Data Center Power & Policy in Türkiye

Every government action on data centers and power in Türkiye that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 25 November 2026, DC Market Insights tracks 12 government actions on data centers and power in Türkiye, 10 of them in force. Türkiye has 1 restriction on new data centers in force: Presidential Circular 2019/12 on Information and Communication Security Measures (data localization). 1 incentive scheme applies: HIT-30 High Technology Investment Programme – HIT-Data Center Call.

12Actions tracked
10In force
70.3 USD/MWhIndustrial power price
—Renewable share of generation

Market snapshot

Türkiye power and policy: key facts

  • Industrial electricity price: 70.3 USD/MWh (2026). Rank 25 of 31 tracked countries, highest first.
  • Grid emission factor: 0.44 kgCO2/kWh (2022). Rank 12 of 37 tracked countries, highest first.
  • Latest change: Last-resort supply tariff (SKTT) threshold for non-residential consumers kept at 15,000 kWh (EPDK, 30 Oct 2026).
  • By type: 4 power tariff, 2 regulation, 1 grid access and 1 plan or strategy.

Power indicators for Türkiye

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 70.3 USD/MWh 2026 · Original 312.4942 kr/kWh (3,124.942 TRY/MWh), EPDK regulated single-time energy charge for transmission-system users, taxes excluded, valid from 4 Apr 2026; converted at TCMB USD buying rate 44.4306 TRY/USD (bulletin 2026/64, 03.04.2026). Energy charge on Resmî Gazete 4 April 2026 – EPDK Decision 14461; TCMB rates
Grid emission factor 0.44 kgCO2/kWh 2022 · tCO2/MWh = kgCO2/kWh; transmission-connected consumption point (distribution 0.474, generation 0.438); published 06.12.2024 ETKB – 2022 Üretim/Tüketim Emisyon Faktörleri

In force now in Türkiye

Restriction (1)

  • RestrictionIn force

    Presidential Circular 2019/12 on Information and Communication Security Measures (data localization)

    Critical data (population, health and communication records, genetic and biometric data) must be stored securely inside Türkiye. Public-institution data may not be kept in cloud storage services, except the institutions' own systems or domestic providers under institutional control. In practice public-sector and critical workloads must be hosted in Türkiye.

    Presidency of the Republic of Türkiye · Effective 6 Jul 2019 · Resmî Gazete No. 30823 (6 July 2019) – Genelge 2019/12

Grid access (1)

  • Grid accessIn force

    EPDK amendment to Electricity Storage Activities Regulation – behind-the-meter storage for consumers

    Consumers may install electricity storage at the same metering point if the network operator gives a favourable connection opinion; storage above the contracted capacity (anlaşma gücü) requires the units and systems of Article 14 of the Connection and System Use Regulation. Relevant to data center battery strategies. No data-center-specific connection or capacity-allocation rule was found.

    EPDK · Effective 19 Oct 2026 · Resmî Gazete No. 33405 (19 Oct 2026)

Power tariff (4)

  • Power tariffIn force

    Last-resort supply tariff (SKTT) threshold for non-residential consumers kept at 15,000 kWh

    EPDK lowered the residential last-resort supply tariff threshold to 3,000 kWh/year for 2027 and left the 15,000 kWh threshold for industry, public and private services and lighting unchanged. Non-residential consumers above it who have not chosen a supplier pay the market-based last-resort tariff, not the regulated rate, so large loads such as data centers in practice buy under bilateral contracts.

    15,000 kWh/year Non-residential SKTT threshold (unchanged)

    EPDK

  • Power tariffIn force

    EPDK revised 2026 YEKDEM (renewable support mechanism) unit cost forecast (Decision 14460)

    EPDK revised the forecast YEKDEM cost added per MWh supplied for April–December 2026; the cost passes through to all consumers' energy prices. Monthly values range from 574.54 TL/MWh (April) and 602.51 TL/MWh (May) down to 189.15 TL/MWh (July) and 224.02 TL/MWh (December).

    EPDK · Effective 1 Apr 2026 · Ends 31 Dec 2026 · Resmî Gazete 4 April 2026 – EPDK Kurul Kararı No. 14460

  • Power tariffIn force

    EPDK retail tariff table effective 4 April 2026 (Board Decision 14461)

    EPDK approved the regulated retail tariff table, taxes excluded, valid from 4 April 2026 (decision of 2 April 2026). Transmission-system users: single-time active energy charge 312.4942 kr/kWh. Medium-voltage (OG) industrial: energy 290.9687 kr/kWh (day 295.6124, peak 495.3736, night 134.3850), OG single-term distribution fee 118.2457 kr/kWh, OG two-term distribution 107.0498 kr/kWh plus power charge 3,557.5915 kr/kW/month. Green-tariff energy charge 345.4688 kr/kWh.

    312.49 kr/kWh Transmission-system users, single-time energy charge, taxes excluded

    Energy Market Regulatory Authority (EPDK) · Effective 4 Apr 2026 · Resmî Gazete 4 April 2026 – EPDK Kurul Kararı No. 14461

  • Power tariffIn force

    Eligible consumer (serbest tüketici) limit for 2026: 500 kWh

    EPDK's Board set the 2026 eligible-consumer threshold at 500 kWh (Board meeting of 18 December 2025, Resmî Gazete No. 33116 of 23 December 2025). Consumers above the limit may buy electricity from any supplier on bilateral terms; any data center is far above it.

    500 kWh Applies for 2026; period wording per press report

    EPDK · Effective 1 Jan 2026

Incentive (1)

  • IncentiveIn force

    HIT-30 High Technology Investment Programme – HIT-Data Center Call

    The Ministry of Industry and Technology runs a data-center call under the HIT-30 programme. Facilities need at least 30 MW of IT capacity, at least 50% compatibility with AI hardware and a maximum PUE of 1.4. Total support budget USD 1.5 billion. Support includes up to 50% tax reduction, energy support of up to 10% of the investment, employment support, VAT and customs-duty exemption, social security employer-share support, interest support and investment site allocation, with extra rates for energy-efficient and green-IT projects. No application deadline found; thresholds from the PwC bulletin (official call page hit30.sanayi.gov.tr/cagrilar does not show them).

    30 MW IT capacity (minimum) Max PUE 1.4; ≥50% AI-hardware compatible; budget USD 1.5 bn

    Ministry of Industry and Technology

Regulation (2)

  • RegulationIn force

    Climate Law No. 7552 – Emissions Trading System (ETS) with pilot phase

    Türkiye's first Climate Law (Resmî Gazete 32951, 9 July 2025, in force on publication) sets up a cap-based national ETS. A pilot phase, set by the Carbon Market Board with administrative fines cut by 80%, comes first. Covered installations must obtain a greenhouse gas emission permit within 3 years. Data centers are not named; exposure comes through power-sector carbon costs.

    Grand National Assembly / Ministry of Environment, Urbanisation and Climate Change · Effective 9 Jul 2025 · Resmî Gazete No. 32951 – İklim Kanunu No. 7552

  • RegulationIn force

    Law No. 7499 amending KVKK Law 6698, Article 9 (cross-border transfer of personal data)

    Law 7499 (Resmî Gazete 32487, 12 March 2024) rewrote Article 9 of Personal Data Protection Law 6698. Personal data may go abroad with an adequacy decision of the KVKK Board for the country, sector or organisation; without adequacy, transfers need appropriate safeguards such as standard contracts notified to the Authority within five business days, binding corporate rules or an approved undertaking; otherwise only incidental exceptions apply. In force from 1 June 2024. No general data localization.

    Grand National Assembly / KVKK · Effective 1 Jun 2024 · Resmî Gazete No. 32487 – Kanun No. 7499

Other (1)

  • OtherIn force

    Official national electricity grid emission factors, 2022 calculation

    The Ministry of Energy publishes national electricity emission factors for Scope 2 and project accounting. For 2022: national generation 0.438 tCO2/MWh; consumption point connected to the transmission grid 0.442; distribution-connected 0.474. Calculation published 6 Dec 2024.

    0.44 tCO2/MWh Transmission-connected consumption point

    Ministry of Energy and Natural Resources · ETKB – 2022 Üretim/Tüketim Emisyon Faktörleri

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Plan or strategyAnnounced

    Government target: at least 1 GW installed data center capacity by 2030

    At a data-center groundbreaking in Temelli, Ankara, Minister of Industry and Technology Mehmet Fatih Kacır said Türkiye will raise its installed data center capacity to at least 1 GW by 2030, and described the HIT-Data Center Call as offering broad support for high-quality data centers of at least 30 MW.

    1 GW Installed data center capacity target by 2030 (ministerial statement)

    Ministry of Industry and Technology · Ends 31 Dec 2030

  • Renewable energyAnnounced

    2035 target: 120,000 MW installed wind and solar capacity; annual YEKA tenders

    Energy Minister Alparslan Bayraktar announced a 2035 roadmap targeting 120,000 MW of installed wind and solar capacity, needing close to USD 80 billion of investment. YEKA renewable-area tenders are planned to repeat every year.

    120,000 MW Wind + solar installed capacity target for 2035

    Ministry of Energy and Natural Resources · Ends 31 Dec 2035

Timeline of data center and power policy in Türkiye

DateActionTypeStatusAuthority
30 Oct 2026Last-resort supply tariff (SKTT) threshold for non-residential consumers kept at 15,000 kWhPower tariffIn forceEPDK
19 Oct 2026EPDK amendment to Electricity Storage Activities Regulation – behind-the-meter storage for consumersGrid accessIn forceEPDK
19 Oct 2026Government target: at least 1 GW installed data center capacity by 2030Plan or strategyAnnouncedMinistry of Industry and Technology
4 Apr 2026EPDK revised 2026 YEKDEM (renewable support mechanism) unit cost forecast (Decision 14460)Power tariffIn forceEPDK
4 Apr 2026EPDK retail tariff table effective 4 April 2026 (Board Decision 14461)Power tariffIn forceEnergy Market Regulatory Authority (EPDK)
23 Dec 2025Eligible consumer (serbest tüketici) limit for 2026: 500 kWhPower tariffIn forceEPDK
17 Oct 2025HIT-30 High Technology Investment Programme – HIT-Data Center CallIncentiveIn forceMinistry of Industry and Technology
9 Jul 2025Climate Law No. 7552 – Emissions Trading System (ETS) with pilot phaseRegulationIn forceGrand National Assembly / Ministry of Environment, Urbanisation and Climate Change
6 Dec 2024Official national electricity grid emission factors, 2022 calculationOtherIn forceMinistry of Energy and Natural Resources
21 Oct 20242035 target: 120,000 MW installed wind and solar capacity; annual YEKA tendersRenewable energyAnnouncedMinistry of Energy and Natural Resources
12 Mar 2024Law No. 7499 amending KVKK Law 6698, Article 9 (cross-border transfer of personal data)RegulationIn forceGrand National Assembly / KVKK
6 Jul 2019Presidential Circular 2019/12 on Information and Communication Security Measures (data localization)RestrictionIn forcePresidency of the Republic of Türkiye

How Türkiye compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Türkiye?

Yes. 1 restriction on new data centers is in force in Türkiye: Presidential Circular 2019/12 on Information and Communication Security Measures (data localization).

What incentives does Türkiye offer data centers?

In force: HIT-30 High Technology Investment Programme – HIT-Data Center Call. Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Türkiye?

The industrial electricity price in Türkiye was 70.3 USD/MWh in 2026 (Original 312.4942 kr/kWh (3,124.942 TRY/MWh), EPDK regulated single-time energy charge for transmission-system users, taxes excluded, valid from 4 Apr 2026; converted at TCMB USD buying rate 44.4306 TRY/USD (bulletin 2026/64, 03.04.2026). Energy charge on). Data center contracts can differ by voltage level, contract length and location.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.