In short

As of 26 November 2026, DC Market Insights tracks 15 government actions on data centers and power in Costa Rica, 11 of them in force. Costa Rica has 1 restriction on new data centers in force: Ley 7200 as amended by Ley 7508: caps on private (parallel) generation. 1 incentive scheme applies: Free Trade Zone regime (Ley 7210): services companies in strategic sectors.

15Actions tracked
11In force
—Industrial power price
98.6%Renewable share of generation

Market snapshot

Costa Rica power and policy: key facts

  • Renewable share of electricity generation: 98.6% (2025). Rank 2 of 48 tracked countries, highest first.
  • Grid emission factor: 0.04 kgCO2/kWh (2025). Rank 37 of 41 tracked countries, highest first.
  • Latest change: New electricity-sector reform bill designed to pass with 29 votes (Presidencia de la República, 21 Oct 2026).
  • By type: 5 power tariff, 3 regulation, 2 plan or strategy and 1 other.

Power indicators for Costa Rica

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 98.6% 2025 · share of generation incl. exports, ICE DOCSE data as reported; 97.3% of domestic demand
Grid emission factor 0.04 kgCO2/kWh 2025 · IMN factor for electricity consumption, kgCO2e/kWh (2024: 0.127, drought year) IMN – Factores de emisión de GEI, 16a edición 2026

In force now in Costa Rica

Restriction (1)

  • RestrictionIn force

    Ley 7200 as amended by Ley 7508: caps on private (parallel) generation

    ICE may declare private limited-capacity plants eligible only while parallel generation stays at or below 15% of the capacity of all plants in the national grid, with plants capped at 20,000 kW. Ley 7508 (1995) lets ICE buy a further 15% from private plants by competitive tender in blocks up to 50,000 kW. Large new loads cannot simply contract new private generation.

    15 % of national capacity plus a further 15% under the Ley 7508 competitive-purchase chapter

    Asamblea Legislativa / ICE · ARESEP – text of Ley 7200

Power tariff (4)

  • Power tariffIn force

    ICE T-UD tariff for direct high-voltage users of ICE generation (maximum prices)

    T-UD covers energy and capacity supplied at high voltage to direct customers of ICE's generation service (and medium-voltage green-hydrogen users under Decree 43366-MINAE). It sets maximum prices; lower prices may be billed. Metering is at ICE transmission-substation high-voltage busbars; transmission charges and sales tax are extra.

    ARESEP · Effective 1 Jan 2026 · Ends 31 Dec 2026 · ARESEP RE-0072-IE-2025, La Gaceta Alcance 161 (16 Dec 2025)

  • Power tariffIn force

    ICE T-MT medium-voltage tariff (2026)

    T-MT is an optional tariff for medium-voltage customers of any use, under a contract of at least one calendar year. Prices are a band between minimum and maximum. ICE 2026 maximum energy charges: peak 51.82, valley 19.25, night 11.85 CRC/kWh; peak demand maximum 8,408.21 CRC/kW.

    51.82 CRC/kWh ICE peak-period maximum energy charge

    ARESEP · Effective 1 Jan 2026 · Ends 31 Dec 2026 · ARESEP RE-0072-IE-2025, La Gaceta Alcance 161 (16 Dec 2025)

  • Power tariffIn force

    ICE T-MTb medium-voltage 'b' tariff for very large consumers (2026)

    T-MTb is an optional medium-voltage tariff (1,000 to 34,500 V) for customers consuming at least 1,000,000 kWh and 2,000 kW per month in at least 10 of 12 months; ISO 50001 certified customers are exempt from the minimums. Prices are a band (minimum to maximum). ICE 2026 maximum energy charges: peak 94.05, valley 32.31, night 20.76 CRC/kWh; peak demand maximum 2,761.97 CRC/kW.

    20.76 CRC/kWh ICE night-period maximum energy charge; demand charged separately

    ARESEP · Effective 1 Jan 2026 · Ends 31 Dec 2026 · ARESEP RE-0072-IE-2025, La Gaceta Alcance 161 (16 Dec 2025)

  • Power tariffIn force

    ARESEP RE-0072-IE-2025: 2026 electricity tariffs (CVG adjustment) for ICE generation and all distributors

    ARESEP's Energy Directorate applied the CVG methodology (thermal fuel cost and net regional imports) for 2026, setting generation tariffs for ICE (T-CB, T-SD, T-UD) and distribution tariffs for all distributors, valid 1 Jan to 31 Dec 2026. The 2026 CVG factor for ICE distribution is -4.48% (CNFL -4.04%, JASEC -0.93%, ESPH -3.46%).

    -4.48 % ICE 2026 CVG factor, Cuadro 19

    ARESEP – Intendencia de Energía · Effective 1 Jan 2026 · Ends 31 Dec 2026 · ARESEP RE-0072-IE-2025, La Gaceta Alcance 161 (16 Dec 2025)

Incentive (1)

  • IncentiveIn force

    Free Trade Zone regime (Ley 7210): services companies in strategic sectors

    Services companies in a strategic sector can join with a new investment of at least USD 150,000 and a services eligibility index (IEES) score. Benefits include import and local-purchase tax exemptions and 0% profit tax in years 1-8 inside the Greater Metropolitan Area (0% to year 12 outside it). Electricity generation is not allowed except for self-consumption. Data centers are not named specifically.

    0 % profit tax (years 1-8, inside GMA) guide uploaded Jan 2026, day not stated

    COMEX / PROCOMER · PROCOMER Free Zone Regime Guide (EN)

Renewable energy (1)

  • Renewable energyIn force

    Ley 10086: promotion and regulation of renewable distributed energy resources

    The law sets conditions to promote and regulate access, installation, connection and control of renewable distributed energy resources, including self-consumption; ARESEP sets each circuit's penetration capacity. Published in La Gaceta Alcance 3 on 7 Jan 2022.

    Asamblea Legislativa / MINAE / ARESEP · Effective 7 Jan 2022 · La Gaceta Alcance 3 (7 Jan 2022), Ley 10086

Regulation (1)

  • RegulationIn force

    Ley 8968: personal data protection, rule on data transfers

    Article 14: public or private database controllers may transfer personal data only when the data subject has expressly and validly authorised it, without breaching the law's principles. PRODHAB supervises. No general data localization rule.

    Asamblea Legislativa / PRODHAB · SUTEL – text of Ley 8968

Plan or strategy (2)

  • Plan or strategyIn force

    National Artificial Intelligence Strategy (ENIA) 2024-2027 and action plan

    MICITT's National AI Strategy 2024-2027 has an action plan updated in August 2025, with axes on ethical, safe and responsible AI, capacity building, R&D&I and public-sector use. It sets no data center siting rules.

    MICITT · Ends 31 Dec 2027 · MICITT – Plan de Acción ENIA

  • Plan or strategyIn force

    National Decarbonization Plan 2018-2050: 100% renewable electricity by 2030

    The plan, presented in February 2019, targets a 100% renewable electricity matrix by 2030 and electricity as the main energy source for transport, residential, commercial and industrial use by 2050.

    100 % renewable electricity by 2030

    Presidencia / MINAE · Ends 31 Dec 2050

Other (1)

  • OtherIn force

    COMEX revokes free-zone status of Quantum Development Inc. (Limón AI data center project)

    COMEX withdrew free-zone status from Quantum Development Inc., linked to the Quantum AI Free Zone Campus planned in Limón, by ministerial resolution of 15 May 2026: it had not started operations by its November 2021 commitment and owed social-security contributions to the CCSS.

    COMEX

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • RegulationAnnounced

    New electricity-sector reform bill designed to pass with 29 votes

    On 21 Oct 2026 the President announced that the government is preparing a new electricity reform bill that a simple majority (29 votes) could approve, after bill 23.414 failed. No bill number yet.

    29 votes required

    Presidencia de la República

Timeline of data center and power policy in Costa Rica

DateActionTypeStatusAuthority
21 Oct 2026New electricity-sector reform bill designed to pass with 29 votesRegulationAnnouncedPresidencia de la República
19 Oct 2026Ley de Armonización del Sistema Eléctrico Nacional (expediente 23.414) rejectedRegulationWithdrawnAsamblea Legislativa
26 Aug 2026ARESEP extraordinary CVG adjustment (~8% increase, 2026-2027) archivedPower tariffWithdrawnARESEP
15 May 2026COMEX revokes free-zone status of Quantum Development Inc. (Limón AI data center project)OtherIn forceCOMEX
1 Jan 2026Free Trade Zone regime (Ley 7210): services companies in strategic sectorsIncentiveIn forceCOMEX / PROCOMER
12 Dec 2025ICE T-UD tariff for direct high-voltage users of ICE generation (maximum prices)Power tariffIn forceARESEP
12 Dec 2025ICE T-MT medium-voltage tariff (2026)Power tariffIn forceARESEP
12 Dec 2025ICE T-MTb medium-voltage 'b' tariff for very large consumers (2026)Power tariffIn forceARESEP
12 Dec 2025ARESEP RE-0072-IE-2025: 2026 electricity tariffs (CVG adjustment) for ICE generation and all distributorsPower tariffIn forceARESEP – Intendencia de Energía
11 Aug 2025National Artificial Intelligence Strategy (ENIA) 2024-2027 and action planPlan or strategyIn forceMICITT
8 May 20242024 national electricity rationing (Plan Nacional de Racionamiento)Grid accessExpiredICE / ARESEP
7 Jan 2022Ley 10086: promotion and regulation of renewable distributed energy resourcesRenewable energyIn forceAsamblea Legislativa / MINAE / ARESEP
24 Feb 2019National Decarbonization Plan 2018-2050: 100% renewable electricity by 2030Plan or strategyIn forcePresidencia / MINAE
7 Jul 2011Ley 8968: personal data protection, rule on data transfersRegulationIn forceAsamblea Legislativa / PRODHAB
9 May 1995Ley 7200 as amended by Ley 7508: caps on private (parallel) generationRestrictionIn forceAsamblea Legislativa / ICE

How Costa Rica compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Costa Rica—98.6% (2025)0.04 kgCO2/kWh (2025)11
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Israel—14.6% (2024)0.41 kgCO2/kWh (2024)10
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Morocco—27% (2024)—00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
New Zealand—88.5% (2025)0.08 kgCO2/kWh (2025)00
Norway100 USD/MWh (2026)96% (2025)0.01 kgCO2/kWh (2025)10
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Costa Rica?

Yes. 1 restriction on new data centers is in force in Costa Rica: Ley 7200 as amended by Ley 7508: caps on private (parallel) generation.

What incentives does Costa Rica offer data centers?

In force: Free Trade Zone regime (Ley 7210): services companies in strategic sectors. Each is listed with its authority and dates on this page.

How much of Costa Rica’s electricity is renewable?

Renewables supplied 98.6% of electricity generation in Costa Rica in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst