Proprietary data

Data Center Power & Policy in Nigeria

Every government action on data centers and power in Nigeria that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 26 November 2026, DC Market Insights tracks 14 government actions on data centers and power in Nigeria, 11 of them in force. We have found no moratorium or restriction on new data centers in force in Nigeria. 1 incentive scheme applies: Nigeria Tax Act 2025: Economic Development Incentive replaces Pioneer Status.

14Actions tracked
11In force
154 USD/MWhIndustrial power price
32.7%Renewable share of generation

Market snapshot

Nigeria power and policy: key facts

  • Industrial electricity price: 154 USD/MWh (2026). Rank 11 of 33 tracked countries, highest first.
  • Renewable share of electricity generation: 32.7% (2025). Rank 29 of 49 tracked countries, highest first.
  • Latest change: National Digital Cloud Policy 2026 (Federal Ministry of Communications, Innovation and Digital Economy, 17 Aug 2026).
  • By type: 5 regulation, 2 plan or strategy, 2 incentive and 2 grid access.

Power indicators for Nigeria

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 154 USD/MWh 2026 · Band A MD1/MD2 allowed tariff NGN 209.50/kWh (NERC May 2026 order) at NGN 1,358.19/USD, CBN average 1-27 Apr 2026 as quoted in the same order; 209.50/1358.19*1000 = 154.2 USD/MWh NERC May 2026 Supplementary Order to MYTO-2024 (EKEDP)
Renewable share of electricity generation 32.7% 2025 · hydropower share of grid-connected generation (12,804.18 of 39,208.68 GWh), grid only NERC Annual Report 2025
Installed generation capacity 13.6 GW 2025 · 13,625 MW grid-connected installed capacity; average available 5,398.33 MW (39.62%) NERC Annual Report 2025

In force now in Nigeria

Grid access (2)

  • Grid accessIn force

    Nigerian Independent System Operator (NISO) takes over system and market operation

    NERC ordered an Independent System Operator in May 2024 under the Electricity Act 2023. NISO was inaugurated on 8 April 2025 and runs system operation, scheduling, planning and wholesale market operations; TCN keeps the transmission service provider role.

    NERC / NISO · Effective 8 Apr 2025 · NERC Annual Report 2025

  • Grid accessIn force

    NERC Eligible Customer Regulations 2024 (NERC-R-001-2024)

    Large users may buy power directly from generators or traders instead of the local DisCo: 6 MWh/h point-to-point at 33 kV, 10 MWh/h on the 33 kV distribution network, 20 MWh/h at 132/330 kV, averaged over 90 days, with network access. Relevant to large data centre campuses.

    10 MWh/h 33 kV distribution threshold; 6 MWh/h point-to-point; 20 MWh/h transmission. Date from PDF metadata (seal date blank)

    Nigerian Electricity Regulatory Commission (NERC) · NERC Eligible Customer Regulations 2024

Power tariff (1)

  • Power tariffIn force

    MYTO-2024 Supplementary Orders May 2026: Band A frozen at NGN 209.50/kWh

    NERC's May 2026 Supplementary Orders (e.g. Eko DisCo ORDER/NERC/2026/042, AEDC 2026/039, IE 2026/044) keep Band A (feeders with 20+ hours supply a day) frozen at the July 2024 rate for non-MD, MD1 and MD2 customers: NGN 225.00/kWh in April 2024, 206.80 in May-June 2024, 209.50 from July 2024. Bands B-E stay at December 2022 levels; a government subsidy covers the gap to cost-reflective tariffs.

    209.5 NGN/kWh Band A MD1/MD2 allowed tariff; scanned PDF, OCR

    NERC · Effective 1 May 2026 · NERC May 2026 Supplementary Order to MYTO-2024 (EKEDP)

Incentive (1)

  • IncentiveIn force

    Nigeria Tax Act 2025: Economic Development Incentive replaces Pioneer Status

    The Nigeria Tax Act 2025 replaced the Pioneer Status Incentive with the Economic Development Incentive from 1 January 2026: qualifying companies in priority sectors (Tenth Schedule) may claim a 5% annual tax credit on qualifying capital expenditure, applied for through NIPC. Data centres are not named as a priority sector in the schedule checked; power generation, transmission and distribution are.

    5 % of qualifying capex per year

    National Assembly / NIPC · Effective 1 Jan 2026

Renewable energy (1)

  • Renewable energyIn force

    DisCo obligation to buy embedded generation: 10% of load, at least half renewable

    The May 2026 MYTO Supplementary Order obliges Eko DisCo to procure at least 51 MW of embedded generation (10% of its 2024 load allocation), of which at least 26 MW (50%) from renewable sources, to improve Band A supply.

    10 % of 2024 load allocation EKEDP: 51 MW, min 26 MW renewable

    NERC · Effective 1 May 2026 · NERC May 2026 Supplementary Order to MYTO-2024 (EKEDP)

Regulation (4)

  • RegulationIn force

    15 states have taken over regulation of their electricity markets

    Under the Electricity Act 2023, NERC had by end-2025 issued orders transferring regulatory oversight of 15 states to state electricity regulatory commissions or bureaus, so tariffs and licensing for data centre sites can differ by state. Lagos now has its own regulator (LASERC).

    15 states status at 31 Dec 2025

    NERC · NERC Annual Report 2025

  • RegulationIn force

    NDP Act 2023 General Application and Implementation Directive (GAID) 2025: cross-border data transfers

    GAID 2025 (NDPC/NDP ACT-GAID/01/2025) implements the Nigeria Data Protection Act 2023: data controllers and processors of major importance register and file audit returns; Part VIII of the Act governs cross-border transfers, with Schedule 5 used to judge adequacy until a dedicated instrument is issued. No blanket localisation of personal data.

    Nigeria Data Protection Commission (NDPC) · NDP Act GAID 2025

  • RegulationIn force

    Electricity Act 2023 s.63(2): no licence for generation up to 1 MW per site

    A person may build, own or operate a generating undertaking up to 1 MW in aggregate at a site, or distribution up to 100 kW, without a licence. Captive generation (power used by the generator and not sold) is outside the generation-licence requirement; larger self-supply plants such as data centre on-site plants take a NERC captive power permit.

    1 MW licence-free generation per site

    National Assembly; NERC

  • RegulationIn force

    Electricity Act 2023: states may set up their own electricity markets and regulators

    The Electricity Act 2023 repeals the EPSR Act 2005 and covers the whole power value chain. It keeps State laws that set up a State electricity market and a State regulator, so power supply to a data centre in a state with its own law falls under that state's commission, not NERC.

    National Assembly / President of Nigeria

Plan or strategy (2)

  • Plan or strategyIn force

    National Digital Cloud Policy 2026

    The Federal Ministry of Communications, Innovation and Digital Economy launched a national cloud policy to attract cloud and data centre investment and make Nigeria a hosting hub for West and Sub-Saharan Africa, with fiscal, regulatory and investment-facilitation measures and technology-transfer duties for incentivised investors. No general localisation of commercial data. Targets US$250m private investment in 12 months and US$750m in 24 months.

    750 USD m 24-month private investment target; 250 in 12 months

    Federal Ministry of Communications, Innovation and Digital Economy · FMCIDE press release

  • Plan or strategyIn force

    Energy Transition Plan: carbon neutrality by 2060

    Nigeria committed at COP26 to carbon neutrality by 2060 and set out an Energy Transition Plan; the official ETP site gives no numeric renewable capacity target.

    2,060 net-zero year ETP launch date not on the page

    Federal Government of Nigeria (Energy Transition Office) · Nigeria Energy Transition Plan

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • RestrictionAnnounced

    NITDA National Guideline for Cloud Computing 2026: sovereign data Level 2+ hosted in Nigeria

    Mandatory guideline for public institutions, cloud providers and data centre operators: sovereign data classified Level 2 and above must be hosted in Nigeria by default; NITDA may grant a temporary Strategic Investment Waiver to a foreign provider that commits to verifiable local data centre investment. Approved 4 Aug 2026, effective 1 Jan 2027.

    National Information Technology Development Agency (NITDA) · Effective 1 Jan 2027 · National Guideline for Cloud Computing in Nigeria 2026 (signed)

  • IncentiveAnnounced

    NITDA National Cloud Investment Strategy 2026: incentives, power and siting measures

    Incentives for data centre investors (tax incentives, faster permits, infrastructure-corridor access, power support, PPP) are routed through NIPC's Pioneer Status and One-Stop Investment Centre. The strategy commits to facilitating PPAs and hybrid power with the Ministry of Power and NERC, clarifying embedded/captive generation licensing, siting near power corridors, reviewing customs duty on data centre equipment (2027-29) and publishing an inventory of data-centre-ready sites (2026-27).

    NITDA · NITDA National Cloud Investment Strategy

  • RegulationProposed

    NERC Draft Net Billing Regulations

    NERC published draft Net Billing Regulations in 2025 and held a public consultation in Abuja in October 2025; customers with on-site generation such as solar would be able to export surplus power to DisCos for credit.

    NERC · NERC Annual Report 2025

Timeline of data center and power policy in Nigeria

DateActionTypeStatusAuthority
17 Aug 2026National Digital Cloud Policy 2026Plan or strategyIn forceFederal Ministry of Communications, Innovation and Digital Economy
4 Aug 2026NITDA National Guideline for Cloud Computing 2026: sovereign data Level 2+ hosted in NigeriaRestrictionAnnouncedNational Information Technology Development Agency (NITDA)
1 Aug 2026NITDA National Cloud Investment Strategy 2026: incentives, power and siting measuresIncentiveAnnouncedNITDA
30 Apr 2026DisCo obligation to buy embedded generation: 10% of load, at least half renewableRenewable energyIn forceNERC
30 Apr 2026MYTO-2024 Supplementary Orders May 2026: Band A frozen at NGN 209.50/kWhPower tariffIn forceNERC
31 Dec 202515 states have taken over regulation of their electricity marketsRegulationIn forceNERC
1 Oct 2025NERC Draft Net Billing RegulationsRegulationProposedNERC
26 Jun 2025Nigeria Tax Act 2025: Economic Development Incentive replaces Pioneer StatusIncentiveIn forceNational Assembly / NIPC
8 Apr 2025Nigerian Independent System Operator (NISO) takes over system and market operationGrid accessIn forceNERC / NISO
20 Mar 2025NDP Act 2023 General Application and Implementation Directive (GAID) 2025: cross-border data transfersRegulationIn forceNigeria Data Protection Commission (NDPC)
2 Apr 2024NERC Eligible Customer Regulations 2024 (NERC-R-001-2024)Grid accessIn forceNigerian Electricity Regulatory Commission (NERC)
9 Jun 2023Electricity Act 2023 s.63(2): no licence for generation up to 1 MW per siteRegulationIn forceNational Assembly; NERC
9 Jun 2023Electricity Act 2023: states may set up their own electricity markets and regulatorsRegulationIn forceNational Assembly / President of Nigeria
24 Aug 2022Energy Transition Plan: carbon neutrality by 2060Plan or strategyIn forceFederal Government of Nigeria (Energy Transition Office)

How Nigeria compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Costa Rica—98.6% (2025)0.04 kgCO2/kWh (2025)11
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Israel—14.6% (2024)0.41 kgCO2/kWh (2024)10
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Morocco—27% (2024)—00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
New Zealand—88.5% (2025)0.08 kgCO2/kWh (2025)00
Nigeria154 USD/MWh (2026)32.7% (2025)—01
Norway100 USD/MWh (2026)96% (2025)0.01 kgCO2/kWh (2025)10
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Nigeria?

We have found no moratorium or restriction on new data centers in force in Nigeria as of 26 November 2026. Proposed or announced measures, if any, are listed in the timeline.

What incentives does Nigeria offer data centers?

In force: Nigeria Tax Act 2025: Economic Development Incentive replaces Pioneer Status. Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Nigeria?

The industrial electricity price in Nigeria was 154 USD/MWh in 2026 (Band A MD1/MD2 allowed tariff NGN 209.50/kWh (NERC May 2026 order) at NGN 1,358.19/USD, CBN average 1-27 Apr 2026 as quoted in the same order; 209.50/1358.19*1000 = 154.2 USD/MWh). Data center contracts can differ by voltage level, contract length and location.

How much of Nigeria’s electricity is renewable?

Renewables supplied 32.7% of electricity generation in Nigeria in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst