Proprietary data
Data Center Power & Policy in Costa Rica
Every government action on data centers and power in Costa Rica that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 26 November 2026, DC Market Insights tracks 15 government actions on data centers and power in Costa Rica, 11 of them in force. Costa Rica has 1 restriction on new data centers in force: Ley 7200 as amended by Ley 7508: caps on private (parallel) generation. 1 incentive scheme applies: Free Trade Zone regime (Ley 7210): services companies in strategic sectors.
Market snapshot
Costa Rica power and policy: key facts
- Renewable share of electricity generation: 98.6% (2025). Rank 2 of 48 tracked countries, highest first.
- Grid emission factor: 0.04 kgCO2/kWh (2025). Rank 37 of 41 tracked countries, highest first.
- Latest change: New electricity-sector reform bill designed to pass with 29 votes (Presidencia de la República, 21 Oct 2026).
- By type: 5 power tariff, 3 regulation, 2 plan or strategy and 1 other.
Power indicators for Costa Rica
Latest official figure for each indicator, with earlier years where we have them.
In force now in Costa Rica
Restriction (1)
Ley 7200 as amended by Ley 7508: caps on private (parallel) generation
ICE may declare private limited-capacity plants eligible only while parallel generation stays at or below 15% of the capacity of all plants in the national grid, with plants capped at 20,000 kW. Ley 7508 (1995) lets ICE buy a further 15% from private plants by competitive tender in blocks up to 50,000 kW. Large new loads cannot simply contract new private generation.
15 % of national capacity plus a further 15% under the Ley 7508 competitive-purchase chapter
Power tariff (4)
ICE T-UD tariff for direct high-voltage users of ICE generation (maximum prices)
T-UD covers energy and capacity supplied at high voltage to direct customers of ICE's generation service (and medium-voltage green-hydrogen users under Decree 43366-MINAE). It sets maximum prices; lower prices may be billed. Metering is at ICE transmission-substation high-voltage busbars; transmission charges and sales tax are extra.
ICE T-MT medium-voltage tariff (2026)
T-MT is an optional tariff for medium-voltage customers of any use, under a contract of at least one calendar year. Prices are a band between minimum and maximum. ICE 2026 maximum energy charges: peak 51.82, valley 19.25, night 11.85 CRC/kWh; peak demand maximum 8,408.21 CRC/kW.
51.82 CRC/kWh ICE peak-period maximum energy charge
ICE T-MTb medium-voltage 'b' tariff for very large consumers (2026)
T-MTb is an optional medium-voltage tariff (1,000 to 34,500 V) for customers consuming at least 1,000,000 kWh and 2,000 kW per month in at least 10 of 12 months; ISO 50001 certified customers are exempt from the minimums. Prices are a band (minimum to maximum). ICE 2026 maximum energy charges: peak 94.05, valley 32.31, night 20.76 CRC/kWh; peak demand maximum 2,761.97 CRC/kW.
20.76 CRC/kWh ICE night-period maximum energy charge; demand charged separately
ARESEP RE-0072-IE-2025: 2026 electricity tariffs (CVG adjustment) for ICE generation and all distributors
ARESEP's Energy Directorate applied the CVG methodology (thermal fuel cost and net regional imports) for 2026, setting generation tariffs for ICE (T-CB, T-SD, T-UD) and distribution tariffs for all distributors, valid 1 Jan to 31 Dec 2026. The 2026 CVG factor for ICE distribution is -4.48% (CNFL -4.04%, JASEC -0.93%, ESPH -3.46%).
-4.48 % ICE 2026 CVG factor, Cuadro 19
Incentive (1)
Free Trade Zone regime (Ley 7210): services companies in strategic sectors
Services companies in a strategic sector can join with a new investment of at least USD 150,000 and a services eligibility index (IEES) score. Benefits include import and local-purchase tax exemptions and 0% profit tax in years 1-8 inside the Greater Metropolitan Area (0% to year 12 outside it). Electricity generation is not allowed except for self-consumption. Data centers are not named specifically.
0 % profit tax (years 1-8, inside GMA) guide uploaded Jan 2026, day not stated
Renewable energy (1)
Ley 10086: promotion and regulation of renewable distributed energy resources
The law sets conditions to promote and regulate access, installation, connection and control of renewable distributed energy resources, including self-consumption; ARESEP sets each circuit's penetration capacity. Published in La Gaceta Alcance 3 on 7 Jan 2022.
Regulation (1)
Ley 8968: personal data protection, rule on data transfers
Article 14: public or private database controllers may transfer personal data only when the data subject has expressly and validly authorised it, without breaching the law's principles. PRODHAB supervises. No general data localization rule.
Plan or strategy (2)
National Artificial Intelligence Strategy (ENIA) 2024-2027 and action plan
MICITT's National AI Strategy 2024-2027 has an action plan updated in August 2025, with axes on ethical, safe and responsible AI, capacity building, R&D&I and public-sector use. It sets no data center siting rules.
National Decarbonization Plan 2018-2050: 100% renewable electricity by 2030
The plan, presented in February 2019, targets a 100% renewable electricity matrix by 2030 and electricity as the main energy source for transport, residential, commercial and industrial use by 2050.
100 % renewable electricity by 2030
Other (1)
COMEX revokes free-zone status of Quantum Development Inc. (Limón AI data center project)
COMEX withdrew free-zone status from Quantum Development Inc., linked to the Quantum AI Free Zone Campus planned in Limón, by ministerial resolution of 15 May 2026: it had not started operations by its November 2021 commitment and owed social-security contributions to the CCSS.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
New electricity-sector reform bill designed to pass with 29 votes
On 21 Oct 2026 the President announced that the government is preparing a new electricity reform bill that a simple majority (29 votes) could approve, after bill 23.414 failed. No bill number yet.
29 votes required
Timeline of data center and power policy in Costa Rica
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 21 Oct 2026 | New electricity-sector reform bill designed to pass with 29 votes | Regulation | Announced | Presidencia de la República |
| 19 Oct 2026 | Ley de Armonización del Sistema Eléctrico Nacional (expediente 23.414) rejected | Regulation | Withdrawn | Asamblea Legislativa |
| 26 Aug 2026 | ARESEP extraordinary CVG adjustment (~8% increase, 2026-2027) archived | Power tariff | Withdrawn | ARESEP |
| 15 May 2026 | COMEX revokes free-zone status of Quantum Development Inc. (Limón AI data center project) | Other | In force | COMEX |
| 1 Jan 2026 | Free Trade Zone regime (Ley 7210): services companies in strategic sectors | Incentive | In force | COMEX / PROCOMER |
| 12 Dec 2025 | ICE T-UD tariff for direct high-voltage users of ICE generation (maximum prices) | Power tariff | In force | ARESEP |
| 12 Dec 2025 | ICE T-MT medium-voltage tariff (2026) | Power tariff | In force | ARESEP |
| 12 Dec 2025 | ICE T-MTb medium-voltage 'b' tariff for very large consumers (2026) | Power tariff | In force | ARESEP |
| 12 Dec 2025 | ARESEP RE-0072-IE-2025: 2026 electricity tariffs (CVG adjustment) for ICE generation and all distributors | Power tariff | In force | ARESEP – Intendencia de Energía |
| 11 Aug 2025 | National Artificial Intelligence Strategy (ENIA) 2024-2027 and action plan | Plan or strategy | In force | MICITT |
| 8 May 2024 | 2024 national electricity rationing (Plan Nacional de Racionamiento) | Grid access | Expired | ICE / ARESEP |
| 7 Jan 2022 | Ley 10086: promotion and regulation of renewable distributed energy resources | Renewable energy | In force | Asamblea Legislativa / MINAE / ARESEP |
| 24 Feb 2019 | National Decarbonization Plan 2018-2050: 100% renewable electricity by 2030 | Plan or strategy | In force | Presidencia / MINAE |
| 7 Jul 2011 | Ley 8968: personal data protection, rule on data transfers | Regulation | In force | Asamblea Legislativa / PRODHAB |
| 9 May 1995 | Ley 7200 as amended by Ley 7508: caps on private (parallel) generation | Restriction | In force | Asamblea Legislativa / ICE |
How Costa Rica compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Costa Rica | — | 98.6% (2025) | 0.04 kgCO2/kWh (2025) | 1 | 1 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Israel | — | 14.6% (2024) | 0.41 kgCO2/kWh (2024) | 1 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| New Zealand | — | 88.5% (2025) | 0.08 kgCO2/kWh (2025) | 0 | 0 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in Costa Rica?
Yes. 1 restriction on new data centers is in force in Costa Rica: Ley 7200 as amended by Ley 7508: caps on private (parallel) generation.
What incentives does Costa Rica offer data centers?
In force: Free Trade Zone regime (Ley 7210): services companies in strategic sectors. Each is listed with its authority and dates on this page.
How much of Costa Rica’s electricity is renewable?
Renewables supplied 98.6% of electricity generation in Costa Rica in 2025.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.