne County) and Falls Township (Bucks County) are the first two campus sites named.
  • AWS groups its data centers into geographic Regions, each made up of separate Availability Zones. Its global infrastructure page lists 39 Regions and 124 Availability Zones, plus Local Zones and 33 Wavelength Zones for low-latency workloads, more than 750 CloudFront points of presence and 15 Regional edge caches (October 2026).
  • AWS segment sales were $128.7 billion in 2025, up 20% year over year. Amazon said it expects to invest about $200 billion in capital expenditures across the company in 2026, with purchases of property and equipment of $131.8 billion in 2025.
  • Amazon says it has invested $22.9 billion across Oregon since 2010; its data center operations there are in Morrow and Umatilla counties, including Boardman and Hermiston.
  • In Georgia, Amazon plans to invest an estimated $11 billion in new data center infrastructure in Butts and Douglas counties, expected to create at least 550 jobs.

International expansion

  • Amazon plans to invest AU$20 billion from 2025 to 2029 to expand its data centers in Sydney and Melbourne, and is buying more than 170 MW from three new solar farms in Victoria and Queensland.
  • Amazon plans to invest more than $4 billion to launch an AWS infrastructure Region in Chile, with three Availability Zones at launch, by the end of 2026.
  • AWS says its first cloud infrastructure Region in the Kingdom of Saudi Arabia is on track to launch in December 2026, backed by more than $5.3 billion (SAR 19.88 billion) of planned investment.
  • The AWS Europe (Spain) Region in Aragon has operated since November 2022. Amazon plans new facilities in Huesca and Zaragoza and infrastructure in all three provinces of Aragon, including Teruel.

Recent updates

  • Amazon raised its planned investment in northwest Louisiana to $18 billion, adding a third campus in Shreveport to the two in Caddo and Bossier parishes. STACK Infrastructure develops and owns all three campuses for Amazon.
  • Q2 2026: AWS segment sales rose 37% year over year to $42.2 billion and operating income was $16.6 billion. Amazon's purchases of property and equipment were $54.2 billion in the quarter and $173.0 billion over twelve months, driven mainly by AI investment.
  • Amazon announced plans to invest €33.7 billion ($39.8 billion) in Spain, adding €18 billion to the €15.7 billion announced in 2024, to expand data center infrastructure across Aragon.
  • AWS launched the AWS European Sovereign Cloud with its first Region in Brandenburg, Germany, as part of more than €7.8 billion of planned investment in Germany, and announced new sovereign Local Zones in Belgium, the Netherlands and Portugal.
  • Amazon plans to invest an additional $15 billion in Northern Indiana for new data center campuses that will add 2.4 gigawatts of data center capacity, separate from the earlier $11 billion project in St. Joseph County.

Company details checked against company and official sources, 12 Oct 2026.

  • The largest project in the pipeline is AWS Taloja Navi Mumbai Data Centre by Amazon Web Services (473 MW, planned).
  • India accounts for 49% of tracked capacity (2 facilities).
  • 7 of 58 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Under construction248 MW
Planned721 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
India473 MW
Germany300 MW
Ireland169 MW

OperationalUnder construction or planned

Amazon Web Services development pipeline

Under construction and planned facilities with a stated capacity, largest first. 248 MW under construction and 721 MW planned in total.

ProjectLocationStatusTypeCapacity
AWS Taloja Navi Mumbai Data CentreAmazon Web Services Navi Mumbai, India Planned Hyperscale 473 MW
AWS European Sovereign Cloud – MassenAmazon Web Services Massen-Niederlausitz, Germany Under construction Hyperscale 200 MW
AWS European Sovereign Cloud – Baruth/MarkAmazon Web Services Baruth/Mark, Germany Planned Hyperscale 100 MW
AWS Cruiserath Buildings E, F and G (Mulhuddart)Amazon Web Services Dublin, Ireland Planned Hyperscale 73.1 MW
AWS Drogheda data storage facility 1 (IDA Business & Technology Park)Amazon Web Services Drogheda, Ireland Under construction Hyperscale 48 MW
AWS Drogheda data storage facility 2 (IDA Business & Technology Park)Amazon Web Services Drogheda, Ireland Planned Hyperscale 48 MW
AWS Swindon (Burderop)Amazon Web Services Swindon, United Kingdom Planned Hyperscale 27 MW

Facilities

58 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Falls Township AI innovation campus (Keystone Trade Center)Hyperscale Owned: (self-build): Amazon is constructing the data center Falls Township, United States Planned — — Operator / official
Lake Anna Tech CampusHyperscale United States Planned — — Trade press
Northeast Creek Technology CampusHyperscale United States Planned — — Trade press
Orrock Tech CampusHyperscale United States Planned — — Trade press
Salem Township campus (former Cumulus Data campus, Susquehanna)Hyperscale Owned: AWS bought the campus assets from Talen (Cumulus Data) Salem Township, United States Planned — — Operator / official
Stevensburg data center campusHyperscale Stevensburg, United States Planned — — Trade press
Summit Crossing Tech CampusHyperscale United States Planned — — Trade press
Warrenton data center (Blackwell Road)Hyperscale Warrenton, United States Planned — — Trade press

Market position

How Amazon Web Services compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Amazon Web Services is one of 171 operators we track.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In Ireland, Amazon Web Services ranks #5 of 15 tracked operators by capacity, with 13% of the country’s tracked MW.
  • In United Kingdom, Amazon Web Services ranks #33 of 54 tracked operators by capacity, with 0.3% of the country’s tracked MW.
  • Frederick also hosts 2 other tracked data center(s), run by Aligned Data Centers.
  • Our Deal Tracker lists 2 deal(s) naming Amazon Web Services, the latest on 16 November 2026.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Amazon Web Services rank by capacity#72of 171 operators
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Data center operators in Ireland

Tracked facilities3915 operators
Operational capacity53 MW1,278 MW in the pipeline
Amazon Web Services rank by capacity#5of 15 operators · 13%
Industrial power price234 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Red Admiral DC1—250 MW
Echelon Data Centres2—200 MW
Art Data Centres1—200 MW
Herbata1—180 MW
Huntstown Power Company1—150 MW
EdgeConneX425 MW37 MW
Pure DC314 MW40 MW
Vantage Data Centers1—52 MW

All data centers in Ireland Power and policy in Ireland

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
Amazon Web Services rank by capacity#33of 54 operators · 0.3%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Other data centers in Frederick

Deals naming Amazon Web Services

  • Blackstone Digital Infrastructure Trust Inc. (BXDC) → 75% majority interest in two joint ventures owning 13 newly constructed powered shells across two AWS data center campuses M&A $5.00B
  • Amazon Web Services → Lewis and Clark Ranch, nearly 1,000 acres, West Richland, Washington Land / campus $264.0M

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Amazon Web Services operate?

DC Market Insights tracks 58 Amazon Web Services data center(s) in 8 countries as of November 2026: 10 operational, 3 under construction and 45 planned.

Where is Amazon Web Services headquartered?

Amazon Web Services is headquartered in Seattle, United States. Ownership: Wholly owned subsidiary of Amazon.com, Inc.

Which other companies operate data centers in United States?

Besides Amazon Web Services, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Frederick?

Other tracked data centers in Frederick include Aligned IAD-04 (Quantum Frederick Building 1) (Aligned Data Centers) and Aligned IAD-06 (Quantum Frederick) (Aligned Data Centers).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst