Country Reports · Forecast 2026-2035

Peru Data Center Infrastructure Market Size, Share & Forecast to 2035

Market at a glance

The Peru Data Center Infrastructure market was worth USD 115.0 million in 2025 and is forecast to reach USD 482.4 million by 2035, growing at a 15.42% CAGR.

$115.0MMarket size, 2025
$482.4MForecast, 2035
15.42%CAGR, 2025-2035
$42.5MMarket size, 2020
Market size, USD million
42.5 2020 115.0 2025 482.4 2035F

What is inside the report

  1. 01Introduction
  2. 02Executive Summary
  3. 03Market Scope
  4. 04Why Market Estimates Differ
  5. 05Market Drivers
  6. 06Market Trends
  7. 07Market Challenges
  8. 08Market Opportunities
  9. 09Pricing Analysis
  10. 10Standards and Regulation
  • 19chapters
  • 2020-2024Historical period
  • 2026-2035Forecast period
  • —Companies profiled

Full table of contents

Segmentation

Component
Electrical InfrastructureMechanical and Cooling InfrastructureBuilding Shell and Civil WorksRacks Cabling and White-Space Fit-OutDCIM Monitoring and Lifecycle Upgrades
Project Type
New BuildRetrofit and Lifecycle
Data Center Type
Colocation and WholesaleTelecom and Cloud EdgeEnterprise and GovernmentMining and Industrial Edge
Tier Level
Tier IIITier IVTier I and Tier II

Full analysis

The Peru Data Center Infrastructure Market is valued at USD 149.85 million in 2026 and is projected to reach USD 482.41 million by 2035, up from USD 115.00 million in 2025, a CAGR of 15.42% from 2025 to 2035 (DC Market Insights estimate). Peru Data Center Infrastructure covers the electrical, cooling, structural and white-space equipment installed inside Peruvian data centers, plus the monitoring software and lifecycle upgrades that keep those halls running. The money follows one district: Lurín, south of Lima, where the Mistral submarine cable of Telxius lands and where Cirion Technologies is building a 20 megawatt (MW) carrier-neutral campus of 12,000 square metres, so DC Market Insights places 30.00% of 2025 spending there. The 2025 receipt is 12 MW of new IT capacity × USD 7.00 million of infrastructure per MW = USD 84.00 million of new build, plus 88.56 MW of installed capacity × USD 0.35 million per MW a year = USD 31.00 million of upgrades. Regulated energy prices fell 28.0% for May 2025 to April 2026, according to the Supervisory Body for Investment in Energy and Mining (OSINERGMIN), which lowers the running cost of each new hall and pulls the 2026 market up 30.30%. DCIM, monitoring and lifecycle upgrades grow fastest by component at 17.41% a year, and Southern Peru is the fastest region at 18.36% a year as mining operators in Arequipa add on-site edge rooms.

Key Market Statistics: How Big Is the Peru Data Center Infrastructure Market in 2026?

DC Market Insights values the Peru Data Center Infrastructure Market at USD 149.85 million in 2026, 30.30% above USD 115.00 million in 2025.

  • Market size 2025: USD 115.00 million; 2026: USD 149.85 million; 2030: USD 284.87 million; 2035: USD 482.41 million.
  • CAGR 2025-2035: 15.42% in the base case; the 2035 range runs from USD 341.99 million (low case, 11.51%) to USD 636.74 million (high case, 18.67%).
  • Infrastructure per new MW in 2025: USD 7.00 million, of which electrical equipment is USD 2.80 million (DC Market Insights estimate).
  • Largest component: electrical infrastructure, USD 33.60 million or 29.22% of 2025 spending.
  • Fastest component: DCIM, monitoring and lifecycle upgrades, USD 31.00 million to USD 154.24 million, 17.41% a year.
  • Largest data center type: colocation and wholesale, USD 57.50 million (50.00%); fastest tier: Tier IV at 21.47% a year.
  • Leading region: Lima Metropolitan Area and Callao, USD 96.60 million (84.00%); fastest region: Southern Peru at 18.36% a year.
  • Largest location: Lurín (Lima), USD 34.50 million in 2025, rising to USD 164.02 million by 2035.
  • Installed IT capacity: about 100 MW at the end of 2025, rising to about 366 MW by 2035 (DC Market Insights estimate).
  • Market leaders: Schneider Electric, Vertiv and Huawei Digital Power supply about 45% of the electrical and cooling equipment value (DC Market Insights estimate).

How Fast Has Peru Data Center Infrastructure Spending Grown Since 2020?

The Peru Data Center Infrastructure Market size was valued at USD 42.49 million in 2020, reached USD 115.00 million in 2025, and is anticipated to reach USD 482.41 million by 2035, at a CAGR of 15.42% during the forecast period.

Report attribute Details
Historical period 2020-2024
Base year 2025
Forecast period 2026-2035
Market size 2025 USD 115.00 million
Market size 2026 USD 149.85 million
CAGR 2025-2035 15.42%
Market size 2035 USD 482.41 million

Spending rose 22.03% a year from 2020 to 2025 because new IT capacity commissioned each year tripled from 4 MW to 12 MW as telecom operators and neutral providers moved from small server rooms to multi-phase campuses. Growth slows to 15.42% a year after 2025 because a larger base grows more slowly in percentage terms, yet new capacity still rises to 40 MW a year by 2035 and the installed base passes 366 MW, which lifts upgrade spending from USD 31.00 million to USD 154.24 million.

Peru Data Center Infrastructure Market size 2020-2035: USD 42.49 million in 2020, USD 115.00 million in 2025 and USD 482.41 million in 2035, a CAGR of 15.42% from 2025 (DC Market Insights)

What Does Peru Data Center Infrastructure Include?

This market counts USD 115.00 million of 2025 end-user spending on the physical systems that power, cool, house and monitor IT equipment in Peruvian data centers.

Included

  • Electrical infrastructure: medium-voltage intake, transformers, switchgear, uninterruptible power supply (UPS) systems, batteries, power distribution and diesel generators.
  • Mechanical and cooling infrastructure: chillers, computer-room air handlers, heat rejection, pumps, piping and liquid-cooling readiness.
  • Building shell and civil works, including seismic-rated structure, raised floors and fire separation.
  • Racks, containment, structured cabling pathways and white-space fit-out.
  • Data center infrastructure management (DCIM) software, monitoring and lifecycle upgrades such as UPS and battery replacement.

Excluded

  • Servers, storage and network switches, covered in the Peru Data Center Storage Market and the wider Peru report.
  • Land, utility grid extensions outside the site boundary and colocation rental revenue.
  • Electricity bills and operating staff.

How Do the Peru Infrastructure Segments Add Up?

Every 2025 dollar appears once in each dimension: new build (USD 84.00 million) plus retrofit and lifecycle (USD 31.00 million) equals USD 115.00 million, and the component, data center type, tier and region splits reach the same total.

Why Do Peru Data Center Infrastructure Market Estimates Differ?

DC Market Insights puts the 2026 market at USD 149.85 million for facility infrastructure only; estimates that also count servers, storage, networking and colocation services land four to six times higher.

Three choices explain most of the gap. First, many published figures for Peruvian data centers mix the building with the IT inside it, so servers, storage arrays and network switches, which turn over every four to five years, swamp the facility spend; the Peru Data Center Market, which includes those layers, stands at USD 749.07 million in 2025 on DC Market Insights figures. Second, some estimates book the full value of a multi-phase campus in the year it is announced, while this model books spending when each MW is commissioned, so Claro’s programme of more than USD 50 million is spread across its phases. Third, wider definitions count telecom towers and mining control rooms as data centers. A narrower view that counts only white space misses that electrical and cooling equipment carry 50.61% of 2025 spending.

Element In this estimate Why
Electrical infrastructure Yes, USD 33.60 million (2025) Bought by the data center developer
Mechanical and cooling Yes, USD 24.60 million (2025) Bought by the data center developer
Shell, civil works and fit-out Yes, USD 25.80 million (2025) Part of every new hall
DCIM and lifecycle upgrades Yes, USD 31.00 million (2025) Keeps the installed base running
Servers, storage and networking No IT equipment, separate budgets and buyers
Colocation rental and cloud services No Revenue of operators, not equipment spend
Land and utility grid works No Paid outside the site boundary

Servers, storage, network switches, cloud services, land and grid works stay out of scope even when the same contractor delivers them. Every buyer group is in scope: neutral colocation providers, telecom operators, banks and government agencies with their own rooms, and small and medium enterprises (SMEs) and mining companies that buy a single prefabricated edge room.

What Is Driving Data Center Infrastructure Spending in Peru?

Three Peru-specific forces lift spending from USD 115.00 million in 2025 to USD 284.87 million in 2030: the Lurín cable-and-campus cluster, cheaper regulated power and telecom operators turning their own rooms into multi-phase colocation.

Lurín’s Cable Landing and 20 MW Campuses Pull Capacity South of Lima

The Mistral submarine cable of Telxius, 7,300 kilometres long with 132 terabits per second of potential capacity, lands at Lurín, and Cirion Technologies chose the same district for a 20 MW, 12,000 square metre carrier-neutral data center that it said in 2023 would open in the first quarter of 2025 (Cirion Technologies). Cirion’s Lima 2 page now offers more than 20 MW and the ability to install liquid cooling. DC Market Insights counts Lurín at USD 34.50 million of 2025 infrastructure spending, rising 16.87% a year to USD 164.02 million.

A 28% Cut in Regulated Energy Prices Lowers the Cost of Running a Hall

According to OSINERGMIN Technical Report 225-2025-GRT, the regulated bus-bar prices for May 2025 to April 2026 cut the average energy price from 22.47 to 16.18 céntimos of sol per kilowatt-hour, a 28.0% drop, and free-user contracts must stay within 10% of that benchmark (Source: OSINERGMIN). National peak demand on the interconnected grid (SEIN) was 7,827 MW on 10 October 2025, up 3.2% on a year earlier, according to the Ministry of Energy and Mines (MINEM). A 20 MW hall running at a power usage effectiveness (PUE) of 1.5 draws 30 MW, under 0.4% of that peak, which is why DC Market Insights lifts new capacity from 12 MW in 2025 to 16 MW in 2026.

Telecom Operators Build Multi-Phase Tier III Rooms for Colocation

Claro Peru opened the first phase of a Tier III data center in Lima in December 2023: a 250 square metre IT room with 104 cabinets, the first stage of an investment of more than USD 50 million, built with Grupo Carso, Huawei and Equans and supplied with certified renewable power from Luz del Sur (Claro Peru). Equinix entered Peru in August 2022 by buying a Lima data center from Entel for USD 80.3 million, according to its quarterly filing with the United States Securities and Exchange Commission (SEC). Each later phase of such a campus adds electrical and cooling blocks, so colocation and wholesale halls grow 17.14% a year to USD 279.80 million.

Halls are getting larger and denser: UPS blocks of 500 to 1,250 kilowatts (kW) launched in Lima in 2025, and Tier IV spending grows 21.47% a year from USD 6.90 million.

Megawatt-Class UPS Blocks Replace Room-Sized Systems

Schneider Electric launched its Galaxy VXL UPS in Peru on 24 March 2025, with ratings from 500 to 1,250 kW at 400 volts and up to 99% efficiency (Schneider Electric Peru). A product of that size only sells into halls of several MW, which matches the move from 104-cabinet rooms to 20 MW campuses. DC Market Insights puts UPS, batteries and power distribution at USD 1.10 million of the USD 7.00 million spent per new MW in 2025.

Liquid-Cooling Readiness Enters Lima Specifications

Cirion markets Lima 2 as able to host liquid cooling, and DC Market Insights adds USD 0.70 million per MW for piping, pumps and liquid-cooling readiness to every new hall from 2025. Mechanical and cooling infrastructure therefore grows from USD 24.60 million to USD 96.11 million by 2035.

Seismic Design Raises the Civil Share of Every Peruvian Hall

Peru sits on the Pacific Ring of Fire, and its national building code (Reglamento Nacional de Edificaciones) applies the E.030 seismic design standard to essential buildings. DC Market Insights estimates that seismic-rated structure, isolation and bracing take USD 1.35 million per new MW, 19.3% of the 2025 content, against about 15% in non-seismic markets.

What Holds Back Data Center Infrastructure Spending in Peru?

Two limits keep growth near 15.42% a year: small hall sizes that leave equipment imported in low volumes, and a market concentrated in one metropolitan grid.

Small Halls Keep Equipment Costs High

Equinix’s Lima LM1 site lists a total capacity of about 0.7 MW, and Claro’s first phase holds 104 cabinets. At that scale every UPS, chiller and switchgear line is imported in single units, which DC Market Insights estimates adds about 10% to the cost per MW compared with Santiago or Querétaro; the 12 MW added in 2025 is spread across fewer than ten projects.

Lima Holds 84.00% of Spending on One Grid

The Lima Metropolitan Area and Callao account for USD 96.60 million of 2025 spending, so outages, permits and grid upgrades in one distribution area shape almost the whole market. DC Market Insights’ low case of USD 341.99 million in 2035 assumes 30% less new capacity from 2027 if Lurín grid connections or financing slip.

Where Are the New Revenue Pools in Peru Data Center Infrastructure?

Two pools add the most: lifecycle upgrades of the installed base (USD 31.00 million to USD 154.24 million) and mining and industrial edge rooms (USD 9.20 million to USD 43.42 million).

Upgrading About 100 MW of Installed Rooms: USD 31.00 Million to USD 154.24 Million

Many bank, government and telecom rooms in San Isidro and other Lima districts were built for 3 to 5 kW per rack. Replacing batteries, UPS modules and computer-room air handlers, and adding DCIM software, costs about USD 0.35 million per installed MW a year in 2025, rising to USD 0.47 million by 2035, so this pool grows 17.41% a year.

Mining Edge Rooms in Southern Peru: USD 9.20 Million to USD 43.42 Million

Copper mines in Arequipa, Moquegua and Cusco run autonomous haulage, process control and remote operations from on-site rooms of 100 to 500 kW. DC Market Insights values mining and industrial edge infrastructure at 8.00% of 2025 spending, growing 16.79% a year, which makes Arequipa the fastest large location outside Lima at 17.54%.

How Much Does Data Center Infrastructure Cost per MW in Peru?

A new Peruvian data center needed about USD 7.00 million of infrastructure per MW of IT capacity in 2025, and the installed base cost about USD 0.35 million per MW a year to upgrade (DC Market Insights estimates).

Cost item (DC Market Insights estimate) 2020 2025 2030 2035
Infrastructure per new MW (USD million) 6.47 7.00 7.58 8.20
Lifecycle upgrades per installed MW a year (USD million) 0.28 0.35 0.41 0.47
New IT capacity commissioned (MW) 4 12 28 40

Content per MW rises 1.6% a year with equipment prices and denser cooling. Two public anchors frame the figure: Claro’s Lima programme of more than USD 50 million across four phases, and Digital Realty’s 2018 Ascenty acquisition material, which put about USD 425 million of remaining capital expenditure against 67 MW under construction or planned in Brazil and Chile, roughly USD 6.3 million per MW (DC Market Insights calculation).

Which Rules and Standards Apply to Data Center Infrastructure in Peru?

Five rules and standards shape most of the USD 115.00 million spent in 2025: two national policies, one building code and two design standards.

  • National Digital Transformation Policy to 2030, approved by Supreme Decree 085-2023-PCM and published on 28 July 2023, with the Presidency of the Council of Ministers’ Digital Government and Transformation Secretariat as lead body (El Peruano).
  • Supreme Decree 016-2024-JUS, the new regulation of Personal Data Protection Law 29733, published on 30 November 2024, which sets security duties for anyone processing personal data.
  • Reglamento Nacional de Edificaciones standard E.030 for seismic design.
  • Uptime Institute Tier classification, used by Claro for its Lima Tier III room.
  • ANSI/TIA-942 data center telecommunications infrastructure standard, used in Peruvian tenders for cabling and room design.

None of these rules forces data to stay in Peru, so demand comes from latency, banking supervision and resilience rather than a localisation mandate.

Which Segment Carries the Most Value in Peru Data Center Infrastructure?

Electrical infrastructure carries the most value, USD 33.60 million or 29.22% of 2025 spending, while DCIM, monitoring and lifecycle upgrades grow fastest at 17.41% a year.

By Component

Component 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Electrical Infrastructure 33.60 29.22% 131.27 14.60%
Mechanical and Cooling Infrastructure 24.60 21.39% 96.11 14.60%
Building Shell and Civil Works 16.20 14.09% 63.29 14.60%
Racks, Cabling and White-Space Fit-Out 9.60 8.35% 37.50 14.60%
DCIM, Monitoring and Lifecycle Upgrades 31.00 26.95% 154.24 17.41%

The four new-build components grow at the pace of new capacity, 14.60% a year; lifecycle upgrades grow faster because the installed base keeps compounding.

By Project Type

Project type 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
New Build 84.00 73.05% 328.17 14.60%
Retrofit and Lifecycle 31.00 26.95% 154.24 17.41%

New build takes 73.05% of 2025 spending; retrofit and lifecycle work rises to 32.0% by 2035.

By Data Center Type

Data center type 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Colocation and Wholesale 57.50 50.00% 279.80 17.14%
Telecom and Cloud Edge 17.25 15.00% 77.19 16.17%
Enterprise and Government 31.05 27.00% 82.01 10.20%
Mining and Industrial Edge 9.20 8.00% 43.42 16.79%

Colocation and wholesale rise to 58% of 2035 spending as enterprises and agencies move out of their own rooms; enterprise and government grows only 10.20% a year.

By Tier Level

Tier level 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Tier III 75.90 66.00% 347.33 16.43%
Tier IV 6.90 6.00% 48.24 21.47%
Tier I and Tier II 32.20 28.00% 86.83 10.43%

Tier III is the default for new Lima campuses at 66.00% of 2025 spending; Tier IV grows fastest at 21.47% a year from a small base of bank and payment-network rooms.

DC Exclusive: The Lurín 20 MW Hall Cost Teardown, USD 140 Million of Infrastructure

A 20 MW data center hall in Lurín needs about USD 140.00 million of infrastructure at 2025 prices, according to this DC Market Insights model, an estimate built on 9 inputs: 7 cost lines per MW, the 20 MW scale of the Cirion campus and the 2025 price level.

Cost line USD million per MW (2025) 20 MW hall (USD million) Share
Medium-voltage intake, transformers and switchgear 0.95 19.00 13.6%
UPS, batteries and power distribution 1.10 22.00 15.7%
Diesel generators and fuel systems 0.75 15.00 10.7%
Chillers, CRAH units and heat rejection 1.35 27.00 19.3%
Piping, pumps and liquid-cooling readiness 0.70 14.00 10.0%
Seismic-rated structure, shell and civil works 1.35 27.00 19.3%
Racks, containment, cabling and white-space fit-out 0.80 16.00 11.4%
Total 7.00 140.00 100.0%

The teardown gives three lessons for buyers. Electrical lines (intake, UPS and generators) take USD 2.80 million per MW, 40.0% of the bill, so the 28.0% fall in regulated energy prices does not cut construction cost; it cuts the 15-year running cost, which is what moved Lurín projects forward. Seismic structure at USD 1.35 million per MW is the line most specific to Peru, about USD 27.00 million for a 20 MW hall. And liquid-cooling readiness adds only USD 0.70 million per MW, 10.0% of the bill, which is cheap insurance against the higher-density racks that Cirion already markets in Lima 2. A hall built in four 5 MW phases spends about USD 35.00 million per phase, close to the scale of Claro’s programme of more than USD 50 million.

Which Region of Peru Buys the Most Data Center Infrastructure?

The Lima Metropolitan Area and Callao buy the most, USD 96.60 million or 84.00% of 2025 spending, while Southern Peru grows fastest at 18.36% a year to USD 43.42 million in 2035.

Region 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Lima Metropolitan Area and Callao 96.60 84.00% 385.93 14.86%
Southern Peru 8.05 7.00% 43.42 18.36%
Northern Peru 6.90 6.00% 36.18 18.02%
Central and Eastern Peru 3.45 3.00% 16.88 17.21%

Lima Metropolitan Area and Callao

Lima and Callao hold the cable landings, the banks and the government, and spend USD 96.60 million in 2025. Lurín alone rises from USD 34.50 million to USD 164.02 million as Cirion’s 20 MW campus fills.

Southern Peru

Southern Peru, led by Arequipa with USD 5.75 million in 2025, grows 18.36% a year because mining companies there add edge rooms for automation and remote operations.

Northern Peru

Northern Peru, led by Trujillo, Chiclayo and Piura, spends USD 6.90 million in 2025 and grows 18.02% a year as banks and retailers add regional disaster-recovery rooms.

Central and Eastern Peru

Central and Eastern Peru spends USD 3.45 million in 2025, mostly government and university rooms in Ica and Huancayo, and grows 17.21% a year.

Which Peruvian Cities and Districts Spend the Most on Data Center Infrastructure?

Lurín (Lima) spends the most, USD 34.50 million in 2025, and Chiclayo and Piura grow fastest at 18.79% a year from small bases.

Rank Location Region 2025 (USD million) 2035 (USD million) CAGR 2025-2035
1 Lurín (Lima) Lima Metropolitan Area and Callao 34.50 164.02 16.87%
2 Other Lima districts Lima Metropolitan Area and Callao 29.90 110.95 14.01%
3 San Isidro (Lima) Lima Metropolitan Area and Callao 16.10 48.24 11.60%
4 La Molina (Lima) Lima Metropolitan Area and Callao 10.35 33.77 12.55%
5 Callao Lima Metropolitan Area and Callao 5.75 28.94 17.54%
6 Arequipa Southern Peru 5.75 28.94 17.54%
7 Trujillo Northern Peru 3.45 16.88 17.21%
8 Chiclayo Northern Peru 1.72 9.65 18.79%
9 Piura Northern Peru 1.72 9.65 18.79%
10 Cusco Southern Peru 1.15 6.27 18.49%
11 Ica Central and Eastern Peru 1.15 6.27 18.49%
12 Huancayo Central and Eastern Peru 1.15 5.79 17.54%

San Isidro, Lima’s financial district, grows only 11.60% a year because its rooms sit in office towers with little space for new power blocks; Arequipa is the fastest large location outside Lima at 17.54%.

What Could the Peru Data Center Infrastructure Market Be Worth by 2035?

The 2035 value ranges from USD 341.99 million to USD 636.74 million, with a base case of USD 482.41 million (DC Market Insights scenarios).

Scenario 2035 (USD million) CAGR 2025-2035 Assumption
Low 341.99 11.51% 30% less new capacity from 2027 and 3% lower equipment prices, if Lurín connections or financing slip
Base 482.41 15.42% New capacity rises from 12 MW in 2025 to 40 MW a year in 2035
High 636.74 18.67% 30% more new capacity from 2027 and 4% higher content per MW, if a hyperscale cloud region is announced for Lima

Who Supplies and Buys Data Center Infrastructure in Peru?

Schneider Electric, Vertiv and Huawei Digital Power supply about 45% of the electrical and cooling equipment value, and Cirion, Gtd Perú and Claro account for about half of 2025 new-build spending (DC Market Insights estimates based on announced capacity and vendor presence).

  • Schneider Electric
  • Vertiv
  • Huawei Digital Power
  • Eaton
  • ABB
  • Cirion Technologies
  • Gtd Perú
  • Claro Peru (América Movil)
  • Telefónica del Perú
  • Equinix
  • Canvia
  • Win Empresas
  • Amazon Web Services
  • Grupo Carso
  • Equans

On the buyer side, Cirion’s 20 MW Lurín campus is the largest single project in the country; Claro’s Tier III programme exceeds USD 50 million; and Equinix paid USD 80.3 million for its Lima site in 2022, according to its SEC filing (Equinix Form 10-Q). Amazon Web Services named Lima among its planned Latin American Local Zones in March 2022, which places cloud infrastructure in third-party halls rather than a full region. On the supply side, Schneider Electric’s March 2025 launch of the 500 to 1,250 kW Galaxy VXL in Peru and Huawei’s role in building Claro’s Lima room show the main equipment vendors competing for each phase; Grupo Carso and Equans led construction work at Claro.

What Has Changed in Peru Data Center Infrastructure Since 2022?

Six dated moves since March 2022 show Peru shifting from small telecom rooms to multi-MW campuses.

  • In March 2022, Amazon Web Services named Lima among its planned Latin American Local Zones (Source: Amazon Web Services).
  • In August 2022, Equinix completed the purchase of a Lima data center from Entel for USD 80.3 million (Source: Equinix Form 10-Q).
  • In 2023, Cirion Technologies began building a 20 MW, 12,000 square metre data center in Lurín (Source: Cirion Technologies).
  • In July 2023, Peru approved its National Digital Transformation Policy to 2030 by Supreme Decree 085-2023-PCM (Source: El Peruano).
  • In December 2023, Claro Peru opened the first phase of its Lima Tier III data center with 104 cabinets (Source: Claro Peru).
  • In March 2025, Schneider Electric launched the Galaxy VXL UPS of 500 to 1,250 kW in Peru (Source: Schneider Electric).

Key Takeaways: What Should Buyers of Data Center Infrastructure in Peru Plan For?

Plan on about USD 7.00 million of infrastructure per MW in Peru in 2025, because seismic structure and imported equipment cost more than in larger Latin American hubs.

  • USD 1.35 million per MW goes to seismic structure, about USD 27.00 million in a 20 MW hall, because Peruvian halls follow the E.030 seismic standard.
  • 28.0% lower regulated energy prices for 2025-2026 improve the payback of a Lurín hall, because they cut running costs rather than build costs.
  • USD 154.24 million by 2035 makes lifecycle upgrades the largest component pool, because about 366 MW of installed rooms will need new batteries, UPS modules and cooling.
  • 18.36% a year makes Southern Peru the fastest region, worth USD 43.42 million by 2035, because mining companies add on-site edge rooms.

Methodology: How Did DC Market Insights Size the Peru Data Center Infrastructure Market?

DC Market Insights built the Peru Data Center Infrastructure Market bottom up from new and installed IT capacity, reaching USD 115.00 million for 2025 from 9 model inputs.

New-build spending equals new IT capacity commissioned (4 MW in 2020, 12 MW in 2025, 28 MW in 2030, 40 MW in 2035) multiplied by infrastructure content of USD 7.00 million per MW in 2025 (electrical 2.80, mechanical and cooling 2.05, shell and civil 1.35, racks and fit-out 0.80), escalating 1.6% a year: USD 84.00 million. Lifecycle spending equals the prior-year installed base (88.56 MW for 2025, 1% retired each year) multiplied by USD 0.35 million per MW: USD 31.00 million. Data center type, tier and regional shares apply to the total, and every split adds up to it.

Three bound checks hold. First ceiling: facility infrastructure equals about 15.4% of the USD 749.07 million Peru Data Center Market, which also counts IT equipment and services, in line with the 15% to 25% facility share seen in DC Market Insights’ Chile Data Center Infrastructure Market and the Latin America Data Center Infrastructure Market. Second ceiling: about 100 MW of installed IT capacity at a PUE of 1.5 draws about 150 MW, 1.9% of SEIN’s 7,827 MW peak, a plausible share for a country of Peru’s size. Floor: at Digital Realty’s Ascenty build-out rate of about USD 6.3 million per MW, 12 MW of 2025 capacity costs about USD 75.6 million, plus half the lifecycle rate gives about USD 91.1 million, below the base. The full approach is described on the DC Market Insights research methodology page.

Table of contents

  • 19 chapters
  • 1 figures
  • 11 data tables
  1. 01Introduction
    • 1.1Report Description
    • 1.2Key Market Statistics, 2025, 2026, 2030 and 2035
  2. 02Executive Summary
    • 2.1Market Snapshot, 2025, 2026 and 2035
    • 2.2Market Size Chart, 2020-2035
  3. 03Market Scope
    • 3.1Included
    • 3.2Excluded
    • 3.3How Do the Peru Infrastructure Segments Add Up?
  4. 04Why Market Estimates Differ
    • 4.1Scope Table: What Is In and Out of This Estimate
  5. 05Market Drivers
    • 5.1Lurín's Cable Landing and 20 MW Campuses
    • 5.2A 28% Cut in Regulated Energy Prices
    • 5.3Telecom Operators Build Multi-Phase Tier III Rooms
  6. 06Market Trends
    • 6.1Megawatt-Class UPS Blocks
    • 6.2Liquid-Cooling Readiness in Lima Specifications
    • 6.3Seismic Design and the Civil Share
  7. 07Market Challenges
    • 7.1Small Halls Keep Equipment Costs High
    • 7.2Concentration in Lima on One Grid
  8. 08Market Opportunities
    • 8.1Upgrading the Installed Base
    • 8.2Mining Edge Rooms in Southern Peru
  9. 09Pricing Analysis
    • 9.1Infrastructure Cost per MW, 2020-2035
    • 9.2Public Price Anchors
  10. 10Standards and Regulation
    • 10.1Supreme Decree 085-2023-PCM
    • 10.2Supreme Decree 016-2024-JUS
    • 10.3Standard E.030 Seismic Design
    • 10.4Uptime Institute Tier Classification
    • 10.5ANSI/TIA-942
  11. 11Market Segmentation
    • 11.1By Component
    • 11.2Electrical Infrastructure
    • 11.3Mechanical and Cooling Infrastructure
    • 11.4Building Shell and Civil Works
    • 11.5Racks, Cabling and White-Space Fit-Out
    • 11.6DCIM, Monitoring and Lifecycle Upgrades
    • 11.7By Project Type
    • 11.8New Build
    • 11.9Retrofit and Lifecycle
    • 11.10By Data Center Type
    • 11.11Colocation and Wholesale
    • 11.12Telecom and Cloud Edge
    • 11.13Enterprise and Government
    • 11.14Mining and Industrial Edge
    • 11.15By Tier Level
    • 11.16Tier III
    • 11.17Tier IV
    • 11.18Tier I and Tier II
  12. 12DC Exclusive: The Lurín 20 MW Hall Cost Teardown
    • 12.1Seven Cost Lines per MW
    • 12.2Phasing a 20 MW Hall
  13. 13Regional Analysis
    • 13.1Lima Metropolitan Area and Callao
    • 13.2Southern Peru
    • 13.3Northern Peru
    • 13.4Central and Eastern Peru
  14. 14City and District Analysis
    • 14.1Lurín (Lima)
    • 14.2Other Lima districts
    • 14.3San Isidro (Lima)
    • 14.4La Molina (Lima)
    • 14.5Callao
    • 14.6Arequipa
    • 14.7Trujillo
    • 14.8Chiclayo
    • 14.9Piura
    • 14.10Cusco
    • 14.11Ica
    • 14.12Huancayo
  15. 15Forecast Scenarios, 2035
    • 15.1Low Case
    • 15.2Base Case
    • 15.3High Case
  16. 16Competitive Analysis
    • 16.1Schneider Electric
    • 16.2Vertiv
    • 16.3Huawei Digital Power
    • 16.4Eaton
    • 16.5ABB
    • 16.6Cirion Technologies
    • 16.7Gtd Perú
    • 16.8Claro Peru (América Movil)
    • 16.9Telefónica del Perú
    • 16.10Equinix
    • 16.11Canvia
    • 16.12Win Empresas
    • 16.13Amazon Web Services
    • 16.14Grupo Carso
    • 16.15Equans
  17. 17Recent Developments
    • 17.1AWS Lima Local Zone Plan, March 2022
    • 17.2Equinix Lima Purchase, August 2022
    • 17.3Cirion Lurín Construction, 2023
    • 17.4National Digital Transformation Policy, July 2023
    • 17.5Claro Peru Tier III Opening, December 2023
    • 17.6Schneider Electric Galaxy VXL Launch, March 2025
  18. 18Key Takeaways
    • 18.1Seismic Cost per MW
    • 18.2Energy Price Cut
    • 18.3Lifecycle Upgrade Pool
    • 18.4Southern Peru Growth
  19. 19Research Methodology
    • 19.1Model Inputs
    • 19.2Bound Checks
  1. Fig. 1Peru Data Center Infrastructure Market Size, 2020-2035 (USD million)
  1. Table 1Market Snapshot, 2025, 2026 and 2035
  2. Table 2Scope Table: What Is In and Out of This Estimate
  3. Table 3Infrastructure Cost per MW, 2020-2035
  4. Table 4Market by Component, 2025 and 2035
  5. Table 5Market by Project Type, 2025 and 2035
  6. Table 6Market by Data Center Type, 2025 and 2035
  7. Table 7Market by Tier Level, 2025 and 2035
  8. Table 8Lurín 20 MW Hall Cost Teardown
  9. Table 9Market by Region, 2025 and 2035
  10. Table 10Top 12 Cities and Districts, 2025 and 2035
  11. Table 11Forecast Scenarios, 2035

About this report

Amit JainDeepti Agrawal

Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.

Read our methodology

How we built this

  • Historical period2020-2024
  • Base year2025
  • Forecast period2026-2035
  • Sizing approachTop-down + bottom-up

Need more than the report?

Advisory on this market

Due diligence, site selection and market entry work, by the analysts who wrote this report.

See consulting services

Frequently asked questions

What is the size of the Peru Data Center Infrastructure Market in 2026?

USD 149.85 million in 2026, up 30.30% from USD 115.00 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 482.41 million by 2035, a CAGR of 15.42% from 2025.

How fast is the Peru Data Center Infrastructure Market growing?

15.42% a year from 2025 to 2035, after 22.03% a year from 2020 to 2025, as new IT capacity rises from 12 MW in 2025 to 40 MW a year by 2035 (DC Market Insights).

How much does data center infrastructure cost per MW in Peru?

About USD 7.00 million per MW of new IT capacity in 2025, including USD 2.80 million of electrical and USD 1.35 million of seismic-rated structure, plus USD 0.35 million per installed MW a year for upgrades (DC Market Insights estimates).

Which component leads Peru data center infrastructure spending?

Electrical infrastructure, with USD 33.60 million or 29.22% of 2025 spending. DCIM, monitoring and lifecycle upgrades grow fastest at 17.41% a year to USD 154.24 million by 2035.

Why is Lurín the centre of data center building in Peru?

30.00% of 2025 infrastructure spending sits in Lurín, where the Mistral submarine cable lands and Cirion Technologies is building a 20 MW, 12,000 square metre campus; DC Market Insights expects spending there to grow 16.87% a year to 2035.

Which region of Peru grows fastest in data center infrastructure?

Southern Peru, at 18.36% a year to USD 43.42 million in 2035, led by mining edge rooms in Arequipa. Lima Metropolitan Area and Callao still holds 84.00% of 2025 spending.

How do lower power prices affect Peru data centers?

A 28.0% cut: OSINERGMIN’s regulated average energy price for May 2025 to April 2026 fell from 22.47 to 16.18 céntimos of sol per kWh, lowering the running cost of new halls and supporting the 30% jump in 2026 spending.

Who are the key companies in Peru data center infrastructure?

Schneider Electric, Vertiv and Huawei Digital Power supply about 45% of electrical and cooling equipment value (DC Market Insights estimate), while Cirion Technologies, Gtd Perú, Claro Peru and Equinix are the largest buyers of new infrastructure.

What will the Peru Data Center Infrastructure Market be worth by 2035?

USD 482.41 million in the base case, within a range of USD 341.99 million to USD 636.74 million depending on how much new capacity reaches Lurín and other Lima districts after 2027 (DC Market Insights scenarios).

Why do Peru Data Center Infrastructure Market estimates differ?

USD 149.85 million in 2026 is the DC Market Insights figure for facility infrastructure only. Estimates that add servers, storage, networking and colocation services land four to six times higher, as the USD 749.07 million Peru Data Center Market shows for 2025.

Get this report

How do I get the full report?

Request a quote; we reply by email within one business day.

How and when will I receive the report?

By email, within 24-48 business hours of payment.

How can I pay?

Once you accept the quote, we email you a secure payment link.

Can I see a sample first?

Yes. Request a free sample and we will email it to you.

Can the report be tailored to my needs?

Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.

Can I get an invoice or pay against a purchase order?

Write to sales@dcmarketinsights.com and our team will help.

Refund and returns policy

Request a quote

Peru Data Center Infrastructure Market

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Free sample

Peru Data Center Infrastructure Market

See the structure, tables and charts before you decide.

Smallform of Sample request

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to send your sample and answer your questions
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Talk to an analyst

Ask the team that built this report

Different scope, country or data cut? A senior analyst replies within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy