As of 21 November 2026, DC Market Insights tracks 188 data centers in Germany run by 56 operators: 131 operational, 24 under construction and 33 planned. Stated operational capacity is 933 MW, with a further 1,449 MW under construction and 2,937 MW planned. NTT DATA holds the largest share of tracked operational capacity (24%).

188Facilities tracked
56Operators
933 MWOperational (131 sites)
1,449 MWUnder construction (24 sites)
2,937 MWPlanned (33 sites)

MW = IT capacity where the source states it, otherwise total capacity. 93 of 188 facilities have a stated capacity; the others are counted as sites only.

FR2 · Equinix · Frankfurt am Main (approximate location)FR4 · Equinix · Frankfurt am Main (approximate location)FR5 · Equinix · Frankfurt am Main (approximate location)FR6 · Equinix · Frankfurt am Main (approximate location)FR7 · Equinix · Frankfurt am Main (approximate location)FR8 · Equinix · Frankfurt am Main (approximate location)FR9x · Equinix · Frankfurt am Main (approximate location)FR11x · Equinix · Frankfurt am Main (approximate location)MU1 · Equinix · Munich (approximate location)MU3 · Equinix · Munich (approximate location)MU4 · Equinix · Aschheim (approximate location)DU1 · Equinix · Düsseldorf (approximate location)HH1 · Equinix · Hamburg (approximate location)FRA1 · Digital Realty · Frankfurt am Main (approximate location)FRA2 · Digital Realty · Frankfurt am Main (approximate location)FRA4 · Digital Realty · Frankfurt am Main (approximate location)FRA5 · Digital Realty · Frankfurt am Main (approximate location)FRA6 · Digital Realty · Frankfurt am Main (approximate location)FRA7 · Digital Realty · Frankfurt am Main (approximate location)FRA8 · Digital Realty · Frankfurt am Main (approximate location)FRA9 · Digital Realty · Frankfurt am Main (approximate location)FRA10 · Digital Realty · Frankfurt am Main (approximate location)FRA11 · Digital Realty · Frankfurt am Main (approximate location)FRA12 · Digital Realty · Frankfurt am Main (approximate location)FRA13 · Digital Realty · Frankfurt am Main (approximate location)FRA14 · Digital Realty · Frankfurt am Main (approximate location)FRA15 · Digital Realty · Frankfurt am Main (approximate location)FRA16 · Digital Realty · Frankfurt am Main (approximate location)FRA17 · Digital Realty · Frankfurt am Main (approximate location)FRA18 · Digital Realty · Frankfurt am Main (approximate location)FRA20 · Digital Realty · Frankfurt am Main (approximate location)FRA27 · Digital Realty · Frankfurt am Main (approximate location)FRA29 · Digital Realty · Frankfurt am Main (approximate location)FRA30 · Digital Realty · Frankfurt am Main (approximate location)FRA31 · Digital Realty · Frankfurt am Main (approximate location)FRA32 · Digital Realty · Frankfurt am Main (approximate location)FRA34 · Digital Realty · Hattersheim (approximate location)DUS1 · Digital Realty · Düsseldorf (approximate location)DUS2 · Digital Realty · Düsseldorf (approximate location)DUS3 · Digital Realty · Düsseldorf (approximate location)Frankfurt 1 · NTT DATA · Frankfurt am Main (approximate location)Frankfurt 2 · NTT DATA · Frankfurt am Main (approximate location)Frankfurt 3 · NTT DATA · Rüsselsheim am Main (approximate location)Frankfurt 4 · NTT DATA · Hattersheim (approximate location)Berlin 1 · NTT DATA · Berlin (approximate location)Berlin 2 · NTT DATA · Berlin (approximate location)Munich 1 · NTT DATA · Kirchheim bei München (approximate location)Munich 2 · NTT DATA · Unterschleißheim (approximate location)Hamburg 1 · NTT DATA · Hamburg (approximate location)Frankfurt 5 · NTT DATA · Hattersheim (approximate location)Frankfurt 6 · NTT DATA · Nierstein (approximate location)Berlin Brieselang campus (third Berlin campus) · NTT DATA · Brieselang (approximate location)FRA1 · CyrusOne · Frankfurt am Main (approximate location)FRA2 · CyrusOne · Frankfurt am Main (approximate location)FRA3 · CyrusOne · Frankfurt am Main (approximate location)FRA4 · CyrusOne · Frankfurt am Main (approximate location)FRA6 · CyrusOne · Frankfurt am Main (approximate location)Berlin I (BER1) · Vantage Data Centers · Ludwigsfelde (approximate location)Berlin II (BER2) · Vantage Data Centers · Mittenwalde (approximate location)Frankfurt I (FRA1) · Vantage Data Centers · Offenbach am Main (approximate location)FRA01 · maincubes · Offenbach am Main (approximate location)FRA02 · maincubes · Schwalbach am Taunus (approximate location)FRA03 · maincubes · Schwalbach am Taunus (approximate location)FRA04 · maincubes · Dietzenbach (approximate location)Frankfurt City · Colt DCS · Frankfurt am Main (approximate location)Frankfurt West · Colt DCS · Frankfurt am Main (approximate location)Frankfurt 3 · Colt DCS · Frankfurt am Main (approximate location)Frankfurt 4 · Colt DCS · Wiesbaden (approximate location)Frankfurt 5 · Colt DCS · Wiesbaden (approximate location)FRA-1 · Iron Mountain · Frankfurt am Main (approximate location)FRA-2 · Iron Mountain · Frankfurt am Main (approximate location)FRA01 · STACK Infrastructure · Liederbach (approximate location)Yondr Frankfurt (Bischofsheim) · Yondr · Bischofsheim (approximate location)FRA-Mainz · Green Mountain / KMW · Mainz (approximate location)Frankfurt North · Global Switch · Frankfurt am Main (approximate location)Frankfurt South · Global Switch · Frankfurt am Main (approximate location)EdgeConneX Heusenstamm campus · EdgeConneX · Heusenstamm (approximate location) · Cooling: Chilled water, dry coolersMainova WebHouse Seckbach campus (MWH01) · Mainova WebHouse · Frankfurt am Main (approximate location)Werkhaus Data Center (Kruppstraße) · firstcolo · Frankfurt am Main (approximate location)AOC Data Center (Hanauer Landstraße) · firstcolo · Frankfurt am Main (approximate location)Rosbach Data Center (FRA7) · firstcolo · Rosbach vor der Höhe (approximate location)Google Hanau data center · Google · Hanau am Main (approximate location) · Cooling: Air or free cooling · Owned (self-build): Google-operated data centre in HanauGoogle Dietzenbach data center · Google · Dietzenbach (approximate location) · Owned (self-build): listed on Google's own data center locations mapTelehouse Frankfurt Building M · Telehouse · Frankfurt am Main (approximate location)Telehouse Frankfurt Building N · Telehouse · Frankfurt am Main (approximate location)FRA1 · noris network · Schwalbach am Taunus (approximate location)Frankfurt 2 · NorthC · Neu-Isenburg (approximate location)Frankfurt 3 · NorthC · Frankfurt am Main (approximate location)BER001 · AtlasEdge · Berlin (approximate location)HAM001 · AtlasEdge · Hamburg (approximate location)HAM002 · AtlasEdge · Ahrensburg (approximate location)DUS001 · AtlasEdge · Hilden (approximate location)LEV001 · AtlasEdge · Leverkusen (approximate location)LEV002 · AtlasEdge · Leverkusen (approximate location)CGN3 · plusserver · Köln (approximate location)DUS6 · plusserver · Düsseldorf (approximate location)HAM5 · plusserver · Hamburg (approximate location)HAM6 · plusserver · Hamburg (approximate location)HH2 · Portus Data Centers · Hamburg (approximate location)HH3 · Portus Data Centers · Hamburg (approximate location)HH4 · Portus Data Centers · Hamburg (approximate location)Rechenzentrum Victoria Park · akquinet · Hamburg (approximate location)Hamburg Alsterdorf · akquinet · Hamburg (approximate location)Norderstedt · akquinet · Norderstedt (approximate location)Itzehoe · akquinet · Itzehoe (approximate location)Rechenzentrum der Stadtwerke Norderstedt · wilhelm.tel · Norderstedt (approximate location)Data Center Biere · T-Systems (Deutsche Telekom) · Biere (approximate location)T-Systems data center Magdeburg · T-Systems (Deutsche Telekom) · Magdeburg (approximate location)Berlin 1 · NorthC · Berlin (approximate location)Berlin 2 · NorthC · Berlin (approximate location)Düsseldorf · NorthC · Düsseldorf (approximate location)Hamburg · NorthC · Hamburg (approximate location)Marienpark Campus · Virtus Data Centres · Berlin (approximate location)Wustermark Campus · Virtus Data Centres · Wustermark (approximate location)BER02 · maincubes · Nauen (approximate location)BER01 · maincubes · Berlin (approximate location)BER01 · Penta Infra · Berlin (approximate location)Penta HAM01 · Penta Infra · Hamburg (approximate location)Data Center Hamburg 1 (HAM1) · ITENOS · Hamburg (approximate location)GlobalConnect Hamburg · GlobalConnect · Hamburg (approximate location)DataR · dataR · Rellingen (approximate location)YEXIO Data Center FunkenbergQuartier · YEXIO (HOCHTIEF) · Herne (approximate location)Dummerstorf · Schwarz Digits (STACKIT) · Dummerstorf (approximate location)AWS European Sovereign Cloud – Baruth/Mark · Amazon Web Services · Baruth/Mark (approximate location)Bergheim · Microsoft · Bergheim (approximate location) · Owned: Microsoft self-build (first data center of Microsoft's NRW cluster)Bedburg · Microsoft · Bedburg (approximate location)Elsdorf · Microsoft · Elsdorf (approximate location)Grevenbroich · Microsoft · Grevenbroich (approximate location)Schladen-Werla Datacenter · Gdd Green Datacenter Development · Schladen (approximate location)Hohenhameln (Mehrum) · Telis Energie Deutschland · Hohenhameln (approximate location)Rechenzentrum München Ost · noris network · Aschheim (approximate location)Rechenzentrum Nürnberg Süd · noris network · Nuremberg (approximate location)Rechenzentrum Nürnberg Süd – third construction phase (BayLfSt) · noris network · Nuremberg (approximate location)Datacenter-Park Nuremberg · Hetzner · Nuremberg (approximate location)Datacenter-Park Falkenstein · Hetzner · Falkenstein (approximate location)IONOS Rechenzentrum Karlsruhe · IONOS · Karlsruhe (approximate location)IPC 1 · TelemaxX · Karlsruhe (approximate location)IPC 3 · TelemaxX · Karlsruhe (approximate location)IPC 4 · TelemaxX · Karlsruhe (approximate location)IPC 5 · TelemaxX · Stutensee (approximate location)POP TPK (former IPC 2) · TelemaxX · Karlsruhe (approximate location)Munich 1 · NorthC · Munich (approximate location)Munich 2 · NorthC · Munich (approximate location)Nuremberg · NorthC · Nuremberg (approximate location)MUC01 · EdgeConneX · Munich (approximate location)Datacenter Leipzig 2 · envia TEL · Taucha (approximate location)STR001 · AtlasEdge · Böblingen (approximate location)Industrial AI Cloud (Tucherpark) · Deutsche Telekom · Munich (approximate location)Munich 1 (MUC1) · Portus Data Centers · Kirchheim bei München (approximate location)Munich 2 (MUC2) · Portus Data Centers · Kirchheim bei München (approximate location)DCMUC1 · Data Center Partners · Unterschleißheim (approximate location)Penta Infra LEJ01 · Penta Infra · Leipzig (approximate location)Penta Infra LEJ02 · Penta Infra · Leipzig (approximate location)SWU data center Ulm Science Park · Stadtwerke Ulm/Neu-Ulm (SWU) · Ulm (approximate location)IBM Quantum Data Center Ehningen · IBM · Ehningen (approximate location)University IT Mannheim (UNIT) · University of Mannheim · Mannheim (approximate location)Leibniz Supercomputing Centre (LRZ) · Leibniz Supercomputing Centre (LRZ) · Garching (approximate location)Rechenzentrum Mitteldeutschland · NT Neue Technologie AG · Erfurt (approximate location)Rechenzentrum Katzenfeld · Revikon · Gießen (approximate location)Rechenzentrum Zschortau-Rackwitz · AM:PM Grund · Rackwitz (approximate location)Frankfurt 4 · NorthC · Maintal (approximate location)DUS2 · ITENOS · Hilden (approximate location)DCH Rechenzentrum Hofheim-Marxheim · DCH GmbH · Hofheim am Taunus (approximate location)Berlin 1 and 2 · Colt DCS · Berlin (10 km east) (approximate location)Frankfurt Data Center · Cogent · Frankfurt am Main (approximate location)YEXIO Rechenzentrum Bad Lippspringe · YEXIO (HOCHTIEF) · Bad Lippspringe (approximate location)EnBW Neckarwestheim data center · EnBW · Neckarwestheim (approximate location)IGNIS Wenzenbach (Abbachhof) data center · IGNIS · Wenzenbach (approximate location)YEXIO Rechenzentrum Dorfen · YEXIO (HOCHTIEF) · Dorfen (approximate location)YEXIO Rechenzentrum Heiligenhaus · YEXIO (HOCHTIEF) · Heiligenhaus (approximate location)Rechenzentrum Hof · noris network · Hof (approximate location)Rechenzentrum München Zentrum · noris network · Munich (approximate location)Rechenzentren Nürnberg Zentrum (three sites) · noris network · Nuremberg (approximate location)FRA33 · Digital Realty · Hattersheim am Main (exact location)FRA5 · CyrusOne · Hanau am Main (exact location)FRA7 · CyrusOne · Frankfurt am Main (exact location)Frankfurt II (FRA2) · Vantage Data Centers · Raunheim (exact location)Data4 Hanau campus · Data4 · Hanau am Main (exact location)FRA Campus Offenbach · CloudHQ · Offenbach am Main (exact location)CloudHQ Frankfurt-Höchst campus · CloudHQ · Frankfurt am Main (exact location)FRA7 Campus Offenbach · CloudHQ · Offenbach am Main (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Germany data center market: key facts

  • Capacity under construction or planned (4,386 MW) is 4.7 times the operational base of 933 MW.
  • The three largest operators by operational capacity, NTT DATA, Vantage Data Centers and CloudHQ, hold 57% of tracked operational MW.
  • NTT DATA has the largest development pipeline in Germany: 658 MW under construction or planned.
  • The largest operational facility we track is FRA Campus Offenbach (CloudHQ, Offenbach am Main) at 112 MW.
  • The largest project in the pipeline is Hohenhameln (Mehrum) by Telis Energie Deutschland (500 MW, planned).
  • Frankfurt is the largest cluster: 86 of 188 facilities and 45% of tracked capacity.
  • By type, the tracker lists 141 colocation, 33 hyperscale and 6 other facilities.
  • 6 facilities publish a PUE figure; the lowest is 1.05 at Leibniz Supercomputing Centre (LRZ) (Leibniz Supercomputing Centre (LRZ)) and the median is 1.30.
  • 93 of 188 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational933 MW
Under construction1,449 MW
Planned2,937 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
6'17'18'19'20'21'22117'2319'244'2518'264'27

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in Germany by tracked capacity, MW
NTT DATA881 MW
CloudHQ519 MW
CyrusOne279 MW
maincubes265 MW

OperationalUnder construction or planned

Capacity by market in Germany, MW
Frankfurt2,407 MW
Other Germany1,154 MW
Berlin1,046 MW
Leipzig500 MW
Gießen65 MW
Munich43.1 MW
Hamburg35.4 MW
Düsseldorf32.5 MW
Frankfurt am Main11 MW
Nuremberg8 MW

OperationalUnder construction or planned

Facilities by type
Colocation141
Hyperscale33
Other6
Edge5
Enterprise3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Germany data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 8 October 2026. Government sources are linked; the full source list comes with the Excel data.

Germany's National Data Centre Strategy, adopted by the federal cabinet on 18 March 2026, sets a goal of at least doubling data centre capacity (IT connected load, vs 2025) by 2030. The same document notes that under § 11(5) of the Energy Efficiency Act operators must cover their electricity use 50% from renewables from 1 January 2024 and 100% (on a balance-sheet basis) from 1 January 2027, and states that grid connection capacity is scarce, especially in existing hotspots, with long connection times. Bundesregierung / BMDS – Nationale Rechenzentrumsstrategie

Policy and incentives

The National Data Centre Strategy, published after the federal cabinet decision of 18 March 2026, sets the target of at least doubling data centre capacity in Germany by 2030, measured as IT connected load (MW) against 2025. Bundesregierung / BMDS – Nationale Rechenzentrumsstrategie

Under § 11(5) of the Energy Efficiency Act (EnEfG), as summarised in the federal data centre strategy, data centre operators must cover 50% of their electricity use from renewable sources from 1 January 2024 and 100% (on a balance-sheet basis) from 1 January 2027. Bundesregierung / BMDS – Nationale Rechenzentrumsstrategie

The federal government's bill to accelerate implementation of the Energy Efficiency Directive (Bundestag Drucksache 21/8027, 16 September 2026) would amend EnEfG § 11 so that existing data centres must reach a power usage effectiveness (PUE) of 1.6 or lower from 1 July 2027 and 1.4 or lower from 1 July 2030. This is a proposal, not enacted law. Deutscher Bundestag – Drucksache 21/8027 (Gesetzentwurf der Bundesregierung)

At its first reading in the Bundestag on 24 September 2026, the government bill (Drucksache 21/8027) was described as relaxing minimum efficiency requirements for data centres: new data centres would get four instead of two years to meet efficiency requirements, and the 100% renewable electricity requirement would apply from 1 January 2030 instead of 2027. The bill was referred to the Committee on Economic Affairs and Energy. Deutscher Bundestag – Textarchiv

Under § 13(1) EnEfG, operators of data centres with a non-redundant rated connection capacity of 300 kW or more must report data to the federal data centre register (Rechenzentrumsregister), with an annual deadline of 31 March for the previous calendar year. Bundesministerium für Wirtschaft und Energie – Rechenzentrumsregister

Power and grid

On 29 July 2026 the federal cabinet adopted the draft 'Netzanschlusspaket' presented by the Federal Minister for Economic Affairs and Energy; it would move grid connection allocation from purely 'first come, first served' towards 'first ready, first served' and open the way to prioritising grid connections. The ministry names battery storage, data centres and industry among those seeking connections. Bundesministerium für Wirtschaft und Energie – Entwurf Netzanschlusspaket

In a joint position paper dated 5 February 2026, Germany's four transmission system operators stated their intention to introduce a maturity-based allocation procedure (Reifegradverfahren) for transmission grid connections from 1 April 2026, and proposed capacity quotas so that industry, power plants and data centres are adequately considered.

The federal data centre strategy (March 2026) states that grid connection capacity is scarce, particularly in existing hotspots, with long connection times, and that the four transmission system operators alone hold connection requests in the triple-digit gigawatt range for battery storage projects, which compete with data centres for capacity. Bundesregierung / BMDS – Nationale Rechenzentrumsstrategie

In its March 2026 data centre strategy, the federal government states that, as agreed in the coalition agreement, it is pressing the European Commission for data centres to be included in electricity price compensation (Strompreiskompensation), subject to EU state aid rules. Bundesregierung / BMDS – Nationale Rechenzentrumsstrategie

Land, zoning and sites

On 9 June 2022 the Frankfurt am Main city council (Stadtverordnetenversammlung) approved proposal M 44, the 'Rechenzentrenkonzept – Aktualisierung des Gewerbeflächenentwicklungsprogramms' (data centre concept updating the city's commercial land development programme). Stadtplanungsamt Frankfurt am Main

According to the Hessian state government, Frankfurt's Rechenzentrenkonzept divides the city's commercial areas into suitable areas, areas of restricted suitability and exclusion areas for non-captive (multi-tenant) data centres. Hessischer Landtag, Drucksache 21/1061 (answer of the Hessian state government)

The Hessian state government states that projects count as spatially significant for regional planning when they exceed the regional plans' mapping threshold of 3 to 5 hectares, and that this is the exception for data centres. Hessischer Landtag, Drucksache 21/1061 (answer of the Hessian state government)

The BMDS National Data Centre Strategy states that 20.1% of data centres in Germany are located in rural areas and 1.4% in structurally weak, very rural areas. BMDS – Nationale Rechenzentrumsstrategie

The BMDS National Data Centre Strategy states that, from the investors' perspective, suitable sites are relatively scarce, particularly in current hotspots. BMDS – Nationale Rechenzentrumsstrategie

Demand and connectivity

The BMDS National Data Centre Strategy names Germany's central location in Europe and its connectivity, including the DE-CIX internet exchange, as location factors. BMDS – Nationale Rechenzentrumsstrategie

According to the Bundesnetzagentur, gigabit-capable connections across all technologies were available to 76.5% of households in Germany in mid-2024. Fibre availability nationwide rose by around 3.5 percentage points in the first half of 2024 to 36.8%. Bundesnetzagentur – press release

Sustainability, water and climate

According to the Bundesnetzagentur (SMARD), renewable energy sources accounted for 257.5 TWh, or 58.8%, of Germany's net electricity generation in 2025. Bundesnetzagentur – SMARD press release

The BMDS National Data Centre Strategy states that water availability and economical water use for cooling are aspects to be considered for sustainable data centres. BMDS – Nationale Rechenzentrumsstrategie

Germany's target is net greenhouse gas neutrality by 2045, with emissions to be cut by at least 65% by 2030 and at least 88% by 2040 compared with 1990, according to the Umweltbundesamt. Umweltbundesamt – Treibhausgasminderungsziele Deutschlands

Operators in Germany

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Digital Realty2840 MW16 MW4.3%
Equinix147.8 MW—0.8%
NTT DATA12223 MW658 MW24%
NorthC1115.4 MW23.5 MW1.7%
AtlasEdge835.2 MW8.8 MW3.8%
CyrusOne760 MW219 MW6.4%
noris network7—30 MW—
maincubes639 MW226 MW4.2%
Colt DCS626.2 MW86.4 MW2.8%
Portus Data Centers5—18.3 MW—
TelemaxX5———
Vantage Data Centers4200 MW—21%
CloudHQ4112 MW407 MW12%
Penta Infra49.9 MW—1.1%
YEXIO (HOCHTIEF)42 MW4 MW0.2%
akquinet4———
plusserver4———
Microsoft4———
firstcolo3—24 MW—
Iron Mountain238 MW—4.1%
Global Switch222 MW—2.4%
ITENOS220 MW—2.1%
Telehouse29.9 MW—1.1%
EdgeConneX22.4 MW—0.3%
Schwarz Digits (STACKIT)2—440 MW—
Hetzner2———
Google2———
Virtus Data Centres2—262 MW—
Amazon Web Services2—300 MW—
T-Systems (Deutsche Telekom)2———
Yondr140 MW—4.3%
Mainova WebHouse130 MW—3.2%
IONOS1———
Revikon1—65 MW—
dataR1—5 MW—
IBM1———
Data Center Partners1—17 MW—
Green Mountain / KMW1—80 MW—
wilhelm.tel1———
GlobalConnect1———

Largest data center projects in Germany

Under construction and planned facilities with a stated capacity, largest first. 1,449 MW under construction and 2,937 MW planned in total.

ProjectLocationStatusTypeCapacity
Hohenhameln (Mehrum)Telis Energie Deutschland Hohenhameln Planned Other 500 MW
Rechenzentrum Zschortau-RackwitzAM:PM Grund Rackwitz Planned Hyperscale 500 MW
Frankfurt 6NTT DATA Nierstein Planned Colocation 482 MW
DummerstorfSchwarz Digits (STACKIT) Dummerstorf Planned Hyperscale 240 MW
CloudHQ Frankfurt-Höchst campusCloudHQ Frankfurt am Main Planned Hyperscale 224 MW
Wustermark CampusVirtus Data Centres Wustermark Under construction Colocation 204 MW
AWS European Sovereign Cloud – MassenAmazon Web Services Massen-Niederlausitz Under construction Hyperscale 200 MW
Lübbenau – Home of STACKITSchwarz Digits (STACKIT) Lübbenau Under construction Hyperscale 200 MW
Schladen-Werla DatacenterGdd Green Datacenter Development Schladen Planned Other 200 MW
BER02maincubes Nauen Under construction Colocation 186 MW
Data4 Hanau campusData4 Hanau am Main Under construction Hyperscale 180 MW
AWS European Sovereign Cloud – Baruth/MarkAmazon Web Services Baruth/Mark Planned Hyperscale 100 MW

How Germany compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom197541,025 MW7,741 MW
Germany18856933 MW4,386 MW
France5510322 MW1,413 MW
Sweden4117172 MW1,510 MW
Finland3616230 MW1,430 MW
Ireland391553 MW1,278 MW
Denmark301454.6 MW844 MW
Italy107170 MW693 MW
Russia11121466 MW375 MW
Netherlands10833217 MW414 MW
Norway22—350 MW
Spain211279.4 MW175 MW

Data center deals in Germany

Our Deal Tracker lists 11 deals in Germany since January 2026, with $10.12B in disclosed value.

  • Unnamed European infrastructure investor → 30MW data center development site, Unterschleißheim, Greater Munich Land / campus · 30 MW
  • Schwarz Group → 240MW data center (expandable to 1GW by 2045), industrial park near Rostock Land / campus $6.52B · 240 MW
  • Data Center Capital (DCC) → Eight Edge colocation data centers in Augsburg, Konstanz, Munich, Nuremberg and Stuttgart Land / campus $582.3M · 46 MW

All Germany deals in the Deal Tracker

Facilities

188 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Munich 2NTT DATA Unterschleißheim Operational 14 MW IT — Operator / official
HH4Portus Data Centers Hamburg Planned 12.8 MW IT — Operator / official
Frankfurt NorthGlobal Switch Frankfurt am Main Operational 12 MW — Operator / official
DUS001AtlasEdge Hilden Operational 11.2 MW IT — Operator / official
HAM002AtlasEdge
History
  1. Under construction
  2. Operational
Ahrensburg Operational 11.2 MW IT 2024 Trade press
STR001AtlasEdge Böblingen Operational 11.2 MW IT — Operator / official
FRA-2Iron Mountain Frankfurt am Main Operational 11 MW — Operator / official
FRA4CyrusOne Frankfurt am Main Operational 11 MW IT — Operator / official
Frankfurt SouthGlobal Switch Frankfurt am Main Operational 10 MW — Operator / official
BER01maincubes Berlin Operational 9 MW IT — Operator / official
FRA1CyrusOne Frankfurt am Main Operational 9 MW IT — Operator / official
Frankfurt 4NorthC Maintal Planned 8.5 MW — Operator / official
FRA02maincubes Schwalbach am Taunus Operational 8 MW IT 2024 Operator / official
NurembergNorthC Nuremberg Operational 8 MW total — Operator / official
FR13Equinix Frankfurt Operational 7.8 MW IT — Trade press
Berlin 1NorthC Berlin Planned 7 MW — Operator / official
FRA01maincubes Offenbach am Main Operational 6 MW IT 2017 Operator / official
Munich 2 (MUC2)Portus Data Centers
History
  1. Under construction
  2. Under construction
Kirchheim bei München Under construction 5.5 MW IT — Operator / official
Telehouse Frankfurt Building NTelehouse Frankfurt am Main Operational 5.4 MW — Trade press
DataRdataR
History
  1. Under construction
  2. Under construction
Rellingen Under construction 5 MW IT — Operator / official
Frankfurt 1 (FRA01)NorthC Frankfurt Under construction 5 MW IT — Trade press
Telehouse Frankfurt Building MTelehouse
History
  1. Operational
  2. Operational
Frankfurt am Main Operational 4.5 MW 2023 Operator / official
LEV002AtlasEdge Leverkusen Under construction 4.4 MW IT — Operator / official
LEV002AtlasEdge Leverkusen Planned 4.4 MW — Operator / official
Penta HAM01Penta Infra
History
  1. Operational
  2. Operational
Hamburg Operational 4.4 MW IT 2025 Operator / official
Frankfurt 2NorthC Neu-Isenburg Planned 3 MW — Operator / official
Penta Infra LEJ01Penta Infra Leipzig Operational 2.8 MW IT — Operator / official
BER01Penta Infra Berlin Operational 2.7 MW IT — Operator / official
MUC01EdgeConneX Munich Operational 2.4 MW total — Operator / official
Munich 1NorthC Munich Operational 2 MW total — Operator / official
YEXIO Data Center FunkenbergQuartierYEXIO (HOCHTIEF)
History
  1. Under construction
  2. Under construction
Herne Under construction 2 MW IT 2027 Operator / official
YEXIO Rechenzentrum Bad LippspringeYEXIO (HOCHTIEF)
History
  1. Under construction
  2. Operational
Bad Lippspringe Operational 2 MW IT 2026 Operator / official
YEXIO Rechenzentrum DorfenYEXIO (HOCHTIEF)
History
  1. Planned
  2. Under construction
Dorfen Under construction 2 MW IT 2027 Operator / official
LEV001AtlasEdge Leverkusen Operational 1.6 MW IT — Operator / official
DüsseldorfNorthC Düsseldorf Operational 1.3 MW — Operator / official
Frankfurt CityColt DCS Frankfurt am Main Operational 1.2 MW IT — Operator / official
HamburgNorthC Hamburg Operational 1.2 MW — Operator / official
Munich 2NorthC Munich Operational 1.2 MW total — Operator / official
Frankfurt 2NTT DATA Frankfurt am Main Operational 1.1 MW IT — Operator / official
Munich 1NTT DATA Kirchheim bei München Operational 1 MW IT — Operator / official
Berlin 2NorthC Berlin Operational 0.9 MW — Operator / official
Frankfurt 3NorthC Frankfurt am Main Operational 0.9 MW — Trade press
Hamburg 1NTT DATA Hamburg Operational 0.8 MW IT — Operator / official
AOC Data Center (Hanauer Landstraße)firstcolo Frankfurt am Main Operational — — Operator / official
BedburgMicrosoft Bedburg Planned — — Operator / official
BER001AtlasEdge Berlin Operational — — Operator / official
BergheimMicrosoft Owned: Microsoft self-build (first data center of Microsoft's NRW cluster) Bergheim Under construction — — Operator / official
CGN3plusserver Köln Operational — — Operator / official
Data Center BiereT-Systems (Deutsche Telekom)
History
  1. Operational
  2. Operational
Biere Operational — 2014 Operator / official
Data Center Hamburg 1 (HAM1)ITENOS Hamburg Operational — — Operator / official

Get the data

Every data center in Germany, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

Data Centers in Germany: Capacity Sheet

188 facilities

Every tracked data center in Germany with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Germany

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Germany

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Germany?

DC Market Insights tracks 188 data centers in Germany as of November 2026: 131 operational, 24 under construction and 33 planned, run by 56 operators. The count grows as we verify more sites.

What is the data center capacity of Germany?

Tracked operational capacity in Germany is 933 MW, with 1,449 MW under construction and 2,937 MW planned. These totals use the capacity each source states (IT load where given) and cover 93 of 188 tracked facilities.

Which companies operate the most data center capacity in Germany?

By tracked operational capacity, the largest operators in Germany are NTT DATA (223 MW), Vantage Data Centers (200 MW) and CloudHQ (112 MW).

Where are the data centers in Germany located?

The largest clusters by tracked capacity are Frankfurt (86 facilities), Other Germany (24 facilities) and Berlin (16 facilities). The map above shows every site.

Which new data centers are being built in Germany?

We track 1,449 MW under construction and 2,937 MW planned. The largest projects are Hohenhameln (Mehrum) by Telis Energie Deutschland (500 MW), Rechenzentrum Zschortau-Rackwitz by AM:PM Grund (500 MW) and Frankfurt 6 by NTT DATA (482 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Germany have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Germany capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy