Proprietary data
QTS Data Centers
Data centers operated by QTS that we have verified: location, status and capacity, each checked against its source.
In short
As of 14 October 2026, DC Market Insights tracks 55 data centers operated by QTS in 6 countries, of which 26 are operational. Stated operational capacity is 1,981 MW, with a further 22.5 MW under construction and 980 MW planned. The pipeline is 0.5 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 28 of 55 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
QTS data centers: key facts
About QTS Data Centers
QTS designs, builds and operates data centers for hyperscale, enterprise and government customers in North America and Europe and is a Blackstone portfolio company. Its October 2026 location list names 49 campuses and sites, operating or in development, in 16 U.S. states and in Finland, Italy, the Netherlands, Spain and the United Kingdom. The largest stated campuses are Atlanta 1 (278+ MW) and Richmond 1 (240+ MW) of critical capacity.
- Headquarters
- Sterling, United States
- Founded
- 2003
- Ownership
- Blackstone portfolio company
- Parent company
- Blackstone
- Tracked footprint
- 55 facilities in 6 countries
- Website
- q.com
Data center business
- QTS reports 26 data centers earning ENERGY STAR certification in 2025, $24 billion of green financing supporting more than 30 data centers, 100% carbon-free operational electricity and 16 years of 99.999% uptime.
- QTS describes itself as a global data center leader with access to scalable infrastructure across North America and Europe, serving hyperscale technology companies, enterprises and government entities. Its U.S. headquarters is at 22271 Broderick Drive, Sterling, Virginia, with an office in London and an operations center in Suwanee, Georgia.
- On its leadership page QTS describes itself as a digital infrastructure leader in designing, building and operating sustainable data centers, with 75 data centers in operation or under development across the United States and Europe.
- Largest stated campuses on the QTS location list: Atlanta 1 (99 acres, 278+ MW), Richmond 1 in Sandston, Virginia (100 acres, 240+ MW), Manassas 1 (105 acres, 190+ MW), Hillsboro 2 in Oregon (51 acres, 180+ MW), Irving, Texas (56 acres, 165+ MW) and Denver/Aurora (65 acres, 160+ MW planned).
- Northern Virginia is a core market: Ashburn 1 (55+ MW), Ashburn 2 (75+ MW), Ashburn 3 (80+ MW) and Ashburn Moran (4+ MW), plus Manassas 1 and the Richmond campuses. Richmond 2 is a five-building master-planned campus on about 85 acres with 180 MW planned on completion.
- Campuses in development include York County (Rock Hill), South Carolina, a nine-building, three-phase campus backed by an $8 billion QTS investment, with two buildings under construction in 2026, and Cedar Rapids, Iowa, a $10 billion campus that QTS says supports more than 2,000 construction jobs.
- In Europe QTS lists Groningen and Eemshaven in the Netherlands and Cambois in the UK, and new sites in Forssa, Finland (150 hectares, phase one construction tentatively from 2027), Calatorao, Spain (224 hectares) and Vimercate, Italy (a former industrial area of 277,800 sq m).
Recent updates
- 9 Oct 2026: QTS and Lancium agreed with the City of Turkey, Texas, to provide up to $15.5 million for city services and infrastructure for the data center campus on Lancium's Hall County Clean Campus, with $1.5 million a year through 2032.
- 9 Sep 2026: QTS launched a $1 billion global water stewardship pledge toward its goal of becoming water positive by 2035.
- 31 Aug 2026: QTS committed $250 million over ten years to Texas water infrastructure and stewardship, including $15 million with the Bonneville Environmental Foundation and a new water tower for Turkey, Texas.
- 26 Aug 2026: QTS published its 2025 Sustainability Report, its eighth year of reporting: WUE improved 46% year over year, and 100% of new greenfield data centers were commissioned with closed-loop, water-free cooling.
Company details checked against company and official sources, 3 Nov 2026.
- Capacity under construction or planned (1,003 MW) is 0.5 times the operational base of 1,981 MW.
- Its largest operational site is Atlanta 1 in Atlanta, United States at 278 MW.
- The largest project in the pipeline is QTS Cambois (720 MW, planned).
- United States accounts for 76% of tracked capacity (47 facilities).
- By type, the tracker lists 47 hyperscale and 8 colocation facilities.
- 28 of 55 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
QTS development pipeline
Under construction and planned facilities with a stated capacity, largest first. 22.5 MW under construction and 980 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| QTS CamboisQTS | Blyth, United Kingdom | Planned | Hyperscale | 720 MW |
| QTS Aurora-Denver 1QTS | Aurora, United States | Planned | Hyperscale | 160 MW |
| QTS Hillsboro 3QTS | Hillsboro, United States | Planned | Hyperscale | 100 MW |
| QTS Ashburn 1 DC2QTS | Sterling, United States | Under construction | Hyperscale | 22.5 MW |
Facilities
55 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| QTS SalemHyperscale | United States | Planned | — | — | Trade press |
QTS SLC1 Eagle MountainHyperscale
History
|
Eagle Mountain, United States | Under construction | — | — | Trade press |
| QTS South DallasHyperscale | Wilmer, United States | Planned | — | — | Operator / official |
| QTS Van WertHyperscale | Van Wert, United States | Planned | — | — | Operator / official |
| QTS VimercateHyperscale | Vimercate, Italy | Planned | — | — | Operator / official |
Market position
How QTS compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, QTS ranks #9 of 171 tracked operators by capacity, with 2.9% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Netherlands, QTS ranks #12 of 33 tracked operators by capacity, with 0.8% of the country’s tracked MW.
- In Italy, QTS is one of 7 operators we track.
- Sterling also hosts 10 other tracked data center(s), run by Menlo Digital, Centersquare, CyrusOne and EdgeCore Digital Infrastructure.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 4 | 40 MW | 162 MW |
| CloudHQ | 1 | — | 84 MW |
| Pure DC | 1 | — | 78 MW |
| Digital Realty | 13 | — | 70 MW |
| NorthC | 14 | 57 MW | — |
| CyrusOne | 1 | 54 MW | — |
| Iron Mountain | 2 | 13.1 MW | 20 MW |
| NTT DATA | 1 | 20.7 MW | — |
All data centers in Netherlands Power and policy in Netherlands
Data center operators in Italy
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Data4 | 2 | 170 MW | 100 MW |
| CloudHQ | 1 | — | 240 MW |
| NTT DATA | 1 | — | 128 MW |
| Vantage Data Centers | 2 | — | 96 MW |
| CyrusOne | 2 | — | 81 MW |
| Compass Datacenters | 1 | — | 48 MW |
All data centers in Italy Power and policy in Italy
Other data centers in Sterling
- Menlo Digital MD-VA2 Sterling · Menlo Digital · Planned · 144 MW
- Centersquare Sterling IAD1 · Centersquare · Operational · 143 MW
- CyrusOne Sterling NVA5-NVA7 · CyrusOne · Operational · 116 MW
- EdgeCore Ashburn Campus (Maries Road and Moran Road) · EdgeCore Digital Infrastructure · Under construction · 114 MW
- Vantage Ashburn II (VA2) campus · Vantage Data Centers · Planned · 96 MW
- Aligned IAD-03 · Aligned Data Centers · Operational · 72 MW
- CyrusOne Sterling NVA1-NVA3 · CyrusOne · Operational · 44 MW
- CyrusOne Sterling NVA9 · CyrusOne · Operational · 38 MW
- Centersquare Sterling IAD2 · Centersquare · Operational · 35.8 MW
- Vantage VA11 (Ashburn VA1 campus) · Vantage Data Centers · Operational · 30 MW
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does QTS operate?
DC Market Insights tracks 55 QTS data center(s) in 6 countries as of October 2026: 26 operational, 8 under construction and 21 planned.
Where is QTS headquartered?
QTS Data Centers is headquartered in Sterling, United States. Ownership: Blackstone portfolio company.
Which other companies operate data centers in United States?
Besides QTS, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Sterling?
Other tracked data centers in Sterling include Menlo Digital MD-VA2 Sterling (Menlo Digital), Centersquare Sterling IAD1 (Centersquare), CyrusOne Sterling NVA5-NVA7 (CyrusOne) and EdgeCore Ashburn Campus (Maries Road and Moran Road) (EdgeCore Digital Infrastructure).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.