Proprietary data

Data Centers in United Kingdom

Every data center in United Kingdom that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 16 November 2026, DC Market Insights tracks 197 data centers in United Kingdom run by 54 operators: 133 operational, 10 under construction and 54 planned. Stated operational capacity is 1,025 MW, with a further 332 MW under construction and 7,409 MW planned. Ark Data Centres holds the largest share of tracked operational capacity (27%).

197Facilities tracked
54Operators
1,025 MWOperational (133 sites)
332 MWUnder construction (10 sites)
7,409 MWPlanned (54 sites)

MW = IT capacity where the source states it, otherwise total capacity. 115 of 197 facilities have a stated capacity; the others are counted as sites only.

London North · Colt DCS · Welwyn Garden City (approximate location)Equinix LD3 · Equinix · London (approximate location)Equinix LD4 · Equinix · Slough (approximate location)Equinix LD5 · Equinix · Slough (approximate location)Equinix LD6 · Equinix · Slough (approximate location)Equinix LD7 · Equinix · Slough (approximate location)Equinix LD8 · Equinix · London (approximate location)Equinix LD9 · Equinix · London (approximate location)Equinix LD10 · Equinix · Slough (approximate location)Equinix LD11x · Equinix · Slough (approximate location)Equinix LD13x · Equinix · Slough (approximate location)Equinix MA1 · Equinix · Manchester (approximate location)Equinix MA3 · Equinix · Manchester (approximate location)Equinix MA4 · Equinix · Manchester (approximate location)Equinix MA5 · Equinix · Manchester (approximate location)Digital Realty LGW14 · Digital Realty · Woking (approximate location)Digital Realty LGW15 · Digital Realty · Crawley (approximate location)Digital Realty LGW16 · Digital Realty · Crawley (approximate location)Digital Realty LHR13 · Digital Realty · Chessington (approximate location)Digital Realty LHR17 · Digital Realty · West Drayton (approximate location)Digital Realty LHR18 · Digital Realty · London (approximate location)Digital Realty LHR19 · Digital Realty · London (approximate location)Digital Realty LHR20 · Digital Realty · London (approximate location)Digital Realty LHR26 · Digital Realty · Slough (approximate location)Digital Realty LHR27 · Digital Realty · Slough (approximate location)Digital Realty LON1 · Digital Realty · London (approximate location)Digital Realty LON2 · Digital Realty · London (approximate location)Digital Realty LON3 · Digital Realty · London (approximate location)Global Switch London East · Global Switch · London (approximate location)Global Switch London North · Global Switch · London (approximate location)Global Switch London South · Global Switch · London (approximate location)Telehouse North · Telehouse · London (approximate location)Telehouse North Two · Telehouse · London (approximate location)Telehouse East · Telehouse · London (approximate location)Telehouse West · Telehouse · London (approximate location)Telehouse South · Telehouse · London (approximate location)NTT Hemel Hempstead 1 · NTT DATA · Hemel Hempstead (approximate location)NTT Hemel Hempstead 2 · NTT DATA · Hemel Hempstead (approximate location)NTT Hemel Hempstead 3 · NTT DATA · Hemel Hempstead (approximate location)NTT Hemel Hempstead 4 · NTT DATA · Hemel Hempstead (approximate location)NTT London 1 · NTT DATA · Dagenham (approximate location) · Cooling: HybridIron Mountain LON-1 · Iron Mountain · Slough (approximate location)Iron Mountain LON-2 · Iron Mountain · Slough (approximate location)Iron Mountain LON-3 · Iron Mountain · Slough (approximate location)CyrusOne LON1 · CyrusOne · Slough (approximate location)CyrusOne LON2 · CyrusOne · London (approximate location)CyrusOne LON3 · CyrusOne · Slough (approximate location)CyrusOne LON4 · CyrusOne · Slough (approximate location)CyrusOne LON5 · CyrusOne · Slough (approximate location)CyrusOne Southall · CyrusOne · Southall (approximate location)Centersquare Reading LHR3 · Centersquare · Reading (approximate location)LONDON3 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON4 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON9 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON10 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON11 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON19 (Slough) · Virtus Data Centres · Slough (approximate location)KLON-01 (Harlow) · Kao Data · Harlow (approximate location)KLON-02 (Harlow) · Kao Data · Harlow (approximate location)KLON-03 (Harlow) · Kao Data · Harlow (approximate location) · Cooling: HybridKLON-04 (Harlow) · Kao Data · Harlow (approximate location)KLON-05 (Northolt) · Kao Data · Northolt (approximate location)KLON-06 (Slough) · Kao Data · Slough (approximate location)KMAN-01 (Manchester) · Kao Data · Stockport (approximate location)Cody Park · Ark Data Centres · Farnborough (approximate location)Meridian Park · Ark Data Centres · Enfield (approximate location)Spring Park · Ark Data Centres · Corsham (approximate location)Spring Park extension (Westwell Road) · Ark Data Centres · Corsham (approximate location)Longcross Park · Ark Data Centres · Chertsey (approximate location)Longcross Park LP02 · Ark Data Centres · Chertsey (approximate location)Hilfield Park (former Mercure Hotel, Elstree) · Ark Data Centres · Elstree (approximate location)Yondr Slough Building 1 · Yondr · Slough (approximate location)Yondr Slough Building 2 · Yondr · Slough (approximate location)Yondr Slough Building 3 · Yondr · Slough (approximate location)London 4 (Hayes) · Colt DCS · Hayes (approximate location)London 6 (Hayes Digital Park) · Colt DCS · Hayes (approximate location)London 7 (Hayes Digital Park) · Colt DCS · Hayes (approximate location)London West · Colt DCS · Park Royal, London (approximate location)London 8 (Hayes Digital Park) · Colt DCS · Hayes (approximate location)Docklands Campus · Ada Infrastructure · London (approximate location)Cardiff (Rover Way) · Latos Data Centres · Cardiff (approximate location)Stockton neural Edge · Latos Data Centres · Stockton-on-Tees (approximate location)LON1 · Serverfarm · Feltham (approximate location)Edinburgh South Gyle SC-1 · Pulsant · Edinburgh (approximate location)Edinburgh SC-2 · Pulsant · Edinburgh (approximate location)Edinburgh SC-3 · Pulsant · Edinburgh (approximate location)Manchester NW-1 · Pulsant · Manchester (approximate location)Rotherham YH-1 · Pulsant · Rotherham (approximate location)Newcastle NE-1 · Pulsant · Newcastle upon Tyne (approximate location)Newcastle NE-2 · Pulsant · North Shields (approximate location)Birmingham WM-1 · Pulsant · Birmingham (approximate location)Milton Keynes SE-1 · Pulsant · Milton Keynes (approximate location)Maidenhead SE-2 · Pulsant · Maidenhead (approximate location)Reading SE-3 · Pulsant · Reading (approximate location)Reading SE-4 · Pulsant · Reading (approximate location)Croydon LN-1 · Pulsant · Croydon (approximate location)Fareham SE-5 · Pulsant · Fareham (approximate location)nLighten Birmingham (BHX1) · nLighten · Birmingham (approximate location)nLighten Bristol (BRS1) · nLighten · Bristol (approximate location)nLighten Chester (MAN1) · nLighten · Chester (approximate location)nLighten Leeds (LBA1) · nLighten · Leeds (approximate location)nLighten Liverpool (LPL1) · nLighten · Liverpool (approximate location)nLighten London (STN1) · nLighten · Hoddesdon (approximate location)nLighten Milton Keynes (LTN1) · nLighten · Milton Keynes (approximate location)nLighten Nottingham (EMA1) · nLighten · Nottingham (approximate location)nLighten Rugby (BHX2) · nLighten · Rugby (approximate location)nLighten Swindon (BRS2) · nLighten · Swindon (approximate location)Datum FRN1 · Datum Datacentres · Farnborough (approximate location)Datum FRN2 · Datum Datacentres · Farnborough (approximate location)Datum MCR1 · Datum Datacentres · Manchester (approximate location)Datum MCR2 · Datum Datacentres · Manchester (approximate location)iomart DC1 Glasgow · iomart · Glasgow (approximate location)iomart DC2 Central London · iomart · London (approximate location)iomart DC12 North London · iomart · London (approximate location)iomart DC5 Maidenhead · iomart · Maidenhead (approximate location)iomart DC6 and DC7 Manchester City · iomart · Manchester (approximate location)iomart DC13 Manchester Trafford Wharf · iomart · Manchester (approximate location)iomart DC3 Nottingham · iomart · Nottingham (approximate location)iomart DC4 Leicester · iomart · Leicester (approximate location)iomart DC9 Gosport · iomart · Gosport (approximate location)iomart DC11 York · iomart · York (approximate location)iomart DC8 St Asaph · iomart · Saint Asaph (approximate location)DataVita DV1 Lanarkshire · DataVita · Chapelhall (approximate location)DataVita DV2 Glasgow · DataVita · Glasgow (approximate location)Custodian DA2 Dartford · Custodian Data Centres · Dartford (approximate location)Custodian ME14 Maidstone · Custodian Data Centres · Maidstone (approximate location)Volta London (Great Sutton Street) · Volta Data Centres · London (approximate location)Node4 Derby · Node4 · Derby (approximate location)Node4 Leeds · Node4 · Leeds (approximate location)Node4 Northampton (DC4) · Node4 · Northampton (approximate location)Six Degrees Birmingham Central · Six Degrees · Birmingham (approximate location)Six Degrees Studley · Six Degrees · Studley (approximate location)Pure DC London Brent Cross (LON01) Building 1 · Pure DC · London (approximate location)Pure DC London Brent Cross (LON01) Building 2 · Pure DC · London (approximate location)Pure DC London Park Royal (LON02) · Pure DC / SEGRO JV · London (approximate location)Prescient Data Centres Coleraine · Prescient Data Centres · Coleraine (approximate location)Google Waltham Cross · Google · Waltham Cross (approximate location) · Cooling: Air or free cooling · Owned: Google's own data centreMicrosoft Skelton Grange · Microsoft · Leeds (approximate location) · Owned: Plot 1 (27 acres) bought from Harworth in June 2024; Plot 2 (21 acres) sale to Microsoft not yet completedStargate UK – Cobalt Park · Nscale / OpenAI (Stargate UK) · Wallsend (approximate location)Abbots Langley (Bedmond Road) · Greystoke Land · Abbots Langley (approximate location)Corscale Iver (Court Lane) · Corscale · Iver (approximate location)AWS Iver (Ridgeway) · Amazon Web Services · Iver (approximate location)AWS Swindon (Burderop) · Amazon Web Services · Swindon (approximate location)Teesworks Data Centre · Teesworks Ltd · Middlesbrough (approximate location)Gravity Edge Camberley · Gravity Edge · Camberley (approximate location)Apatura Larbert (Glenbervie) · Apatura · Larbert (approximate location)Ravenscraig AI Data Centre · Apatura · Motherwell (approximate location)Wester Hermiston Data Centre Campus · Apatura · Edinburgh (approximate location)Apatura Coldstream · Apatura · Coldstream (approximate location)Apatura Cumnock · Apatura · Cumnock (approximate location)DataBank LHR1 London Heathrow · DataBank · Feltham (approximate location)Manor Farm Data Centre (Poyle) · Manor Farm Propco · Slough (approximate location)Ark Union Park UP4 · Ark Data Centres · Hayes (approximate location)SDC M40 Campus (Wapseys Wood) · Slough Holdings UK · Gerrards Cross (approximate location)Ebbsfleet Datacentre Campus · CSE52 · Dartford (approximate location)London 5 (Hayes) · Colt DCS · Hayes (approximate location)Union Park · Ark Data Centres · Hayes (approximate location)Alliance Park · Ark Data Centres · Ealing (approximate location)Telehouse West Two · Telehouse · London (approximate location)Telehouse East India Dock (Inventory Estate) · Telehouse · London (approximate location)Wilton International data centre campus · Digital Reef · Redcar (approximate location)Galaxy Redhill new data centre (Foxboro Business Park) · Galaxy Data Centers · Redhill (approximate location)DataVita DV3 Lanarkshire · DataVita · Chapelhall (approximate location)Canning Town hyperscale data centre (Newham) · sineQN · London (approximate location)Peel Park Blackpool data centre · Elite UK REIT · Blackpool (approximate location)Silicon Sands data centre 1 (Blackpool Airport Enterprise Zone) · Blackpool Council · Blackpool (approximate location)CyrusOne LON6 · CyrusOne · Iver Heath (exact location) · Cooling: Chilled water, dry coolersStellanor London City · Stellanor · London (exact location)Stellanor London East · Stellanor · London (exact location)Stellanor London North · Stellanor · London (exact location)Stellanor London West · Stellanor · Hounslow (exact location)Stellanor Byfleet · Stellanor · West Byfleet (exact location)Stellanor Cambridge · Stellanor · Cambridge (exact location)Stellanor Gatwick · Stellanor · Crawley (exact location)Stellanor Hemel Hempstead · Stellanor · Hemel Hempstead (exact location)Stellanor Reading · Stellanor · Reading (exact location)Stellanor West Yorkshire · Stellanor · Elland (exact location)Stellanor Woking · Stellanor · Woking (exact location)LHR Campus · CloudHQ · Didcot (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

United Kingdom data center market: key facts

  • Capacity under construction or planned (7,741 MW) is 7.6 times the operational base of 1,025 MW.
  • The three largest operators by operational capacity, Ark Data Centres, Vantage Data Centers and Virtus Data Centres, hold 51% of tracked operational MW.
  • Apatura has the largest development pipeline in United Kingdom: 2,100 MW under construction or planned.
  • The largest operational facility we track is Cardiff Campus (Newport) (Vantage Data Centers, Newport) at 148 MW.
  • The largest project in the pipeline is Elsham Tech Park (1,000 MW, planned).
  • Scotland is the largest cluster: 13 of 197 facilities and 31% of tracked capacity.
  • By type, the tracker lists 125 colocation, 42 hyperscale and 25 edge facilities.
  • 14 facilities publish a PUE figure; the lowest is 1.15 at DataVita DV1 Lanarkshire (DataVita) and the median is 1.50.
  • 115 of 197 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational1,025 MW
Under construction332 MW
Planned7,409 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
106≤2013'14'1540'16'17'18'1916'20'2118'22'2399'2454'25

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in United Kingdom by tracked capacity, MW
Apatura2,100 MW
QTS720 MW
ILI Group600 MW
Equinix250 MW
CSE52240 MW

OperationalUnder construction or planned

Capacity by market in United Kingdom, MW
Scotland2,748 MW
London2,716 MW
Humber1,386 MW
North East England721 MW
Slough285 MW
Hertfordshire200 MW
Greater London165 MW
South Wales148 MW
North West England102 MW
Wiltshire55 MW

OperationalUnder construction or planned

Facilities by type
Colocation125
Hyperscale42
Edge25
Other5

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the United Kingdom data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 7 October 2026. Government sources are linked; the full source list comes with the Excel data.

A March 2026 parliamentary POSTnote states that the UK has around 450 large data centres (a techUK estimate) using about 2% of UK electricity (2.4 GW of capacity, a NESO estimate from July 2025), and that DSIT estimates of 2024 colocation capacity found London had more capacity than the other regions combined. UK Parliament, Parliamentary Office of Science and Technology (POSTnote 762)

Policy and incentives

On 12 September 2024 the UK government announced that data centres would be designated as Critical National Infrastructure, the first new designation since the Space and Defence sectors gained the status in 2015. Department for Science, Innovation and Technology (GOV.UK)

The Delivering AI Growth Zones policy paper of 13 November 2025 set out electricity discounts of up to £24/MWh in Scotland, £16/MWh in Cumbria and £14/MWh in the North East for data centres in AI Growth Zones, planned from April 2027 subject to legislative timetables. Department for Science, Innovation and Technology (GOV.UK)

Data centres have had a Climate Change Agreements umbrella agreement since 24 July 2014. It was amended in January 2022 to add a fifth target period, and in May 2022 to let facilities be added until 30 June 2022. GOV.UK (BEIS, now DESNZ)

Power and grid

Ofgem approved connections reform modification CMP434 (WACM2) on 15 April 2025, which introduced a 'first ready and needed, first connected' gated process for most new transmission connection applications; it was implemented on 10 June 2025. Ofgem

NESO stated that before connections reform the Great Britain connections queue had grown to over 700GW, with shovel-ready projects waiting up to 10 years for a connection. National Energy System Operator (NESO)

A DESNZ consultation published on 11 March 2026 stated that the queue for data centre connections was over 50GW at transmission alone, and that the transmission demand queue stood at 96GW at the end of June 2025. Department for Energy Security and Net Zero (GOV.UK)

On 29 July 2026 Ofgem opened a consultation, which closed in September 2026, proposing a data centre commitment fee and queue management milestones to reduce the number of non-viable projects in the connections queue. Ofgem

The Clean Power 2030 Action Plan defines its 2030 target as Great Britain generating enough clean power to meet total annual electricity demand, with clean sources producing at least 95% of Great Britain's generation in a typical weather year. Department for Energy Security and Net Zero (GOV.UK)

Land, zoning and sites

England's National Planning Policy Framework (paragraph 86(c)) says planning policies should identify suitable locations for uses such as laboratories, gigafactories, data centres, digital infrastructure, and freight and logistics. GOV.UK (MHCLG) – National Planning Policy Framework, chapter 6

SI 2026/13, made 7 January 2026 and in force 8 January 2026, adds data centres to the business or commercial projects that can be directed into the Nationally Significant Infrastructure Project consenting regime under the Planning Act 2008. legislation.gov.uk – Infrastructure Planning (Business or Commercial Projects) (Amendment) Regulations 2026

On 10 February 2025 the government said the first AI Growth Zone would be at Culham, Oxfordshire, and invited proposals for sites with large existing power connections of 500+ MW or a clear plan to increase energy capacity. GOV.UK (DSIT press release)

The government's AI Growth Zones collection lists zones announced for Oxfordshire (30 April 2025), the North East (16 September 2025), North Wales (13 November 2025), South Wales (20 November 2025) and Scotland (29 January 2026). GOV.UK (DSIT) – AI Growth Zones collection

The North Wales AI Growth Zone, confirmed on 13 November 2025, has a base at Prosperity Parc on Anglesey and another at Trawsfynydd in Gwynedd. GOV.UK (DSIT press release)

Demand and connectivity

A March 2026 parliamentary POSTnote says the UK has around 450 large data centres using about 2% of UK electricity (2.4 GW of capacity, NESO estimate, July 2025), and that London had more capacity than the other regions combined. UK Parliament POST – POSTnote 762: What are data centres and how sustainable are they?

Ofcom reported that, as of January 2026, full fibre was available to 82% of UK homes (24.9 million) and gigabit-capable broadband to 89% (27.1 million). Ofcom – Connected Nations update: Spring 2026

A September 2025 report by Parliament's Joint Committee on the National Security Strategy says around 64 subsea cables land in the UK, including 45 international systems, which carry 99% of UK international data traffic. UK Parliament JCNSS – Subsea telecommunications cables: resilience and crisis preparedness

Sustainability, water and climate

The Climate Change Act 2008, as amended in June 2019, requires the net UK carbon account for 2050 to be at least 100% lower than the 1990 baseline. legislation.gov.uk – Climate Change Act 2008, section 1

DESNZ's Digest of UK Energy Statistics 2026 reports that renewable sources supplied 52.1% of UK electricity generation in 2025. DESNZ – Digest of UK Energy Statistics (DUKES) 2026

POSTnote 762 (March 2026), citing a 2025 techUK operator survey, says around half of the data centres in England use water for cooling, and that planning authorities may ask for water impact assessments. UK Parliament POST – POSTnote 762

The Commons Environmental Audit Committee ran an inquiry into risks and opportunities to the sustainability of UK data centres, covering energy and water use and net zero; it closed to evidence on 6 April 2026 and held oral evidence sessions on 10 June and 1 July 2026. UK Parliament – Environmental Audit Committee inquiry

Operators in United Kingdom

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Equinix15—250 MW—
Pulsant1422.1 MW—2.2%
Digital Realty13———
Virtus Data Centres1196.9 MW145 MW9.5%
Stellanor11———
iomart11———
Ark Data Centres10275 MW314 MW27%
nLighten1079.3 MW—7.7%
CyrusOne768 MW108 MW6.6%
Colt DCS744.4 MW161 MW4.3%
Kao Data741.6 MW86.6 MW4.1%
Telehouse718 MW22 MW1.8%
Apatura7—2,100 MW—
NTT DATA584.3 MW—8.2%
Datum Datacentres4———
Vantage Data Centers3148 MW75 MW14%
DataVita341 MW—4%
Iron Mountain335.8 MW25 MW3.5%
Node43———
Yondr3—40 MW—
Global Switch3—40 MW—
Pure DC220 MW70 MW2%
Custodian Data Centres212 MW—1.2%
Microsoft2———
Latos Data Centres2———
Six Degrees2———
Google2—163 MW—
Amazon Web Services2—27 MW—
Gravity Edge120 MW—2%
Centersquare115 MW—1.5%
DataBank13.6 MW—0.4%
Elite UK REIT1—80 MW—
Ada Infrastructure1—210 MW—
Serverfarm1———
ILI Group1—600 MW—
Pure DC / SEGRO JV1—56 MW—
CSE521—240 MW—
Greystoke Land1—96 MW—
Volta Data Centres1———
Galaxy Data Centers1—15 MW—

Largest data center projects in United Kingdom

Under construction and planned facilities with a stated capacity, largest first. 332 MW under construction and 7,409 MW planned in total.

ProjectLocationStatusTypeCapacity
Elsham Tech ParkElsham Tech Park Ltd (Greystoke) Elsham Planned Hyperscale 1,000 MW
QTS CamboisQTS Blyth Planned Hyperscale 720 MW
Cato (Auchtertool)ILI Group Auchtertool Planned Hyperscale 600 MW
Ravenscraig AI Data CentreApatura Motherwell Planned Hyperscale 550 MW
Humber Tech ParkHumber Tech Park South Killingholme Planned Hyperscale 386 MW
SDC M40 Campus (Wapseys Wood)Slough Holdings UK Gerrards Cross Planned Hyperscale 300 MW
Apatura ColdstreamApatura Coldstream Planned Other 300 MW
Apatura Larbert (Glenbervie)Apatura Larbert Planned Hyperscale 300 MW
Westerhill Data Centre CampusApatura East Dunbartonshire Planned Other 300 MW
Equinix Hertfordshire CampusEquinix South Mimms Planned Hyperscale 250 MW
Freeport West Lothian Data Centre CampusApatura West Lothian Planned Other 250 MW
Ebbsfleet Datacentre CampusCSE52 Dartford Planned Hyperscale 240 MW

How United Kingdom compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom197541,025 MW7,741 MW
Germany18856933 MW4,386 MW
France5510322 MW1,413 MW
Sweden4117172 MW1,510 MW
Finland3616230 MW1,430 MW
Ireland391553 MW1,278 MW
Denmark301454.6 MW844 MW
Italy107170 MW693 MW
Russia11121466 MW375 MW
Netherlands10833217 MW414 MW
Norway22—350 MW
Spain211279.4 MW175 MW

Data center deals in United Kingdom

Our Deal Tracker lists 21 deals in United Kingdom since January 2026, with $25.60B in disclosed value.

  • Drax Group; Brookfield; Radiant → AI data centre at Drax Power Station (Phase 1 up to 100 MW, ~500 MW Phase 2, potentially >1 GW) JV / partnership · 100 MW
  • KDDI Corporation; Telehouse International Corporation of Europe → Inventory Estate, East India Dock, London (next to Telehouse London Docklands campus) Land / campus $294.0M
  • Volta Data Centres (Arcus Infrastructure Partners) → Reynolds House Manchester data center M&A · 1.5 MW
  • Third Point (lead), Nvidia, Apollo, Citadel and others → Nscale (AI cloud platform and data center operator) Financing $3.36B
  • Consortium of 13 banks incl. Standard Chartered, BNP Paribas, Crédit Agricole CIB, Société Générale → VIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough) Financing $3.24B
  • Unnamed neocloud operator → 14MW of AI-ready capacity at Green Mountain LON-East campus, Romford Land / campus · 14 MW

All United Kingdom deals in the Deal Tracker

Facilities

197 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Elsham Tech ParkElsham Tech Park Ltd (Greystoke) Elsham Planned 1,000 MW total — Trade press
QTS CamboisQTS Blyth Planned 720 MW total — Trade press
Cato (Auchtertool)ILI Group Auchtertool Planned 600 MW total — Trade press
Ravenscraig AI Data CentreApatura Motherwell Planned 550 MW total — Trade press
Humber Tech ParkHumber Tech Park South Killingholme Planned 386 MW IT — Trade press
Apatura ColdstreamApatura Coldstream Planned 300 MW total — Trade press
Apatura Larbert (Glenbervie)Apatura Larbert Planned 300 MW total — Trade press
SDC M40 Campus (Wapseys Wood)Slough Holdings UK Gerrards Cross Planned 300 MW IT — Operator / official
Westerhill Data Centre CampusApatura East Dunbartonshire Planned 300 MW total — Operator / official
Equinix Hertfordshire CampusEquinix South Mimms Planned 250 MW total — Operator / official
Freeport West Lothian Data Centre CampusApatura West Lothian Planned 250 MW total — Operator / official
Ebbsfleet Datacentre CampusCSE52
History
  1. Planned
  2. Planned
Dartford Planned 240 MW IT — Operator / official
Docklands CampusAda Infrastructure London Planned 210 MW IT — Operator / official
Apatura CumnockApatura Cumnock Planned 200 MW total — Trade press
Hilfield Park (former Mercure Hotel, Elstree)Ark Data Centres Elstree Planned 200 MW IT — Operator / official
Wester Hermiston Data Centre CampusApatura Edinburgh Planned 200 MW total — Operator / official
Google North Weald AirfieldGoogle
History
  1. Planned
  2. Planned
North Weald Bassett Planned 163 MW total — Trade press
Cardiff Campus (Newport)Vantage Data Centers
2 deals
  • ABS investors → Vantage Data Centers Cardiff campus (CWL11, CWL13) – EMEA ABS
  • Nebius → AI capacity at Vantage CWL1 campus, Newport (South Wales AI Growth Zone)
  • All deals in the Deal Tracker
Newport Operational 148 MW IT — Operator / official
CyrusOne LON6CyrusOne Cooling: Chilled water, dry coolers Iver Heath Planned 108 MW IT — Operator / official
Corscale Iver (Court Lane)Corscale Iver Planned 103 MW total — Operator / official
LHR CampusCloudHQ Didcot Planned 101 MW IT — Operator / official
Union ParkArk Data Centres Hayes Operational 99 MW IT 2024 Operator / official
Abbots Langley (Bedmond Road)Greystoke Land Abbots Langley Planned 96 MW total — Trade press
Canning Town hyperscale data centre (Newham)sineQN London Planned 80 MW IT — Trade press
Peel Park Blackpool data centreElite UK REIT Blackpool Planned 80 MW — Trade press
Saunderton CampusVirtus Data Centres
1 deal
  • Consortium of 13 banks incl. Standard Chartered, BNP Paribas, Crédit Agricole CIB, Société Générale → VIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough) US$3,239m
  • All deals in the Deal Tracker
Saunderton Planned 75 MW IT — Operator / official
Manor Farm Data Centre (Poyle)Manor Farm Propco
History
  1. Planned
  2. Planned
Slough Planned 72 MW IT — Operator / official
Pure DC London Brent Cross (LON01) Building 2Pure DC London Under construction 70 MW total — Operator / official
Pure DC London Park Royal (LON02)Pure DC / SEGRO JV London Planned 56 MW IT — Operator / official
Spring ParkArk Data Centres Corsham Operational 55 MW IT 2010 Operator / official
Vantage London (LHR1) campusVantage Data Centers London Planned 55 MW IT — Operator / official
Longcross ParkArk Data Centres
History
  1. Under construction
  2. Operational
Chertsey Operational 54 MW IT 2025 Operator / official
Cody ParkArk Data Centres Farnborough Operational 51 MW IT 2011 Operator / official
Alliance ParkArk Data Centres Ealing Under construction 50 MW IT — Operator / official
Nscale LoughtonNscale Loughton Under construction 50 MW total — Operator / official
London 7 (Hayes Digital Park)Colt DCS
History
  1. Planned
  2. Planned
Hayes Planned 48 MW IT — Operator / official
DataVita DV1 LanarkshireDataVita
1 deal
  • ING, ABN AMRO, Santander, Scottish National Investment Bank, Siemens Financial Services (lenders); National Wealth Fund (GBP 202m guarantee) → DataVita DV1 expansion and new DV3, North Lanarkshire AI Growth Zone
  • All deals in the Deal Tracker
Chapelhall Operational 40 MW total 2016 Operator / official
Global Switch London SouthGlobal Switch London Planned 40 MW IT — Operator / official
Yondr Slough Building 3Yondr
1 deal
Slough Under construction 40 MW IT — Trade press
KLON-04 (Harlow)Kao Data Harlow Planned 36 MW IT — Operator / official
Longcross Park LP02Ark Data Centres Chertsey Planned 36 MW IT — Trade press
London NorthColt DCS Welwyn Garden City Operational 35 MW IT — Operator / official
KMAN-01 (Manchester)Kao Data Stockport Planned 33 MW IT — Operator / official
LONDON19 (Slough)Virtus Data Centres
1 deal
  • Consortium of 13 banks incl. Standard Chartered, BNP Paribas, Crédit Agricole CIB, Société Générale → VIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough) US$3,239m
  • All deals in the Deal Tracker
Slough Planned 32.5 MW IT — Operator / official
NTT London 1NTT DATA Cooling: Hybrid Dagenham Operational 32 MW IT — Operator / official
London 5 (Hayes)Colt DCS Hayes Planned 31.5 MW IT — Operator / official
London 4 (Hayes)Colt DCS Hayes Under construction 31 MW IT — Operator / official
Ark Union Park UP4Ark Data Centres Hayes Planned 28 MW IT — Operator / official
AWS Swindon (Burderop)Amazon Web Services Swindon Planned 27 MW total — Trade press
Iron Mountain LON-2Iron Mountain Slough Operational 27 MW total — Operator / official

Get the data

Every data center in United Kingdom, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

Data Centers in United Kingdom: Capacity Sheet

197 facilities

Every tracked data center in United Kingdom with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in United Kingdom

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

United Kingdom

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in United Kingdom?

DC Market Insights tracks 197 data centers in United Kingdom as of November 2026: 133 operational, 10 under construction and 54 planned, run by 54 operators. The count grows as we verify more sites.

What is the data center capacity of United Kingdom?

Tracked operational capacity in United Kingdom is 1,025 MW, with 332 MW under construction and 7,409 MW planned. These totals use the capacity each source states (IT load where given) and cover 115 of 197 tracked facilities.

Which companies operate the most data center capacity in United Kingdom?

By tracked operational capacity, the largest operators in United Kingdom are Ark Data Centres (275 MW), Vantage Data Centers (148 MW) and Virtus Data Centres (96.9 MW).

Where are the data centers in United Kingdom located?

The largest clusters by tracked capacity are Scotland (13 facilities), London (91 facilities) and Humber (2 facilities). The map above shows every site.

Which new data centers are being built in United Kingdom?

We track 332 MW under construction and 7,409 MW planned. The largest projects are Elsham Tech Park (1,000 MW), QTS Cambois (720 MW) and Cato (Auchtertool) by ILI Group (600 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does United Kingdom have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See United Kingdom capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy