Data Center Power & Policy in New Zealand
Every government action on data centers and power in New Zealand that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 26 November 2026, DC Market Insights tracks 8 government actions on data centers and power in New Zealand, 3 of them in force. We have found no moratorium or restriction on new data centers in force in New Zealand.
Market snapshot
New Zealand power and policy: key facts
- Renewable share of electricity generation: 88.5% (2025). Rank 4 of 46 tracked countries, highest first.
- Grid emission factor: 0.08 kgCO2/kWh (2025). Rank 33 of 39 tracked countries, highest first.
- Latest change: TPM amendments 2026: five targeted changes to transmission pricing from 1 Apr 2027 (Electricity Authority, 23 Nov 2026).
- By type: 3 power tariff, 3 grid access, 1 regulation and 1 plan or strategy.
Power indicators for New Zealand
Latest official figure for each indicator, with earlier years where we have them.
In force now in New Zealand
Power tariff (2)
Transmission pricing methodology: a new data centre funds its own connection assets and is allocated a share of core grid costs
Under the transmission pricing methodology (TPM) a new grid-connected data centre pays for its own grid-edge connection assets and is allocated a share of core grid costs; where its connection drives new core grid investment, the TPM spreads those costs across all parties expected to benefit, so data centres that drive upgrades could raise transmission charges for others (MBIE advice to the Minister for Economic Growth, 2 Jul 2026).
Distribution connection pricing Code amendment: cost allocation, pioneer schemes and charge reconciliation from 1 Apr 2026
Electricity Authority decision of 18 Jul 2025. From 1 April 2026 distributors must apply connection enhancement cost allocation, a pioneer scheme (the applicant that funds a network extension gets rebates from later users) and connection charge reconciliation; a fourth requirement (capacity costing) applies from 1 April 2027. Connections under large connection contracts are exempt from most of these requirements.
Plan or strategy (1)
Invest NZ Data and AI Infrastructure prospectus (1 Jul 2026): data centres a strategic investment priority
Invest New Zealand has identified data centre investment as a strategic priority for foreign investment and on 1 July 2026 released a prospectus for Data and AI Infrastructure positioning New Zealand as a secure, green location offering the fastest path to clean, scalable AI compute in Asia-Pacific.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
TPM amendments 2026: five targeted changes to transmission pricing from 1 Apr 2027
Electricity Authority decision paper of 23 Nov 2026: five targeted amendments to the Transmission Pricing Methodology, in effect from 1 April 2027. Transpower's request to extend the first simple-method period beyond 31 March 2028 was declined.
MBIE advice: set government expectations for data centres (Australian model) and require large data centres to support system resilience
MBIE advised the Minister for Economic Growth (2 Jul 2026) that there is merit in clarifying government expectations for data centres, modelled on Australia's expectations for data centre and AI infrastructure developers, and that a low-regrets approach could require large data centres to support new generation and firming, offer demand flexibility, provide grid stability services and contribute to transmission investment their demand drives. The Minister was asked whether officials should do further work; no decision published.
Dry-year risk package: LNG imports and new electricity market measures (June 2026)
The Government is acting on dry-year risk (shortage of firm supply in low-hydro periods), including LNG imports and new market measures announced in June 2026. MBIE advises that if these are in place by 2028, data centres connecting after that are unlikely to raise electricity prices for others.
Government Policy Statement on Electricity (June 2026): EA to consider requiring large customers to signal connections early
Under the updated Government Policy Statement on Electricity (June 2026) the Electricity Authority will consider developing a requirement that large customers, such as data centres, signal their intention to connect well in advance. Transpower's connection process typically takes 2-4 years from enquiry to connection.
Network Connections Code amendment 2026: new application processes for distributed generation (1 Dec 2026) and load (1 Jun 2027)
The Electricity Authority made the Electricity Industry Participation Code (Network Connections) Amendment 2026 on 9 Feb 2026 (notified 11 Feb 2026). It updates the application process for connecting distributed generation from 1 December 2026 and inserts new application processes for connecting load, including large loads such as data centres, from 1 June 2027.
Timeline of data center and power policy in New Zealand
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 23 Nov 2026 | TPM amendments 2026: five targeted changes to transmission pricing from 1 Apr 2027 | Power tariff | Announced | Electricity Authority |
| 2 Jul 2026 | MBIE advice: set government expectations for data centres (Australian model) and require large data centres to support system resilience | Regulation | Proposed | Ministry of Business, Innovation and Employment |
| 2 Jul 2026 | Dry-year risk package: LNG imports and new electricity market measures (June 2026) | Grid access | Announced | New Zealand Government (MBIE) |
| 2 Jul 2026 | Government Policy Statement on Electricity (June 2026): EA to consider requiring large customers to signal connections early | Grid access | Proposed | Minister for Energy / Electricity Authority |
| 2 Jul 2026 | Transmission pricing methodology: a new data centre funds its own connection assets and is allocated a share of core grid costs | Power tariff | In force | Electricity Authority (TPM); described by MBIE |
| 1 Jul 2026 | Invest NZ Data and AI Infrastructure prospectus (1 Jul 2026): data centres a strategic investment priority | Plan or strategy | In force | Invest New Zealand |
| 11 Feb 2026 | Network Connections Code amendment 2026: new application processes for distributed generation (1 Dec 2026) and load (1 Jun 2027) | Grid access | Announced | Electricity Authority |
| 18 Jul 2025 | Distribution connection pricing Code amendment: cost allocation, pioneer schemes and charge reconciliation from 1 Apr 2026 | Power tariff | In force | Electricity Authority |
How New Zealand compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| New Zealand | — | 88.5% (2025) | 0.08 kgCO2/kWh (2025) | 0 | 0 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in New Zealand?
We have found no moratorium or restriction on new data centers in force in New Zealand as of 26 November 2026. Proposed or announced measures, if any, are listed in the timeline.
How much of New Zealand’s electricity is renewable?
Renewables supplied 88.5% of electricity generation in New Zealand in 2025.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.