Proprietary data
EdgeConneX Data Centers
Data centers operated by EdgeConneX that we have verified: location, status and capacity, each checked against its source.
In short
As of 15 November 2026, DC Market Insights tracks 60 data centers operated by EdgeConneX in 15 countries, of which 36 are operational. Stated operational capacity is 137 MW, with a further 317 MW under construction and 449 MW planned. The pipeline is 5.6 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 29 of 60 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
EdgeConneX data centers: key facts
About EdgeConneX
EdgeConneX is a Build-to-Suit and Build-to-Density data center developer and operator founded in 2009 and owned by EQT Infrastructure since 2020. Its website (October 2026) states over 90 data centers built and in development across North America, South America, Europe, the Middle East and Asia Pacific, ranging from 40 kW to 500 MW or more, with headquarters in Herndon (Northern Virginia), Schiphol-Rijk (Amsterdam) and Singapore. Large campuses under way include a 200 MW site in Greater Osaka and a planned site of up to 1 GW in Skellefteå, Sweden.
- Headquarters
- Herndon, United States
- Founded
- 2009
- Ownership
- Private; acquired by EQT Infrastructure in 2020
- Parent company
- EQT Infrastructure
- Tracked footprint
- 60 facilities in 15 countries
- Website
- edgeconnex.com
Data center business
- In Jakarta, EdgeConneX bought 45,000 sqm of land in Bekasi, Cikarang, to expand its hyperscale campus to 200+ MW, tripling capacity; the campus page shows 2 MW operational.
- EdgeConneX says it has over 90 data centers sustainably built and in development across Asia Pacific, Europe, the Middle East, North America and South America, with facilities ranging from 40 kW to 500 MW or more. It offers Build-to-Suit and Build-to-Density solutions and runs its patented EdgeOS data center operating system. (Another line on the same page still says 'over 80'.)
- Americas: the company lists 29 data center markets in the US, Canada, Chile, Colombia and Argentina, including Atlanta, Boston, Chicago, Denver, Houston, Phoenix, Portland, Santa Clara, Seattle, Toronto, Santiago, Bogota and Buenos Aires, plus Austin (Texas) and New Albany (Ohio) marked as coming soon.
- Europe and Middle East: data centers in Amsterdam, Barcelona, Brussels, Dublin, Munich, Tel Aviv and Warsaw, with Frankfurt, Fyresdal (Norway), Milan, Skellefteå (Sweden) and Vaasa (Finland) coming soon. In Amsterdam it operates four data centers with up to 40 MW N+1; the Dublin campus at Grange Castle has 32 MW N+1 (DUB01 18 MW, DUB02 7 MW, DUB03 7 MW planned).
- Asia-Pacific: data centers in Beijing-Tianjin, Greater Shanghai, Chennai, Jakarta, Japan and Kuala Lumpur, with further sites coming soon in Malaysia (Bukit Jalil, Cyberjaya, Johor), India (several cities), Manila, Sydney and Melbourne. India sites are developed through the AdaniConneX joint venture with Adani Enterprises.
Ownership and investors
- EQT's half-year report for 2026 says EQT introduced its AI Infrastructure strategy, fully seeded by EdgeConneX through the acquisition of a minority stake in the company from EQT Infrastructure IV and V.
- EQT Infrastructure, invested in EdgeConneX since 2020, signed an agreement to sell a minority stake in the company to funds managed by Sixth Street, with EQT Infrastructure remaining the largest shareholder after closing.
Recent updates
- Entered Australia in a partnership with Stockland: the two are advancing an initial portfolio of hyperscale data center campuses in Sydney and Melbourne, with 450MW of power secured.
- Co-invested in the Amazon-led $32 million Colorado River Basin water stewardship collaborative.
- Appointed an SVP of Global Construction Delivery and vice presidents for Norway and Germany; the Fyresdal (Norway) campus is in development and Munich and Frankfurt have planned expansions.
- Joined Singapore's Sustainable Tropical Data Centre Testbed 2.0 as a top-tier anchor partner with a multi-year funding commitment.
- Backed the Texas Governor's data center standards while developing a new technology campus in Bastrop County near Austin, committing to air-cooled or closed-loop cooling at most sites and to fund project energy costs so residential ratepayers are not burdened.
- Opened a global training center at its Houston data center campus (ribbon-cutting 2 April 2026) for AI-era power and cooling practices.
- Started construction of its first Japan campus, a 200 MW AI-ready hyperscale campus on 130,000 sqm in Greater Osaka (ITM01 at the Kagoya Tatara Campus, Kyotanabe), with Kagoya Asset Management; first phase ready for service in Q1 2028. The company plans 350 MW in the Greater Osaka region.
- Agreed to acquire a site in Skellefteå, Sweden, from Lyten, with potential capacity of up to one gigawatt, subject to administrative and regulatory processes.
Company details checked against company and official sources, 3 Nov 2026.
- Capacity under construction or planned (766 MW) is 5.6 times the operational base of 137 MW.
- Its largest operational site is Amsterdam campus (AMS01) in Amsterdam, Netherlands at 40 MW.
- The largest project in the pipeline is ITM01 Kagoya Tatara Campus by EdgeConneX (200 MW, under construction).
- Malaysia accounts for 31% of tracked capacity (3 facilities).
- By type, the tracker lists 31 colocation, 19 edge and 10 hyperscale facilities.
- 29 of 60 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
EdgeConneX development pipeline
Under construction and planned facilities with a stated capacity, largest first. 317 MW under construction and 449 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| ITM01 Kagoya Tatara CampusEdgeConneX | Kyotanabe, Japan | Under construction | Hyperscale | 200 MW |
| EdgeConneX CyberjayaEdgeConneX | Cyberjaya, Malaysia | Planned | Colocation | 200 MW |
| AMS10EdgeConneX | Schiphol-Rijk, Netherlands | Under construction | Colocation | 108 MW |
| EdgeConneX Bukit JalilEdgeConneX | Kuala Lumpur, Malaysia | Planned | Colocation | 67 MW |
| AMS13EdgeConneX | Schiphol-Rijk, Netherlands | Planned | Colocation | 54 MW |
| SCL04EdgeConneX | Colina, Chile | Planned | Colocation | 33 MW |
| EdgeConneX Lucan (Ballymakaily) data centresEdgeConneX | Lucan, Ireland | Planned | Colocation | 30 MW |
| DEN02EdgeConneX | Denver, United States | Planned | Colocation | 24 MW |
| EdgeConneX Kuala Lumpur CBDEdgeConneX | Kuala Lumpur, Malaysia | Planned | Colocation | 17 MW |
| BOG01EdgeConneX | Bogotá, Colombia | Planned | Colocation | 9.6 MW |
| BOG02EdgeConneX | Bogotá, Colombia | Under construction | Colocation | 9.6 MW |
| SCL03EdgeConneX | Colina, Chile | Planned | Colocation | 7 MW |
Facilities
60 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| MEM01Edge | Memphis, United States | Operational | — | — | Operator / official |
| MIA01Edge | United States | Operational | — | — | Operator / official |
| MIA02Edge | United States | Operational | — | — | Operator / official |
| MSP01Edge | Minneapolis, United States | Operational | — | — | Operator / official |
| SEA01Edge | United States | Operational | — | — | Operator / official |
Skellefteå campusHyperscale
History
|
Skellefteå, Sweden | Planned | — | — | Operator / official |
| SLI01Edge | Slidell, United States | Operational | — | — | Operator / official |
| TAL01Edge | United States | Operational | — | — | Operator / official |
| TOR-01Edge | Toronto, Canada | Operational | — | — | Operator / official |
| WAW01Colocation | Warsaw, Poland | Operational | — | — | Operator / official |
Market position
How EdgeConneX compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, EdgeConneX ranks #49 of 171 tracked operators by capacity, with 0.1% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Netherlands, EdgeConneX ranks #1 of 33 tracked operators by capacity, with 32% of the country’s tracked MW.
- In Ireland, EdgeConneX ranks #7 of 15 tracked operators by capacity, with 4.7% of the country’s tracked MW.
- Our Deal Tracker lists 1 deal(s) naming EdgeConneX, the latest on 14 October 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| CloudHQ | 1 | — | 84 MW |
| Pure DC | 1 | — | 78 MW |
| Digital Realty | 13 | — | 70 MW |
| NorthC | 14 | 57 MW | — |
| CyrusOne | 1 | 54 MW | — |
| Iron Mountain | 2 | 13.1 MW | 20 MW |
| NTT DATA | 1 | 20.7 MW | — |
| Colt DCS | 2 | 15 MW | — |
All data centers in Netherlands Power and policy in Netherlands
Data center operators in Ireland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Red Admiral DC | 1 | — | 250 MW |
| Echelon Data Centres | 2 | — | 200 MW |
| Art Data Centres | 1 | — | 200 MW |
| Herbata | 1 | — | 180 MW |
| Amazon Web Services | 6 | — | 169 MW |
| Huntstown Power Company | 1 | — | 150 MW |
| Pure DC | 3 | 14 MW | 40 MW |
| Vantage Data Centers | 1 | — | 52 MW |
All data centers in Ireland Power and policy in Ireland
Deals naming EdgeConneX
- EdgeConneX; Stockland → Hyperscale data center campus JV, Australia (initial campuses Sydney and Melbourne, 450 MW power secured) JV / partnership
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does EdgeConneX operate?
DC Market Insights tracks 60 EdgeConneX data center(s) in 15 countries as of November 2026: 36 operational, 6 under construction and 18 planned.
Where is EdgeConneX headquartered?
EdgeConneX is headquartered in Herndon, United States. Ownership: Private; acquired by EQT Infrastructure in 2020.
Which other companies operate data centers in United States?
Besides EdgeConneX, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.