Data Center Power & Policy in Morocco
Every government action on data centers and power in Morocco that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 26 November 2026, DC Market Insights tracks 12 government actions on data centers and power in Morocco, 9 of them in force. We have found no moratorium or restriction on new data centers in force in Morocco.
Market snapshot
Morocco power and policy: key facts
- Renewable share of electricity generation: 27% (2024). Rank 28 of 45 tracked countries, highest first.
- Latest change: 'Cloud First' circular for public administrations (planned 2027), favouring energy-efficient data centers (Government of Morocco (PLF 2027 note), 26 Oct 2026).
- By type: 3 plan or strategy, 3 regulation, 3 power tariff and 2 renewable energy.
Power indicators for Morocco
Latest official figure for each indicator, with earlier years where we have them.
In force now in Morocco
Grid access (1)
ANRE publishes national grid hosting capacity for renewables (five-year view)
Since January 2024 ANRE publishes the hosting capacity of the national power system: the renewable capacity the system can take over the next five years. It caps grid access for Law 13-09 producers and Law 82-21 self-generators, so it bounds renewable supply options for large loads.
Power tariff (3)
ANRE surplus power tariff 2026-27: 21 c/kWh peak, 18 c/kWh off-peak
ANRE fixed the price at which surplus power from Law 13-09 renewable producers and Law 82-21 self-generators is bought by network operators: 21 c/kWh in peak hours and 18 c/kWh off-peak, for 1 Mar 2026 to 28 Feb 2027, on HV/VHV and MV networks. Under Law 82-21 surplus sales are capped at 20% of annual output.
21 MAD centimes/kWh peak; off-peak 18
ANRE network use tariffs from 1 March 2026: TURT 6.85, TURD 6.07, TSS 6.81 centimes/kWh
The ANRE Board (17 Feb 2026, decisions 02/26 and 03/26) set the transmission network use tariff (TURT) at 6.85 c/kWh, the MV distribution network use tariff (TURD) at 6.07 c/kWh and system services (TSS) at 6.81 c/kWh from 1 March 2026. These charges apply to power wheeled over the grid under Laws 13-09 and 82-21, e.g. renewable or self-generated power delivered to a data center.
6.85 MAD centimes/kWh TURT; TURD 6.07, TSS 6.81
ANRE Decision 02/24: first regulated transmission tariff period 1 Mar 2024 to 28 Feb 2027
ANRE Decision 02/24 of 5 Feb 2024 set the first regulated tariff for use of the national transmission network for 1 March 2024 to 28 February 2027, based on the tariff methodology approved on 21 Dec 2022 and ONEE cost accounts; annual adjustments follow (2025, 2026).
Renewable energy (2)
National target: more than 52% renewables in the power mix by 2030
Morocco's national energy strategy targets more than 52% renewable energy in the electricity mix by 2030; renewables were 45% of installed capacity at end-2024 (ANRE).
52 % date = ANRE annual report 2024 publication (Dec 2025); target first set in the 2009 strategy
Decrees 2-24-761 (certificates of origin) and 2-24-804 (smart meters)
Two decrees of 22 Oct 2024, published 14 Nov 2024, implement Law 13-09 (as amended by 40-19) and Law 82-21: a certificate of origin for renewable electricity and rules for smart meters at self-generation and self-consumption sites, enabling buyers such as data centers to prove renewable supply.
Regulation (3)
Decree 2-25-100: rules to build and operate self-generation plants under Law 82-21
Decree 2-25-100 of 5 March 2026 sets the conditions and procedures to build and operate self-generation facilities, making Law 82-21 operational three years after the law. Three regimes: declaration (off-grid or LV), connection agreement (11 kW to 5 MW on LV/MV) and authorisation (5 MW or more on MV, HV or VHV), the route for large on-site or off-site power for data centers.
Decree 2-24-921: vital entities must use qualified, Moroccan-law cloud providers for sensitive systems
Decree on the use of cloud providers by entities and infrastructures of vital importance with sensitive information systems or data (Law 05-20 on cybersecurity), published in Bulletin Officiel 7352 (Nov 2024). Level-1 qualified providers must be Moroccan-law companies running all operation and administration systems on national territory; level 2 adds conditions for sensitive data. Drives local data center hosting demand.
Law 82-21 on self-generation of electricity: grid access for self-generators of 5 MW or more
Law 82-21 (Dahir 1-23-21 of 10 Feb 2023) lets companies, including data center operators, build their own power plants. Self-generators of 5 MW or more may use the national grid to carry power from the generation site to the consumption site, within the hosting capacity of the national grid, connected to MV or HV/VHV networks.
5 MW minimum self-generation capacity for use of the national grid
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
'Cloud First' circular for public administrations (planned 2027), favouring energy-efficient data centers
For 2027 the government plans a circular making cloud the default for every new public digital project; migration to a secure national infrastructure, with public procurement favouring highly energy-efficient data centers.
Jazari-Root 50 MW sovereign state data center in Rabat, 2027-2029
The PLF 2027 note announces the Jazari-Root sovereign data center in Rabat, 50 MW, over 2027-2029, the central root of the Jazari network hosting the State's strategic data, with a national sovereign cloud for Moroccans' data.
50 MW
Igoudar (Dakhla) 500 MW green data center campus: framework agreement 7 April 2026
The PLF 2027 presentation note lists a framework agreement signed on 7 April 2026 for the Igoudar green data center campus in Dakhla, 500 MW, plus a protocol with Nexus Core Systems Morocco for a sovereign AI Factory with an HPC data center.
500 MW
Timeline of data center and power policy in Morocco
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 26 Oct 2026 | 'Cloud First' circular for public administrations (planned 2027), favouring energy-efficient data centers | Plan or strategy | Proposed | Government of Morocco (PLF 2027 note) |
| 26 Oct 2026 | Jazari-Root 50 MW sovereign state data center in Rabat, 2027-2029 | Plan or strategy | Announced | Government of Morocco (PLF 2027 note) |
| 7 Apr 2026 | Igoudar (Dakhla) 500 MW green data center campus: framework agreement 7 April 2026 | Plan or strategy | Announced | Government of Morocco (Ministry of Digital Transition, PLF 2027 note) |
| 5 Mar 2026 | Decree 2-25-100: rules to build and operate self-generation plants under Law 82-21 | Regulation | In force | Government of Morocco (Ministry of Energy Transition) |
| 19 Feb 2026 | ANRE surplus power tariff 2026-27: 21 c/kWh peak, 18 c/kWh off-peak | Power tariff | In force | ANRE |
| 19 Feb 2026 | ANRE network use tariffs from 1 March 2026: TURT 6.85, TURD 6.07, TSS 6.81 centimes/kWh | Power tariff | In force | ANRE (Autorité Nationale de Régulation de l'Electricité) |
| 1 Dec 2025 | National target: more than 52% renewables in the power mix by 2030 | Renewable energy | In force | Government of Morocco (national energy strategy); reported by ANRE |
| 28 Nov 2024 | Decree 2-24-921: vital entities must use qualified, Moroccan-law cloud providers for sensitive systems | Regulation | In force | Government of Morocco; DGSSI (National Defence Administration) |
| 22 Oct 2024 | Decrees 2-24-761 (certificates of origin) and 2-24-804 (smart meters) | Renewable energy | In force | Government of Morocco |
| 5 Feb 2024 | ANRE Decision 02/24: first regulated transmission tariff period 1 Mar 2024 to 28 Feb 2027 | Power tariff | In force | ANRE |
| 31 Jan 2024 | ANRE publishes national grid hosting capacity for renewables (five-year view) | Grid access | In force | ANRE |
| 10 Feb 2023 | Law 82-21 on self-generation of electricity: grid access for self-generators of 5 MW or more | Regulation | In force | Parliament of Morocco (Dahir 1-23-21); ANRE regulates network access |
How Morocco compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in Morocco?
We have found no moratorium or restriction on new data centers in force in Morocco as of 26 November 2026. Proposed or announced measures, if any, are listed in the timeline.
How much of Morocco’s electricity is renewable?
Renewables supplied 27% of electricity generation in Morocco in 2024.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.