Proprietary data

Data Center Power & Policy in New Zealand

Every government action on data centers and power in New Zealand that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 26 November 2026, DC Market Insights tracks 8 government actions on data centers and power in New Zealand, 3 of them in force. We have found no moratorium or restriction on new data centers in force in New Zealand.

8Actions tracked
3In force
—Industrial power price
88.5%Renewable share of generation

Market snapshot

New Zealand power and policy: key facts

  • Renewable share of electricity generation: 88.5% (2025). Rank 4 of 46 tracked countries, highest first.
  • Grid emission factor: 0.08 kgCO2/kWh (2025). Rank 33 of 39 tracked countries, highest first.
  • Latest change: TPM amendments 2026: five targeted changes to transmission pricing from 1 Apr 2027 (Electricity Authority, 23 Nov 2026).
  • By type: 3 power tariff, 3 grid access, 1 regulation and 1 plan or strategy.

Power indicators for New Zealand

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 88.5% 2025 · share of electricity generated from renewable sources, calendar 2025 (85.5% in 2024) MBIE, Energy in New Zealand 2026
Grid emission factor 0.08 kgCO2/kWh 2025 · kg CO2-e per kWh, purchased grid-average electricity, annual average 2025 (Table 5.2, Measuring Emissions Catalogue 2026) Ministry for the Environment, Measuring emissions guide: 5 Purchased energy

In force now in New Zealand

Power tariff (2)

  • Power tariffIn force

    Transmission pricing methodology: a new data centre funds its own connection assets and is allocated a share of core grid costs

    Under the transmission pricing methodology (TPM) a new grid-connected data centre pays for its own grid-edge connection assets and is allocated a share of core grid costs; where its connection drives new core grid investment, the TPM spreads those costs across all parties expected to benefit, so data centres that drive upgrades could raise transmission charges for others (MBIE advice to the Minister for Economic Growth, 2 Jul 2026).

    Electricity Authority (TPM); described by MBIE · MBIE briefing BRIEFING-REQ-0033553, Data centres – options to capture benefits and manage risks (2 Jul 2026, proactive release)

  • Power tariffIn force

    Distribution connection pricing Code amendment: cost allocation, pioneer schemes and charge reconciliation from 1 Apr 2026

    Electricity Authority decision of 18 Jul 2025. From 1 April 2026 distributors must apply connection enhancement cost allocation, a pioneer scheme (the applicant that funds a network extension gets rebates from later users) and connection charge reconciliation; a fourth requirement (capacity costing) applies from 1 April 2027. Connections under large connection contracts are exempt from most of these requirements.

    Electricity Authority · Effective 1 Apr 2026 · Electricity Authority, Distribution connection pricing Code amendment – Decision paper (18 Jul 2025)

Plan or strategy (1)

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Power tariffAnnounced

    TPM amendments 2026: five targeted changes to transmission pricing from 1 Apr 2027

    Electricity Authority decision paper of 23 Nov 2026: five targeted amendments to the Transmission Pricing Methodology, in effect from 1 April 2027. Transpower's request to extend the first simple-method period beyond 31 March 2028 was declined.

    Electricity Authority · Effective 1 Apr 2027 · Electricity Authority, Decision paper: Transmission pricing methodology amendments 2026 (23 Nov 2026)

  • RegulationProposed

    MBIE advice: set government expectations for data centres (Australian model) and require large data centres to support system resilience

    MBIE advised the Minister for Economic Growth (2 Jul 2026) that there is merit in clarifying government expectations for data centres, modelled on Australia's expectations for data centre and AI infrastructure developers, and that a low-regrets approach could require large data centres to support new generation and firming, offer demand flexibility, provide grid stability services and contribute to transmission investment their demand drives. The Minister was asked whether officials should do further work; no decision published.

    Ministry of Business, Innovation and Employment · MBIE briefing BRIEFING-REQ-0033553, Data centres – options to capture benefits and manage risks (2 Jul 2026, proactive release)

  • Grid accessAnnounced

    Dry-year risk package: LNG imports and new electricity market measures (June 2026)

    The Government is acting on dry-year risk (shortage of firm supply in low-hydro periods), including LNG imports and new market measures announced in June 2026. MBIE advises that if these are in place by 2028, data centres connecting after that are unlikely to raise electricity prices for others.

    New Zealand Government (MBIE) · MBIE briefing BRIEFING-REQ-0033553, Data centres – options to capture benefits and manage risks (2 Jul 2026, proactive release)

  • Grid accessProposed

    Government Policy Statement on Electricity (June 2026): EA to consider requiring large customers to signal connections early

    Under the updated Government Policy Statement on Electricity (June 2026) the Electricity Authority will consider developing a requirement that large customers, such as data centres, signal their intention to connect well in advance. Transpower's connection process typically takes 2-4 years from enquiry to connection.

    Minister for Energy / Electricity Authority · MBIE briefing BRIEFING-REQ-0033553, Data centres – options to capture benefits and manage risks (2 Jul 2026, proactive release)

  • Grid accessAnnounced

    Network Connections Code amendment 2026: new application processes for distributed generation (1 Dec 2026) and load (1 Jun 2027)

    The Electricity Authority made the Electricity Industry Participation Code (Network Connections) Amendment 2026 on 9 Feb 2026 (notified 11 Feb 2026). It updates the application process for connecting distributed generation from 1 December 2026 and inserts new application processes for connecting load, including large loads such as data centres, from 1 June 2027.

    Electricity Authority · Effective 1 Dec 2026 · Electricity Authority, Code amendment page: Network Connections Amendment 2026

Timeline of data center and power policy in New Zealand

DateActionTypeStatusAuthority
23 Nov 2026TPM amendments 2026: five targeted changes to transmission pricing from 1 Apr 2027Power tariffAnnouncedElectricity Authority
2 Jul 2026MBIE advice: set government expectations for data centres (Australian model) and require large data centres to support system resilienceRegulationProposedMinistry of Business, Innovation and Employment
2 Jul 2026Dry-year risk package: LNG imports and new electricity market measures (June 2026)Grid accessAnnouncedNew Zealand Government (MBIE)
2 Jul 2026Government Policy Statement on Electricity (June 2026): EA to consider requiring large customers to signal connections earlyGrid accessProposedMinister for Energy / Electricity Authority
2 Jul 2026Transmission pricing methodology: a new data centre funds its own connection assets and is allocated a share of core grid costsPower tariffIn forceElectricity Authority (TPM); described by MBIE
1 Jul 2026Invest NZ Data and AI Infrastructure prospectus (1 Jul 2026): data centres a strategic investment priorityPlan or strategyIn forceInvest New Zealand
11 Feb 2026Network Connections Code amendment 2026: new application processes for distributed generation (1 Dec 2026) and load (1 Jun 2027)Grid accessAnnouncedElectricity Authority
18 Jul 2025Distribution connection pricing Code amendment: cost allocation, pioneer schemes and charge reconciliation from 1 Apr 2026Power tariffIn forceElectricity Authority

How New Zealand compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Morocco—27% (2024)—00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
New Zealand—88.5% (2025)0.08 kgCO2/kWh (2025)00
Norway100 USD/MWh (2026)96% (2025)0.01 kgCO2/kWh (2025)10
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in New Zealand?

We have found no moratorium or restriction on new data centers in force in New Zealand as of 26 November 2026. Proposed or announced measures, if any, are listed in the timeline.

How much of New Zealand’s electricity is renewable?

Renewables supplied 88.5% of electricity generation in New Zealand in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst