As of 9 November 2026, DC Market Insights tracks 65 data centers operated by NTT DATA in 9 countries, of which 50 are operational. Stated operational capacity is 782 MW, with a further 115 MW under construction and 1,102 MW planned. The pipeline is 1.6 times the capacity already operating.

65Facilities tracked
9Countries
782 MWOperational (50 sites)
115 MWUnder construction (2 sites)
1,102 MWPlanned (13 sites)

MW = IT capacity where the source states it, otherwise total capacity. 56 of 65 facilities have a stated capacity; the others are counted as sites only.

Mumbai 5 · NTT DATA · Mumbai (approximate location)Mumbai 6 · NTT DATA · Mumbai (approximate location)Mumbai 7 · NTT DATA · Mumbai (approximate location)Mumbai Vikhroli · NTT DATA · Mumbai (approximate location)Mumbai Vikhroli IV · NTT DATA · Mumbai (approximate location)Mumbai BSE · NTT DATA · Mumbai (approximate location)Navi Mumbai NAV1 campus · NTT DATA · Navi Mumbai (approximate location)Navi Mumbai NAV2 campus · NTT DATA · Navi Mumbai (approximate location)Bengaluru 2 · NTT DATA · Bengaluru (approximate location)Bengaluru 3 · NTT DATA · Bengaluru (approximate location)Bengaluru 4 campus · NTT DATA · Bengaluru (approximate location)Chennai 1 · NTT DATA · Chennai (approximate location)Chennai 2 · NTT DATA · Chennai (approximate location)Noida 1 · NTT DATA · Noida (approximate location)Noida 2 · NTT DATA · Noida (approximate location)Kolkata 1 · NTT DATA · Kolkata (approximate location)Serangoon Data Center · NTT DATA · Singapore (approximate location)CBJ1 · NTT DATA · Cyberjaya (approximate location)CBJ3 · NTT DATA · Cyberjaya (approximate location)CBJ4 · NTT DATA · Cyberjaya (approximate location)CBJ4 Annex · NTT DATA · Cyberjaya (approximate location)CBJ5 · NTT DATA · Cyberjaya (approximate location)CBJ6 · NTT DATA · Cyberjaya (approximate location)NTT Hemel Hempstead 1 · NTT DATA · Hemel Hempstead (approximate location)NTT Hemel Hempstead 2 · NTT DATA · Hemel Hempstead (approximate location)NTT Hemel Hempstead 3 · NTT DATA · Hemel Hempstead (approximate location)NTT Hemel Hempstead 4 · NTT DATA · Hemel Hempstead (approximate location)NTT London 1 · NTT DATA · Dagenham (approximate location) · Cooling: HybridFrankfurt 1 · NTT DATA · Frankfurt am Main (approximate location)Frankfurt 2 · NTT DATA · Frankfurt am Main (approximate location)Frankfurt 3 · NTT DATA · Rüsselsheim am Main (approximate location)Frankfurt 4 · NTT DATA · Hattersheim (approximate location)Berlin 1 · NTT DATA · Berlin (approximate location)Berlin 2 · NTT DATA · Berlin (approximate location)Munich 1 · NTT DATA · Kirchheim bei München (approximate location)Munich 2 · NTT DATA · Unterschleißheim (approximate location)Hamburg 1 · NTT DATA · Hamburg (approximate location)Frankfurt 5 · NTT DATA · Hattersheim (approximate location)Frankfurt 6 · NTT DATA · Nierstein (approximate location)Berlin Brieselang campus (third Berlin campus) · NTT DATA · Brieselang (approximate location)Keihanna OSK11 · NTT DATA · Soraku District (approximate location)NTT DATA Ashburn VA1 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA2 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA3 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA4 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA5 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA7 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA6 · NTT DATA · Ashburn (approximate location)NTT DATA Gainesville VA11 · NTT DATA · Gainesville (approximate location)NTT DATA Dallas TX1 · NTT DATA · Garland (approximate location)NTT DATA Dallas TX4 · NTT DATA · Garland (approximate location)NTT DATA Phoenix PH4 · NTT DATA · Mesa (approximate location)NTT DATA Mesa Pecos & Crismon campus · NTT DATA · Mesa (approximate location)NTT DATA SV1 Santa Clara · NTT DATA · Santa Clara (approximate location)NTT DATA Sacramento CA1 · NTT DATA · Sacramento (approximate location)NTT DATA Sacramento CA2 · NTT DATA · Sacramento (approximate location)NTT DATA Sacramento CA3 · NTT DATA · Sacramento (approximate location)NTT DATA Chicago CH1 · NTT DATA · Itasca (approximate location)NTT DATA Itasca expansion site · NTT DATA · Itasca (approximate location)Milan campus · NTT DATA · Milan (approximate location)Tochigi campus · NTT DATA · Tochigi (approximate location)Osaka Nishiai campus · NTT DATA · Osaka (approximate location)NTT DATA Phoenix PH1 · NTT DATA · Mesa (exact location)NTT DATA Hillsboro HI1 · NTT DATA · Hillsboro (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

NTT DATA data centers: key facts

About NTT DATA

NTT DATA runs its data center business through NTT Global Data Centers, which says it operates more than 160 data centers in over 20 countries and regions with more than 2,000MW of critical IT load, and calls itself the third-largest data center provider in the world. Key markets include Northern Virginia, Phoenix, Hillsboro, Sacramento, Dallas, Chicago, Frankfurt, Berlin, London, Mumbai, Bengaluru, Cyberjaya, Singapore and Japan. In March 2026 it said ten facilities opened over the prior year added more than 370MW of IT capacity, under a plan to invest over $10 billion by 2027.

Headquarters
Tokyo, Japan
Founded
1988
Ownership
Subsidiary of NTT (81.75% after the June 2025 tender offer, then share consolidation); delisted from the Tokyo Stock Exchange Prime Market on 26 Sep 2025
Parent company
Nippon Telegraph and Telephone (NTT)
Tracked footprint
65 facilities in 9 countries
Website
services.global.ntt

Data center business

  • NTT Global Data Centers reports an average annual PUE of 1.35 across its portfolio (sites with 24 months at 20%+ IT utilization), 72% renewable energy for non-IT load, long-term PPAs of 675 GWh, and a 34% cut in operational carbon emissions since FY21.
  • Over the year to March 2026 NTT DATA launched ten new facilities across North America, EMEA and APAC, delivering more than 370MW of new IT capacity, as part of a multi-year plan to invest over $10 billion by 2027.
  • NTT DC REIT, sponsored by NTT DATA subsidiary NTT Limited, listed on the Singapore Exchange in July 2025 with six data center assets in the United States, Austria and Singapore totalling about 90MW of IT load, all operated by NTT DATA.
  • In May 2025 NTT DATA said land bought in the prior six months supports nearly a gigawatt of planned capacity: a new 128MW site in Milan (53 acres) and about 100MW in Tochigi, Japan (two data centers), plus expansion in Hillsboro (354MW total planned), Phoenix/Mesa (just under 600MW across two campuses), London (new 26.3-acre LON2 site), Frankfurt (about 80MW, fifth site) and Osaka Nishiai (36MW, two data centers).
  • NTT Global Data Centers says it operates over 160 data centers in more than 20 countries and regions, with 2,000MW+ of critical IT load, and describes itself as the 3rd largest data center provider in the world. In the Americas it runs seven data center campuses.
  • The division's CEO, Doug Adams, oversees more than 160 data centers and manages more than $10 billion in capital development. Adams co-founded RagingWire, which NTT Communications fully acquired in 2017.

Recent updates

  • NTT DATA published the 2026 Sustainability Report for NTT Global Data Centers, reporting a 34% cut in operational emissions since FY21 and 1.58 GWh of excess heat delivered from a Frankfurt data center to local heating.
  • NTT DATA and ENGIE announced a strategic energy partnership, with working agreements signed in the UK, Netherlands and Germany; in the UK a corporate PPA supplies NTT DATA data centers until September 2030 from a 24MW wind farm in South Wales.
  • NTT DATA created a global sales and client services organization for its data center business and promoted Konstantin Hartmann, previously Managing Director EMEA, to SVP Global Sales & Client Services.
  • NTT DATA opened the Keihanna OSK11 data center in Kyoto Prefecture with 30MW of IT load, its fourteenth data center in Japan.
  • NTT DATA signed four capacity commitments totalling nearly 115MW, including more than 90MW for a hyperscale client at the VA11 campus in Gainesville, Virginia, and nearly 20MW for three enterprises in Chicago and Sacramento.
  • IDC named NTT DATA a Leader in its Worldwide Datacenter Colocation Services 2025 Vendor Assessment, the fourth time it received the rating.
  • NTT's tender offer for NTT DATA Group raised its ownership to 81.75%; after a share consolidation NTT DATA Group was delisted from the Tokyo Stock Exchange Prime Market on 26 September 2025.

Company details checked against company and official sources, 12 Oct 2026.

  • Capacity under construction or planned (1,217 MW) is 1.6 times the operational base of 782 MW.
  • Its largest operational site is Frankfurt 1 in Frankfurt am Main, Germany at 70.1 MW.
  • The largest project in the pipeline is Frankfurt 6 by NTT DATA (482 MW, planned).
  • Germany accounts for 44% of tracked capacity (12 facilities).
  • By type, the tracker lists 61 colocation and 4 hyperscale facilities.
  • 56 of 65 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational782 MW
Under construction115 MW
Planned1,102 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
9≤2014'15'16'17'18'19'2023'21'22'23'24'2530'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Capacity by country, MW
Germany881 MW
India262 MW
Japan166 MW
Italy128 MW
Malaysia16.7 MW
Singapore8.6 MW

OperationalUnder construction or planned

Facilities by type
Colocation61
Hyperscale4

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

NTT DATA development pipeline

Under construction and planned facilities with a stated capacity, largest first. 115 MW under construction and 1,102 MW planned in total.

ProjectLocationStatusTypeCapacity
Frankfurt 6NTT DATA Nierstein, Germany Planned Colocation 482 MW
Milan campusNTT DATA Milan, Italy Planned Colocation 128 MW
Tochigi campusNTT DATA Tochigi, Japan Planned Colocation 100 MW
Berlin Brieselang campus (third Berlin campus)NTT DATA Brieselang, Germany Planned Colocation 96 MW
NTT DATA Gainesville VA11NTT DATA Gainesville, United States Planned Hyperscale 96 MW
Frankfurt 5NTT DATA Hattersheim, Germany Under construction Hyperscale 80 MW
Bengaluru 4 campusNTT DATA Bengaluru, India Planned Colocation 67.2 MW
Osaka Nishiai campusNTT DATA Osaka, Japan Planned Colocation 36 MW
NTT DATA Ashburn VA7NTT DATA Ashburn, United States Planned Colocation 36 MW
NTT DATA Phoenix PH4NTT DATA Mesa, United States Planned Colocation 36 MW
Chennai 2NTT DATA Chennai, India Under construction Colocation 34.8 MW
Kolkata 1NTT DATA Kolkata, India Planned Colocation 25 MW

Facilities

65 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Frankfurt 6Colocation
History
  1. Planned
  2. Planned
  3. Under construction
  4. Under construction
  5. Planned
Nierstein, Germany Planned 482 MW IT — Trade press
Milan campusColocation Milan, Italy Planned 128 MW total — Operator / official
Tochigi campusColocation Tochigi, Japan Planned 100 MW total — Operator / official
Berlin Brieselang campus (third Berlin campus)Colocation
History
  1. Announced
  2. Planned
Brieselang, Germany Planned 96 MW IT — Operator / official
NTT DATA Gainesville VA11Hyperscale
History
  1. Planned
  2. Planned
Gainesville, United States Planned 96 MW IT — Operator / official
Frankfurt 5Hyperscale
History
  1. Planned
  2. Under construction
  3. Under construction
Hattersheim, Germany Under construction 80 MW IT — Operator / official
Frankfurt 1Colocation Frankfurt am Main, Germany Operational 70.1 MW IT — Operator / official
Bengaluru 4 campusColocation Bengaluru, India Planned 67.2 MW IT — Operator / official
Frankfurt 3Colocation Rüsselsheim am Main, Germany Operational 60.5 MW IT — Operator / official
NTT DATA Ashburn VA7Colocation Ashburn, United States Planned 36 MW IT — Operator / official
NTT DATA Hillsboro HI1Colocation
History
  1. Operational
  2. Operational
Hillsboro, United States Operational 36 MW IT — Operator / official
NTT DATA Phoenix PH1Colocation
History
  1. Under construction
  2. Operational
Mesa, United States Operational 36 MW IT — Operator / official
NTT DATA Phoenix PH4Colocation Mesa, United States Planned 36 MW IT — Operator / official
Osaka Nishiai campusColocation Osaka, Japan Planned 36 MW total — Operator / official
Chennai 2Colocation Chennai, India Under construction 34.8 MW IT — Operator / official
Frankfurt 4Colocation Hattersheim, Germany Operational 34.4 MW IT — Operator / official
NTT DATA Ashburn VA4Colocation Ashburn, United States Operational 32 MW IT — Operator / official
NTT DATA Ashburn VA5Colocation Ashburn, United States Operational 32 MW IT — Operator / official
NTT London 1Colocation Cooling: Hybrid Dagenham, United Kingdom Operational 32 MW IT — Operator / official
Keihanna OSK11Colocation
History
  1. Announced
  2. Operational
Soraku District, Japan Operational 30 MW IT 2026 Operator / official
Navi Mumbai NAV1 campusColocation Navi Mumbai, India Operational 30 MW IT — Operator / official
NTT DATA Sacramento CA2Colocation Sacramento, United States Operational 26.1 MW IT — Operator / official
Mumbai 7Colocation Mumbai, India Operational 25.6 MW IT — Operator / official
Kolkata 1Colocation Kolkata, India Planned 25 MW IT — Operator / official
Berlin 2Colocation Berlin, Germany Operational 24 MW IT — Operator / official
NTT Hemel Hempstead 4Colocation Hemel Hempstead, United Kingdom Operational 24 MW IT — Operator / official
Noida 2Hyperscale Noida, India Operational 22.4 MW IT — Trade press
Amsterdam 1 (AMS1)Colocation Rozenburg, Netherlands Operational 20.7 MW IT — Operator / official
NTT Hemel Hempstead 3Colocation Hemel Hempstead, United Kingdom Operational 20 MW IT — Operator / official
Mumbai 6Colocation Mumbai, India Operational 19.2 MW IT — Operator / official
Berlin 1Colocation Berlin, Germany Operational 17.1 MW IT — Operator / official
NTT DATA Ashburn VA3Colocation Ashburn, United States Operational 16 MW IT — Operator / official
NTT DATA Dallas TX1Colocation Garland, United States Operational 16 MW IT — Operator / official
NTT DATA SV1 Santa ClaraColocation Santa Clara, United States Operational 16 MW IT 2021 Trade press
Munich 2Colocation Unterschleißheim, Germany Operational 14 MW IT — Operator / official
NTT DATA Ashburn VA2Colocation Ashburn, United States Operational 14 MW IT — Operator / official
NTT DATA Sacramento CA3Colocation Sacramento, United States Operational 14 MW IT — Operator / official
NTT DATA Ashburn VA1Colocation Ashburn, United States Operational 12.6 MW IT — Operator / official
NTT DATA Sacramento CA1Colocation Sacramento, United States Operational 12.6 MW IT — Operator / official
Mumbai 5Colocation Mumbai, India Operational 12.5 MW IT — Operator / official
Bengaluru 3Colocation Bengaluru, India Operational 12 MW IT — Operator / official
Serangoon Data CenterColocation Singapore, Singapore Operational 8.6 MW IT 2012 Operator / official
CBJ5Colocation
History
  1. Operational
  2. Operational
Cyberjaya, Malaysia Operational 7 MW IT 2021 Operator / official
CBJ6Colocation Cyberjaya, Malaysia Operational 7 MW IT — Operator / official
NTT Hemel Hempstead 2Colocation Hemel Hempstead, United Kingdom Operational 6.2 MW IT — Operator / official
Bengaluru 2Colocation Bengaluru, India Operational 4.5 MW IT — Operator / official
Mumbai Vikhroli IVColocation Mumbai, India Operational 3 MW IT — Operator / official
CBJ4Colocation
History
  1. Under construction
  2. Operational
Cyberjaya, Malaysia Operational 2.7 MW IT — Operator / official
Mumbai VikhroliColocation Mumbai, India Operational 2.4 MW IT — Operator / official
NTT Hemel Hempstead 1Colocation Hemel Hempstead, United Kingdom Operational 2.1 MW IT — Operator / official

Market position

How NTT DATA compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, NTT DATA ranks #29 of 171 tracked operators by capacity, with 0.6% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In India, NTT DATA ranks #10 of 31 tracked operators by capacity, with 2.6% of the country’s tracked MW.
  • In Germany, NTT DATA ranks #1 of 56 tracked operators by capacity, with 17% of the country’s tracked MW.
  • Ashburn also hosts 10 other tracked data center(s), run by Vantage Data Centers, PowerHouse Data Centers, Cologix and QTS.
  • Our Deal Tracker lists 1 deal(s) naming NTT DATA, the latest on 5 November 2026.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
NTT DATA rank by capacity#29of 171 operators · 0.6%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Data center operators in India

Tracked facilities19931 operators
Operational capacity2,276 MW7,840 MW in the pipeline
NTT DATA rank by capacity#10of 31 operators · 2.6%
Industrial power price82.1 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
AdaniConneX61,033 MW2,000 MW
CtrlS24276 MW1,695 MW
HyperVault2—1,000 MW
STT GDC India34217 MW393 MW
Sify16188 MW290 MW
Amazon Web Services2—473 MW
Princeton Digital Group548 MW382 MW
Nxtra (Airtel)538 MW315 MW

All data centers in India Power and policy in India

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
NTT DATA rank by capacity#1of 56 operators · 17%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW
Virtus Data Centres2—262 MW

All data centers in Germany Power and policy in Germany

Other data centers in Ashburn

Deals naming NTT DATA

  • NTT DATA → 900 MW onsite power (Bloom Energy fuel cells) across multiple data center projects Power deal

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does NTT DATA operate?

DC Market Insights tracks 65 NTT DATA data center(s) in 9 countries as of November 2026: 50 operational, 2 under construction and 13 planned.

Where is NTT DATA headquartered?

NTT DATA is headquartered in Tokyo, Japan. Ownership: Subsidiary of NTT (81.75% after the June 2025 tender offer, then share consolidation); delisted from the Tokyo Stock Exchange Prime Market on 26 Sep 2025.

Which other companies operate data centers in United States?

Besides NTT DATA, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Ashburn?

Other tracked data centers in Ashburn include Vantage Ashburn III (VA3) campus (Vantage Data Centers), PowerHouse Pacific (PowerHouse Data Centers), Cologix Ashburn Beaumeade land (38 acres) (Cologix) and QTS Ashburn 3 (QTS).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst