Proprietary data
CyrusOne Data Centers
Data centers operated by CyrusOne that we have verified: location, status and capacity, each checked against its source.
In short
As of 21 November 2026, DC Market Insights tracks 58 data centers operated by CyrusOne in 9 countries, of which 40 are operational. Stated operational capacity is 1,267 MW, with a further 362 MW under construction and 294 MW planned. The pipeline is 0.5 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 48 of 58 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
CyrusOne data centers: key facts
About CyrusOne
CyrusOne is a Dallas-based data center owner, developer and operator serving hyperscale and enterprise customers. In October 2026 its website states more than 60 operational data centers, more than 50 in development, 9 countries served, 16.2 million sq ft of data center space and more than 1 GW of power capacity, across North America, Europe and Japan.
- Headquarters
- Dallas, United States
- Founded
- 2001
- Ownership
- Owned by funds managed by KKR and Global Infrastructure Partners (GIP)
- Tracked footprint
- 58 facilities in 9 countries
- Website
- cyrusone.com
Data center business
- CyrusOne secures power alongside land: in Texas it reports more than 1,100 MW under contract with Calpine (Constellation), including 400 MW at Thad Hill Energy Center in Bosque County and 380 MW at Freestone Energy Center, with exclusivity on a further 380 MW.
- The CyrusOne site lists 54 campus and building entries: 34 in North America (Arizona, Illinois, Iowa, the New York metro, North Carolina, Ohio/Kentucky, Texas, Virginia and Washington), 19 in EMEA (London, Frankfurt, Amsterdam, Paris, Dublin, Madrid, Milan) and one in Japan (Osaka). Fourteen are marked In Development.
- Texas is the largest US cluster: Allen, Austin, Carrollton, Houston, Lewisville, Richardson and three San Antonio campuses are operating, with new large campuses in development in Bosque, Freestone and Medina counties and Sulphur Springs. Medina County, near Castroville, is a multiphase campus with a stated $4 to $6 billion investment.
- Northern Virginia (Sterling NVA1 to NVA9) and Phoenix (Chandler PHX1 to PHX8) are its largest operating campuses by stated IT capacity on the site pages; the Chicago area has Aurora CHI1 to CHI3 and CHI9 plus the Yorkville Technology Campus, whose first building is expected in late 2027.
- In Europe CyrusOne runs London (LON1 to LON5, LON6 in development at Iver Heath), Frankfurt (FRA1 to FRA4 operating; FRA5, FRA6 and FRA7 in development, FRA7 at 81 MW IT initially), Amsterdam AMS1 (up to 54 MW IT), Dublin DUB1 (14 MW IT), Madrid MAD1 (18 MW IT) and Paris PAR1 in Wissous (4.5 MW live, 27 MW at full build).
- In Japan, CyrusOne KEP OSK1 in the Keihanna area of Kansai is planned at 48 MW of IT capacity in six 8 MW halls, with the first phase due in Q1 2028.
- Services cover build-to-suit, colocation, interconnection, and AI and high-density deployments for hyperscale and enterprise customers.
Recent updates
- In a letter backing Texas digital infrastructure policy, CyrusOne said it has invested more than $5 billion across five active development sites, supporting more than 5,000 jobs, with more than 1,400 workers at one Texas site.
- John Hatem was named Chief Executive Officer and board member with immediate effect, succeeding Eric Schwartz; KKR and Global Infrastructure Partners partners commented on the change.
- Andreas Paduch was appointed Managing Director, Europe.
- CyrusOne broke ground on MIL1 in Segrate, its first data center in Italy: 27 MW of IT capacity in three 9 MW halls and 7,000 sqm of technical space, with over €6 million for local infrastructure.
- CyrusOne upsized and extended about $8.0 billion of loan facilities: a revolving credit facility of about $3.8 billion and a $4.2 billion US term loan, led by Goldman Sachs and Wells Fargo.
- Constellation's Calpine signed a 380 MW agreement to support a CyrusOne data center next to the Freestone Energy Center in Freestone County, Texas.
- CyrusOne and Eolian partnered on DFW7, a 200 MW campus under construction in Fort Worth since April 2025, next to the 100 MW Chisholm Grid battery site; capacity is offered from 2026.
Company details checked against company and official sources, 13 Oct 2026.
- Capacity under construction or planned (656 MW) is 0.5 times the operational base of 1,267 MW.
- Its largest operational site is CyrusOne Chandler PHX1-PHX8 in Chandler, United States at 169 MW.
- The largest project in the pipeline is CyrusOne DFW7 Fort Worth (200 MW, under construction).
- United States accounts for 65% of tracked capacity (37 facilities).
- By type, the tracker lists 41 colocation and 17 hyperscale facilities.
- 48 of 58 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
CyrusOne development pipeline
Under construction and planned facilities with a stated capacity, largest first. 362 MW under construction and 294 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| CyrusOne DFW7 Fort WorthCyrusOne | Fort Worth, United States | Under construction | Hyperscale | 200 MW |
| CyrusOne LON6CyrusOne | Iver Heath, United Kingdom | Planned | Hyperscale | 108 MW |
| FRA6CyrusOne | Frankfurt am Main, Germany | Planned | Colocation | 84 MW |
| FRA7CyrusOne | Frankfurt am Main, Germany | Under construction | Colocation | 81 MW |
| FRA5CyrusOne | Hanau am Main, Germany | Under construction | Colocation | 54 MW |
| CyrusOne MIL2 MilanCyrusOne | Milan, Italy | Planned | Colocation | 54 MW |
| CyrusOne KEP OSK1CyrusOne | Japan | Planned | Colocation | 48 MW |
| CyrusOne MIL1 MilanCyrusOne | Segrate, Italy | Under construction | Colocation | 27 MW |
Facilities
58 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
CyrusOne Freestone CountyHyperscale
History
|
United States | Planned | — | — | Operator / official |
| CyrusOne Lee County Data CenterHyperscale | Sanford, United States | Planned | — | — | Operator / official |
| CyrusOne Medina CountyHyperscale | Castroville, United States | Under construction | — | — | Operator / official |
| CyrusOne Sangamon County Data CenterHyperscale | United States | Planned | — | — | Operator / official |
| CyrusOne Sequoia Santa ClaraHyperscale Cooling: Chilled water, dry coolers | Santa Clara, United States | Planned | — | — | Trade press |
CyrusOne SouthallColocation
History
|
Southall, United Kingdom | Planned | — | — | Trade press |
| CyrusOne Sulphur SpringsHyperscale | Sulphur Springs, United States | Planned | — | — | Operator / official |
| CyrusOne Yorkville Technology CampusHyperscale | Yorkville, United States | Under construction | — | — | Operator / official |
Market position
How CyrusOne compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, CyrusOne ranks #15 of 171 tracked operators by capacity, with 1.6% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In United Kingdom, CyrusOne ranks #14 of 54 tracked operators by capacity, with 2% of the country’s tracked MW.
- In Germany, CyrusOne ranks #7 of 56 tracked operators by capacity, with 5.2% of the country’s tracked MW.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Equinix | 15 | — | 250 MW |
All data centers in United Kingdom Power and policy in United Kingdom
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| maincubes | 6 | 39 MW | 226 MW |
| Virtus Data Centres | 2 | — | 262 MW |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does CyrusOne operate?
DC Market Insights tracks 58 CyrusOne data center(s) in 9 countries as of November 2026: 40 operational, 7 under construction and 11 planned.
Where is CyrusOne headquartered?
CyrusOne is headquartered in Dallas, United States. Ownership: Owned by funds managed by KKR and Global Infrastructure Partners (GIP).
Which other companies operate data centers in United States?
Besides CyrusOne, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.