Proprietary data
Cogent Data Centers
Data centers operated by Cogent that we have verified: location, status and capacity, each checked against its source.
In short
As of 2 November 2026, DC Market Insights tracks 87 data centers operated by Cogent in 6 countries, of which 87 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 0 of 87 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Cogent data centers: key facts
About Cogent Communications
Cogent Communications is a Washington, D.C.-based Tier 1 internet service provider that also sells colocation space and power. It states that it owns and operates 88 data centers in North America and Europe (69 in North America, 19 in Europe) plus 84 smaller Edge Data Centers in North America. Its Q2 2026 results show 88 Cogent data centers and 84 edge data centers at 30 June 2026, after it sold ten owned data centers for net proceeds of $224.2 million.
- Headquarters
- Washington, D.C., United States
- Founded
- 1999
- Ownership
- Listed on Nasdaq (CCOI)
- Tracked footprint
- 87 facilities in 6 countries
- Website
- cogentco.com
Data center business
- Cogent says it owns and operates 88 data centers in North America and Europe and also has 84 Edge Data Centers in North America. Services in its data centers include rack space, power, environmental controls and connectivity (Dedicated Internet Access, IP Transit and Ethernet point-to-point / VPLS); some sites also host its Utility Computing servers.
- By region, Cogent lists 69 data centers in North America, including sites in Toronto and Mississauga, Ontario, and 19 in Europe: 16 in France (Paris La Garenne-Colombes, Paris Vélizy and 14 regional cities), Frankfurt in Germany, Halfweg near Amsterdam in the Netherlands and Madrid (San Sebastián de los Reyes) in Spain. Its location pages give street addresses and space per site, from about 1,200 sq ft in Billings to 110,078 sq ft in Fort Worth, with 42U or 48U cabinets; no site power capacity is published.
- Most of the data center estate came with the Sprint wireline business: Cogent acquired 482 technical buildings with it, converted 52 of them to Cogent Data Centers and 87 into Cogent Edge Data Centers. The acquisition of Sprint's U.S. long-haul fiber network (now Cogent Fiber LLC) closed on 1 May 2023.
- Cogent's quarterly operating metrics count 101 Cogent data centers at 31 March and 30 June 2025, 100 at 31 December 2025, 99 at 31 March 2026 and 88 at 30 June 2026; edge data centers moved between 79 and 87 over the same period (84 at 30 June 2026). Owned technical buildings fell from 482 to 472 and their space from 1,603,569 to 1,071,509 sq ft in Q2 2026.
- Its 10-Q for the quarter ended 30 June 2026 describes 88 of its own AC-powered Cogent data centers and 84 smaller DC-powered Cogent edge data centers, alongside 1,781 carrier-neutral data center nodes in 1,588 buildings. Its IP network is connected to 3,627 buildings in 308 metropolitan markets.
- Cogent describes itself as a global Tier 1 ISP with over 94,700 route miles of intercity fiber and more than 34,400 metro fiber miles, offering colocation in any of its 88 internet data centers. It was established in 1999 by Dave Schaeffer, its founder and CEO.
Recent updates
- Q2 2026 results: Cogent sold ten of its owned data centers for net proceeds of $224.2 million with a gain of $130.7 million; service revenue was $235.6 million in Q2 2026, against $239.2 million in Q1 2026.
- The 10-Q states the sale of ten owned data center buildings and associated land completed on 29 June 2026 for net proceeds of $224.2 million paid in cash at closing; the ten sites had been acquired on 1 May 2023 and had a net book value of $93.4 million.
- Cogent signed a definitive agreement to sell 10 data center facilities to a newly formed entity sponsored by I Squared Capital for $225 million in cash. The sites are in Phoenix, Anaheim, Burbank, Stockton, Atlanta, Chicago, Elkridge (Maryland), Kansas City, Nashville and Houston.
- Q1 2026 results: Cogent reported 99 Cogent data centers at 31 March 2026, down from 100 at 31 December 2025.
Company details checked against company and official sources, 2 Nov 2026.
- United States accounts for 0% of tracked capacity (65 facilities).
- 0 of 87 facilities have a capacity stated by their source; the totals above count only those.
Facilities
87 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| North Freeway Office & Data CenterColocation | Houston, United States | Operational | — | — | Operator / official |
| Oklahoma City Data CenterColocation | Oklahoma City, United States | Operational | — | — | Operator / official |
| Omaha Data CenterColocation | Omaha, United States | Operational | — | — | Operator / official |
| Orlando Data CenterColocation | Orlando, United States | Operational | — | — | Operator / official |
| Oroville Data CenterColocation | Oroville, United States | Operational | — | — | Operator / official |
| Palm Springs Data CenterColocation | Palm Springs, United States | Operational | — | — | Operator / official |
| Paris – Vélizy Data CenterColocation | Vélizy-Villacoublay, France | Operational | — | — | Operator / official |
| Paris Office & Data CenterColocation | La Garenne Colombes, France | Operational | — | — | Operator / official |
| Pasadena Office & Data CenterColocation | Pasadena, United States | Operational | — | — | Operator / official |
| Pennsauken Data CenterColocation | Pennsauken, United States | Operational | — | — | Operator / official |
| Phoenix Office & Data CenterColocation | Phoenix, United States | Operational | — | — | Operator / official |
| Pittsburgh Data CenterColocation | Pittsburgh, United States | Operational | — | — | Operator / official |
| Poitiers Data CenterColocation | Poitiers, France | Operational | — | — | Operator / official |
| Portland Data CenterColocation | Portland, United States | Operational | — | — | Operator / official |
| Raleigh Data CenterColocation | Raleigh, United States | Operational | — | — | Operator / official |
| Rennes Data CenterColocation | Rennes, France | Operational | — | — | Operator / official |
| Rialto Data CenterColocation | Rialto, United States | Operational | — | — | Operator / official |
| Richmond Data CenterColocation | Richmond, United States | Operational | — | — | Operator / official |
| Rouen Data CenterColocation | Rouen, France | Operational | — | — | Operator / official |
| San Diego Office & Data CenterColocation | San Diego, United States | Operational | — | — | Operator / official |
| San Jose Office and Data CenterColocation | San Jose, United States | Operational | — | — | Operator / official |
| Sparta Data CenterColocation | Sparta, United States | Operational | — | — | Operator / official |
| Spokane Data CenterColocation | Spokane, United States | Operational | — | — | Operator / official |
| Springfield Data CenterColocation | Springfield, United States | Operational | — | — | Operator / official |
| St Louis Data CenterColocation | St. Louis, United States | Operational | — | — | Operator / official |
| St. Paul Data CenterColocation | St Paul, United States | Operational | — | — | Operator / official |
| Strasbourg Data CenterColocation | Strasbourg, France | Operational | — | — | Operator / official |
| Syracuse Data CenterColocation | Syracuse, United States | Operational | — | — | Operator / official |
| Tacoma Office and Data CenterColocation | Tacoma, United States | Operational | — | — | Operator / official |
| Tampa Data CenterColocation | Tampa, United States | Operational | — | — | Operator / official |
| Toronto Office & Data CenterColocation | Toronto, Canada | Operational | — | — | Operator / official |
| Toulouse Data CenterColocation | Toulouse, France | Operational | — | — | Operator / official |
| Tours Data CenterColocation | Tours, France | Operational | — | — | Operator / official |
| Troy Office & Data CenterColocation | Troy, United States | Operational | — | — | Operator / official |
| Vienna Office & Data CenterColocation | Vienna, United States | Operational | — | — | Operator / official |
| Washington DC 2 Data CenterColocation | Washington, United States | Operational | — | — | Operator / official |
| Worcester Data CenterColocation | Worcester, United States | Operational | — | — | Operator / official |
Market position
How Cogent compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Cogent is one of 171 operators we track.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In France, Cogent is one of 10 operators we track.
- In Canada, Cogent is one of 18 operators we track.
- Austin also hosts 9 other tracked data center(s), run by CyrusOne, Element Critical, DataBank and Digital Realty.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in France
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Data4 | 4 | 255 MW | 950 MW |
| Digital Realty | 14 | — | 176 MW |
| Colt DCS | 5 | 24 MW | 137 MW |
| CloudHQ | 1 | — | 150 MW |
| Scaleway | 1 | 20 MW | — |
| Telehouse | 3 | 18 MW | — |
| CyrusOne | 1 | 4.5 MW | — |
| Equinix | 9 | — | — |
All data centers in France Power and policy in France
Data center operators in Canada
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| O'Leary Ventures | 1 | — | 7,500 MW |
| Meta | 1 | — | 1,000 MW |
| Beacon AI Centers | 1 | — | 920 MW |
| Bell Canada | 2 | — | 300 MW |
| eStruxture | 16 | 148 MW | 90 MW |
| Vantage Data Centers | 4 | 127 MW | — |
| Cologix | 23 | 86.4 MW | — |
| QScale | 2 | — | 60 MW |
All data centers in Canada Power and policy in Canada
Other data centers in Austin
- CyrusOne AUS2-AUS3 Austin · CyrusOne · Operational · 19 MW
- Element Critical Austin One · Element Critical · Operational · 9.5 MW
- DataBank AUS1 Austin · DataBank · Operational · 0.4 MW
- Digital Realty AUS11 Austin · Digital Realty · Operational
- Skybox Austin I · Skybox Datacenters · Operational
- Skybox PowerCampus Austin · Skybox Datacenters · Planned
- Switch Data Foundry Austin 1 · Switch · Operational
- Switch Data Foundry Texas 1 (Data Foundry 01) · Switch · Operational
- Switch Data Foundry Texas 2 (Data Foundry 02) · Switch · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Cogent operate?
DC Market Insights tracks 87 Cogent data center(s) in 6 countries as of November 2026: 87 operational, 0 under construction and 0 planned.
Where is Cogent headquartered?
Cogent Communications is headquartered in Washington, D.C., United States. Ownership: Listed on Nasdaq (CCOI).
Which other companies operate data centers in United States?
Besides Cogent, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Austin?
Other tracked data centers in Austin include CyrusOne AUS2-AUS3 Austin (CyrusOne), Element Critical Austin One (Element Critical), DataBank AUS1 Austin (DataBank) and Digital Realty AUS11 Austin (Digital Realty).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
