Proprietary data

CyrusOne Data Centers

Data centers operated by CyrusOne that we have verified: location, status and capacity, each checked against its source.

In short

As of 21 November 2026, DC Market Insights tracks 58 data centers operated by CyrusOne in 9 countries, of which 40 are operational. Stated operational capacity is 1,267 MW, with a further 362 MW under construction and 294 MW planned. The pipeline is 0.5 times the capacity already operating.

58Facilities tracked
9Countries
1,267 MWOperational (40 sites)
362 MWUnder construction (7 sites)
294 MWPlanned (11 sites)

MW = IT capacity where the source states it, otherwise total capacity. 48 of 58 facilities have a stated capacity; the others are counted as sites only.

CyrusOne LON1 · CyrusOne · Slough (approximate location)CyrusOne LON2 · CyrusOne · London (approximate location)CyrusOne LON3 · CyrusOne · Slough (approximate location)CyrusOne LON4 · CyrusOne · Slough (approximate location)CyrusOne LON5 · CyrusOne · Slough (approximate location)CyrusOne Southall · CyrusOne · Southall (approximate location)FRA1 · CyrusOne · Frankfurt am Main (approximate location)FRA2 · CyrusOne · Frankfurt am Main (approximate location)FRA3 · CyrusOne · Frankfurt am Main (approximate location)FRA4 · CyrusOne · Frankfurt am Main (approximate location)FRA6 · CyrusOne · Frankfurt am Main (approximate location)CyrusOne Sterling NVA1-NVA3 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA4 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA5-NVA7 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA8 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA9 · CyrusOne · Sterling (approximate location)CyrusOne Somerset NYM1 · CyrusOne · Somerset (approximate location)CyrusOne Totowa NYM2 · CyrusOne · Totowa (approximate location)CyrusOne Wappingers Falls NYM7 · CyrusOne · Wappingers Falls (approximate location)CyrusOne DFW1 Carrollton · CyrusOne · Carrollton (approximate location)CyrusOne DFW2 Lewisville · CyrusOne · Lewisville (approximate location)CyrusOne DFW3-DFW4 Allen · CyrusOne · Allen (approximate location)CyrusOne DFW5 Allen · CyrusOne · Allen (approximate location)CyrusOne AUS2-AUS3 Austin · CyrusOne · Austin (approximate location)CyrusOne HOU3-HOU4 Houston · CyrusOne · Houston (approximate location)CyrusOne SAT1 San Antonio · CyrusOne · San Antonio (approximate location)CyrusOne SAT2-SAT4 San Antonio · CyrusOne · San Antonio (approximate location)CyrusOne SAT5-SAT6 San Antonio · CyrusOne · San Antonio (approximate location)CyrusOne Bosque County · CyrusOne (approximate location)CyrusOne Medina County · CyrusOne · Castroville (approximate location)CyrusOne Sulphur Springs · CyrusOne · Sulphur Springs (approximate location)CyrusOne Chandler PHX1-PHX8 · CyrusOne · Chandler (approximate location)CyrusOne PNW1 Quincy · CyrusOne · Quincy (approximate location)CyrusOne Aurora Campus (CHI1-CHI3) · CyrusOne · Aurora (approximate location)CyrusOne CHI9 · CyrusOne · Aurora (approximate location)CyrusOne Yorkville Technology Campus · CyrusOne · Yorkville (approximate location)CyrusOne CIN2 · CyrusOne · Cincinnati (approximate location) · Cooling: Chilled water, cooling towersCyrusOne CIN5 & CIN7 (Lebanon Campus) · CyrusOne · Lebanon (approximate location)CyrusOne CIN6 · CyrusOne · Florence (approximate location)NYM5 · CyrusOne · Norwalk (approximate location)CyrusOne OCB1 Council Bluffs · CyrusOne · Council Bluffs (approximate location) · Cooling: Chilled water, dry coolersCyrusOne DUR1-DUR2 Durham · CyrusOne · Durham (approximate location)CyrusOne Lee County Data Center · CyrusOne · Sanford (approximate location)CyrusOne DFW6 Richardson · CyrusOne · Richardson (approximate location)CyrusOne DFW7 Fort Worth · CyrusOne · Fort Worth (approximate location)CyrusOne PAR1 Paris · CyrusOne · Wissous (approximate location)CyrusOne DUB1 Dublin · CyrusOne · Dublin (approximate location)CyrusOne MIL1 Milan · CyrusOne · Segrate (approximate location)CyrusOne MIL2 Milan · CyrusOne · Milan (approximate location)CyrusOne MAD1 Madrid · CyrusOne · Alcobendas (approximate location)CyrusOne LON6 · CyrusOne · Iver Heath (exact location) · Cooling: Chilled water, dry coolersFRA5 · CyrusOne · Hanau am Main (exact location)FRA7 · CyrusOne · Frankfurt am Main (exact location)CyrusOne Sequoia Santa Clara · CyrusOne · Santa Clara (exact location) · Cooling: Chilled water, dry coolers
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

CyrusOne data centers: key facts

About CyrusOne

CyrusOne is a Dallas-based data center owner, developer and operator serving hyperscale and enterprise customers. In October 2026 its website states more than 60 operational data centers, more than 50 in development, 9 countries served, 16.2 million sq ft of data center space and more than 1 GW of power capacity, across North America, Europe and Japan.

Headquarters
Dallas, United States
Founded
2001
Ownership
Owned by funds managed by KKR and Global Infrastructure Partners (GIP)
Tracked footprint
58 facilities in 9 countries
Website
cyrusone.com

Data center business

  • CyrusOne secures power alongside land: in Texas it reports more than 1,100 MW under contract with Calpine (Constellation), including 400 MW at Thad Hill Energy Center in Bosque County and 380 MW at Freestone Energy Center, with exclusivity on a further 380 MW.
  • The CyrusOne site lists 54 campus and building entries: 34 in North America (Arizona, Illinois, Iowa, the New York metro, North Carolina, Ohio/Kentucky, Texas, Virginia and Washington), 19 in EMEA (London, Frankfurt, Amsterdam, Paris, Dublin, Madrid, Milan) and one in Japan (Osaka). Fourteen are marked In Development.
  • Texas is the largest US cluster: Allen, Austin, Carrollton, Houston, Lewisville, Richardson and three San Antonio campuses are operating, with new large campuses in development in Bosque, Freestone and Medina counties and Sulphur Springs. Medina County, near Castroville, is a multiphase campus with a stated $4 to $6 billion investment.
  • Northern Virginia (Sterling NVA1 to NVA9) and Phoenix (Chandler PHX1 to PHX8) are its largest operating campuses by stated IT capacity on the site pages; the Chicago area has Aurora CHI1 to CHI3 and CHI9 plus the Yorkville Technology Campus, whose first building is expected in late 2027.
  • In Europe CyrusOne runs London (LON1 to LON5, LON6 in development at Iver Heath), Frankfurt (FRA1 to FRA4 operating; FRA5, FRA6 and FRA7 in development, FRA7 at 81 MW IT initially), Amsterdam AMS1 (up to 54 MW IT), Dublin DUB1 (14 MW IT), Madrid MAD1 (18 MW IT) and Paris PAR1 in Wissous (4.5 MW live, 27 MW at full build).
  • In Japan, CyrusOne KEP OSK1 in the Keihanna area of Kansai is planned at 48 MW of IT capacity in six 8 MW halls, with the first phase due in Q1 2028.
  • Services cover build-to-suit, colocation, interconnection, and AI and high-density deployments for hyperscale and enterprise customers.

Recent updates

  • In a letter backing Texas digital infrastructure policy, CyrusOne said it has invested more than $5 billion across five active development sites, supporting more than 5,000 jobs, with more than 1,400 workers at one Texas site.
  • John Hatem was named Chief Executive Officer and board member with immediate effect, succeeding Eric Schwartz; KKR and Global Infrastructure Partners partners commented on the change.
  • Andreas Paduch was appointed Managing Director, Europe.
  • CyrusOne broke ground on MIL1 in Segrate, its first data center in Italy: 27 MW of IT capacity in three 9 MW halls and 7,000 sqm of technical space, with over €6 million for local infrastructure.
  • CyrusOne upsized and extended about $8.0 billion of loan facilities: a revolving credit facility of about $3.8 billion and a $4.2 billion US term loan, led by Goldman Sachs and Wells Fargo.
  • Constellation's Calpine signed a 380 MW agreement to support a CyrusOne data center next to the Freestone Energy Center in Freestone County, Texas.
  • CyrusOne and Eolian partnered on DFW7, a 200 MW campus under construction in Fort Worth since April 2025, next to the 100 MW Chisholm Grid battery site; capacity is offered from 2026.

Company details checked against company and official sources, 13 Oct 2026.

  • Capacity under construction or planned (656 MW) is 0.5 times the operational base of 1,267 MW.
  • Its largest operational site is CyrusOne Chandler PHX1-PHX8 in Chandler, United States at 169 MW.
  • The largest project in the pipeline is CyrusOne DFW7 Fort Worth (200 MW, under construction).
  • United States accounts for 65% of tracked capacity (37 facilities).
  • By type, the tracker lists 41 colocation and 17 hyperscale facilities.
  • 48 of 58 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational1,267 MW
Under construction362 MW
Planned294 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Germany279 MW
Italy81 MW
Japan48 MW
Spain18 MW
Ireland14 MW
France4.5 MW

OperationalUnder construction or planned

Facilities by type
Colocation41
Hyperscale17

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

CyrusOne development pipeline

Under construction and planned facilities with a stated capacity, largest first. 362 MW under construction and 294 MW planned in total.

ProjectLocationStatusTypeCapacity
CyrusOne DFW7 Fort WorthCyrusOne Fort Worth, United States Under construction Hyperscale 200 MW
CyrusOne LON6CyrusOne Iver Heath, United Kingdom Planned Hyperscale 108 MW
FRA6CyrusOne Frankfurt am Main, Germany Planned Colocation 84 MW
FRA7CyrusOne Frankfurt am Main, Germany Under construction Colocation 81 MW
FRA5CyrusOne Hanau am Main, Germany Under construction Colocation 54 MW
CyrusOne MIL2 MilanCyrusOne Milan, Italy Planned Colocation 54 MW
CyrusOne KEP OSK1CyrusOne Japan Planned Colocation 48 MW
CyrusOne MIL1 MilanCyrusOne Segrate, Italy Under construction Colocation 27 MW

Facilities

58 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CyrusOne DFW7 Fort WorthHyperscale
History · 1 deal
  1. Under construction
  2. Under construction
Fort Worth, United States Under construction 200 MW total — Operator / official
CyrusOne Chandler PHX1-PHX8Colocation Chandler, United States Operational 169 MW IT — Operator / official
CyrusOne Sterling NVA5-NVA7Hyperscale Sterling, United States Operational 116 MW IT — Operator / official
CyrusOne Aurora Campus (CHI1-CHI3)Colocation Aurora, United States Operational 114 MW IT — Operator / official
CyrusOne LON6Hyperscale Cooling: Chilled water, dry coolers Iver Heath, United Kingdom Planned 108 MW IT — Operator / official
CyrusOne HOU3-HOU4 HoustonColocation Houston, United States Operational 84 MW IT — Operator / official
FRA6Colocation Frankfurt am Main, Germany Planned 84 MW IT — Operator / official
FRA7Colocation
History
  1. Under construction
  2. Under construction
Frankfurt am Main, Germany Under construction 81 MW IT — Operator / official
CyrusOne DFW3-DFW4 AllenColocation Allen, United States Operational 77 MW IT — Operator / official
AMS1Colocation Netherlands Operational 54 MW IT — Operator / official
CyrusOne MIL2 MilanColocation Milan, Italy Planned 54 MW IT — Operator / official
FRA5Colocation Hanau am Main, Germany Under construction 54 MW IT — Operator / official
CyrusOne KEP OSK1Colocation Japan Planned 48 MW IT — Operator / official
CyrusOne DFW1 CarrolltonColocation Carrollton, United States Operational 45 MW IT — Operator / official
CyrusOne Sterling NVA1-NVA3Hyperscale Sterling, United States Operational 44 MW IT — Operator / official
CyrusOne DUR1-DUR2 DurhamColocation Durham, United States Operational 40 MW IT — Operator / official
CyrusOne Sterling NVA9Hyperscale Sterling, United States Operational 38 MW IT — Operator / official
CyrusOne PNW1 QuincyHyperscale Quincy, United States Operational 36 MW IT — Operator / official
CyrusOne SAT2-SAT4 San AntonioColocation San Antonio, United States Operational 36 MW IT — Operator / official
CyrusOne CIN5 & CIN7 (Lebanon Campus)Colocation Lebanon, United States Operational 35 MW IT — Operator / official
CyrusOne SAT5-SAT6 San AntonioColocation San Antonio, United States Operational 33 MW IT — Operator / official
CyrusOne MIL1 MilanColocation Segrate, Italy Under construction 27 MW IT — Operator / official
CyrusOne CHI9Hyperscale
History
  1. Under construction
  2. Operational
Aurora, United States Operational 24 MW IT — Operator / official
CyrusOne Sterling NVA8Hyperscale Sterling, United States Operational 24 MW IT — Operator / official
CyrusOne Somerset NYM1Colocation Somerset, United States Operational 23 MW IT — Operator / official
FRA3Colocation Frankfurt am Main, Germany Operational 22 MW IT — Operator / official
CyrusOne DFW6 RichardsonColocation Richardson, United States Operational 21 MW IT — Operator / official
CyrusOne AUS2-AUS3 AustinColocation Austin, United States Operational 19 MW IT — Operator / official
CyrusOne LON4Colocation Slough, United Kingdom Operational 18 MW IT — Operator / official
CyrusOne LON5Colocation Slough, United Kingdom Operational 18 MW IT — Operator / official
CyrusOne MAD1 MadridColocation Alcobendas, Spain Operational 18 MW IT — Operator / official
FRA2Colocation Frankfurt am Main, Germany Operational 18 MW IT — Operator / official
CyrusOne DUB1 DublinColocation Dublin, Ireland Operational 14 MW IT — Operator / official
CyrusOne LON2Colocation London, United Kingdom Operational 14 MW IT — Operator / official
CyrusOne DFW2 LewisvilleColocation Lewisville, United States Operational 12 MW IT — Operator / official
CyrusOne CIN2Colocation Cooling: Chilled water, cooling towers Cincinnati, United States Operational 11 MW IT — Operator / official
CyrusOne Sterling NVA4Hyperscale Sterling, United States Operational 11 MW IT — Operator / official
FRA4Colocation Frankfurt am Main, Germany Operational 11 MW IT — Operator / official
CyrusOne LON1Colocation Slough, United Kingdom Operational 9 MW IT — Operator / official
CyrusOne LON3Colocation Slough, United Kingdom Operational 9 MW IT — Operator / official
CyrusOne OCB1 Council BluffsColocation Cooling: Chilled water, dry coolers Council Bluffs, United States Operational 9 MW IT — Operator / official
CyrusOne SAT1 San AntonioColocation San Antonio, United States Operational 9 MW IT — Operator / official
FRA1Colocation Frankfurt am Main, Germany Operational 9 MW IT — Operator / official
CyrusOne Totowa NYM2Colocation Totowa, United States Operational 6 MW IT — Operator / official
CyrusOne CIN6Colocation Florence, United States Operational 5 MW IT — Operator / official
CyrusOne PAR1 ParisColocation Wissous, France Operational 4.5 MW IT — Operator / official
NYM5Colocation Norwalk, United States Operational 4 MW IT — Operator / official
CyrusOne Wappingers Falls NYM7Colocation Wappingers Falls, United States Operational 3 MW IT — Operator / official
CyrusOne Bosque CountyHyperscale
History
  1. Under construction
  2. Planned
  3. Under construction
United States Under construction — — Operator / official
CyrusOne DFW5 AllenColocation Allen, United States Planned — — Operator / official

Market position

How CyrusOne compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, CyrusOne ranks #15 of 171 tracked operators by capacity, with 1.6% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In United Kingdom, CyrusOne ranks #14 of 54 tracked operators by capacity, with 2% of the country’s tracked MW.
  • In Germany, CyrusOne ranks #7 of 56 tracked operators by capacity, with 5.2% of the country’s tracked MW.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
CyrusOne rank by capacity#15of 171 operators · 1.6%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
CyrusOne rank by capacity#14of 54 operators · 2%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
CyrusOne rank by capacity#7of 56 operators · 5.2%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
maincubes639 MW226 MW
Virtus Data Centres2—262 MW

All data centers in Germany Power and policy in Germany

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does CyrusOne operate?

DC Market Insights tracks 58 CyrusOne data center(s) in 9 countries as of November 2026: 40 operational, 7 under construction and 11 planned.

Where is CyrusOne headquartered?

CyrusOne is headquartered in Dallas, United States. Ownership: Owned by funds managed by KKR and Global Infrastructure Partners (GIP).

Which other companies operate data centers in United States?

Besides CyrusOne, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst