As of 27 November 2026, DC Market Insights tracks 13 government actions on data centers and power in Poland, 8 of them in force. We have found no moratorium or restriction on new data centers in force in Poland. 1 incentive scheme applies: Polish Investment Zone (PSI) support decisions available to data centers.

13Actions tracked
8In force
197 USD/MWhIndustrial power price
31.4%Renewable share of generation

Market snapshot

Poland power and policy: key facts

  • Industrial electricity price: 197 USD/MWh (2026). Rank 4 of 34 tracked countries, highest first.
  • Renewable share of electricity generation: 31.4% (2025). Rank 30 of 50 tracked countries, highest first.
  • Latest change: Capacity fee 2027: quarterly rates for non-household users (URE (Energy Regulatory Office), 30 Oct 2026).
  • By type: 4 plan or strategy, 3 power tariff, 2 efficiency rule and 1 incentive.

Power indicators for Poland

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 197 USD/MWh 2026 · Eurostat nrg_pc_205, non-household band IE (20,000-69,999 MWh/yr), 2026-S1, excl. VAT and recoverable taxes 0.1687 EUR/kWh = 168.7 EUR/MWh x ECB average USD/EUR Jan-Jun 2026 1.1671 (monthly 1.1738/1.1824/1.1558/1.1706/1.1673/1.1518) = 196.9 USD/MWh; excl. Eurostat nrg_pc_205 (API, updated 2026-10-19)
Renewable share of electricity generation 31.4% 2025 · Share of renewables in electricity generated in Poland, 2025 (Ministry of Climate, 17 Feb 2026) gov.pl Ministry of Climate and Environment
Peak electricity demand 27.6 GW 2025 · 27,550 MW maximum demand in 2025 (URE National Report 2026) URE Raport Krajowy 2026
Installed generation capacity 77.3 GW 2025 · 77,331 MW installed in the national power system in 2025 (URE National Report 2026) URE Raport Krajowy 2026

In force now in Poland

Grid access (1)

  • Grid accessIn force

    Energy Law amendment of 13 March 2026: grid connection reform

    Act of 13 March 2026 amending the Energy Law (Dz.U. 2026 poz. 516, published 15 Apr 2026). Advance payment for connection conditions above 1 kV set at PLN 60 per kW of requested connection capacity; system operators may sign flexible connection agreements where full connection needs grid expansion; connection agreements lapse if the applicant does not obtain a final building permit in time (24 months for most installations); cable pooling at one connection point above 1 kV. Applies to large loads such as data centers.

    Sejm / Ministry of Energy · Effective 30 Apr 2026 · Dziennik Ustaw 2026 poz. 516

Power tariff (2)

  • Power tariffIn force

    Lower quality fee for the largest energy-intensive consumers (odbiorca specjalny)

    Amendment to the tariff regulation (Dec 2025) cuts the grid quality fee for special customers connected at 110 kV or above that take at least 200 GWh a year for own use, use at least 50% of contracted capacity and whose electricity cost is at least 15% of production value (e.g. Tauron 2026: PLN 3.27/MWh vs 33.06). Data centers are not named; eligibility of large data centers not confirmed.

    Ministry of Energy · Effective 1 Jan 2026 · gov.pl: Najwięksi energochłonni odbiorcy energii zapłacą niższą opłatę jakościową

  • Power tariffIn force

    Capacity fee (opłata mocowa) 2026: flat rate for non-household users

    URE set the 2026 capacity fee for non-household final users at PLN 0.2194/kWh net, charged on energy taken in the 15 working-day hours 07:00-22:00, from 1 Jan to 31 Dec 2026; no profile groups.

    URE (Energy Regulatory Office) · Effective 1 Jan 2026 · Informacja Prezesa URE nr 58/2025

Incentive (1)

  • IncentiveIn force

    Polish Investment Zone (PSI) support decisions available to data centers

    In its reply to interpellation 17787 the Ministry of Development and Technology states that building or expanding a data center is eligible for Polish Investment Zone support decisions (income tax exemption) and for grant programmes, and that several decisions have already been issued for data center projects. Key siting factors named: high-capacity power connections and water for cooling.

    Ministry of Development and Technology · Sejm: reply to interpellation no. 17787

Renewable energy (1)

  • Renewable energyIn force

    Direct line (linia bezpośrednia) liberalisation

    Energy Law amendment (Dz.U. 2023 poz. 1681) ends the need for the URE President's consent to build a direct line from a generator to a consumer: notification and entry in the URE register are enough; surplus may be fed into the grid and direct-line users who rely on the grid pay a solidarity fee. Makes on-site or adjacent renewable supply to large consumers such as data centers easier.

    Sejm / Ministry of Development and Technology; register kept by URE · Effective 7 Sep 2023 · gov.pl: Łatwiejsza budowa i wykorzystanie linii bezpośrednich

Efficiency rule (1)

  • Efficiency ruleIn force

    Data center energy performance reporting for 500 kW+ IT load (EU Delegated Regulation 2024/1364)

    Owners and operators of data centers with installed IT power demand of at least 500 kW must report energy performance indicators to the EU database each year by 15 May for the previous year (first report 15 Sep 2024). The Ministry of Climate and Environment points operators to the EU reporting; Poland has no separate national system.

    Ministry of Climate and Environment (EU EED Art. 12) · Effective 15 Sep 2024 · gov.pl: Centra przetwarzania danych

Regulation (1)

  • RegulationIn force

    National Cybersecurity System (KSC) amendment transposing NIS2

    Act of 23 January 2026 (Dz.U. 2026 poz. 252) replaces operators of essential services and digital service providers with key and important entities; digital infrastructure, which under NIS2 includes data center service providers, is a key sector. In force 3 April 2026.

    Ministry of Digital Affairs · Effective 3 Apr 2026 · gov.pl: Nowelizacja ustawy o KSC – kogo obejmuje

Plan or strategy (1)

  • Plan or strategyIn force

    Digital State Strategy (Strategia Cyfryzacji Państwa)

    Adopted by Council of Ministers Resolution No. 130 of 9 June 2026 (Monitor Polski 2026 poz. 620). Its analysis calls Poland's modern data center sector small and lists energy costs, emissions, regulatory costs and local opposition as factors that reduce the attractiveness of data center investment.

    Council of Ministers / Ministry of Digital Affairs · Effective 18 Jun 2026 · Monitor Polski 2026 poz. 620

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Power tariffAnnounced

    Capacity fee 2027: quarterly rates for non-household users

    URE published 2027 capacity fee rates for non-household users, set per quarter for the first time to reward load management: PLN 0.1925 (Q1), 0.2141 (Q2), 0.1984 (Q3) and 0.1950 (Q4) per kWh, all lower than the 2026 rate of 0.2194; charged on energy taken 07:00-22:00 on working days.

    URE (Energy Regulatory Office) · Effective 1 Jan 2027 · URE: Stawki opłaty mocowej na rok 2027

  • Plan or strategyAnnounced

    Government resolution backing the Baltic AI Gigafactory bid

    Council of Ministers resolution lets Poland join the EuroHPC AI Gigafactories call by guaranteeing purchases of AI compute (EUR 100m over 2028-2033, matched by the EU; over PLN 400m in total). The planned facility would start with at least 25,000 H100-equivalent accelerators and grow to 75,000; a private consortium would invest. No site chosen yet.

    Council of Ministers / Ministry of Digital Affairs · gov.pl: Uchwała rządu – droga do gigafabryki AI otwarta

  • Efficiency ruleProposed

    Draft Energy Law amendment UC121: waste-heat cost-benefit analysis for data centers above 1 MW

    Ministry of Energy draft of 15 May 2026 transposing EU Directive 2023/1791: data centers with total rated input power above 1 MW would have to carry out a cost-benefit analysis of using their waste heat, unless shown to be technically or economically infeasible. Draft only; read in a consultation copy hosted by Związek Powiatów Polskich.

    Ministry of Energy

  • Plan or strategyProposed

    PSE draft Transmission Network Development Plan 2027-2036 with data center demand forecast

    The TSO's draft development plan (consultation version, January 2026) treats data centers as one of the fastest-growing consumer groups and forecasts data center demand rising from about 200 MW in 2024 to 3,093 MW in 2036 and 5,018 MW (29.4 TWh) in 2040, based on connection applications; Warsaw, Poznań, Kraków and Wrocław are named as the main locations. Document dated January 2026, day not stated.

    PSE S.A. (transmission system operator)

  • Plan or strategyAnnounced

    Gaia AI Factory in Kraków (second Polish EuroHPC AI Factory, after PIAST AI in Poznań)

    Poland's second EuroHPC AI Factory, Gaia AI Factory at Cyfronet AGH in Kraków, has a budget of about PLN 300m (EUR 70m), co-funded 50/50 by Poland and the European Commission, for a supercomputer with more than 1,000 GPUs. The first Polish AI Factory is PIAST AI in Poznań (PCSS).

    Ministry of Digital Affairs · gov.pl: Druga w Polsce fabryka AI powstanie w Krakowie

Timeline of data center and power policy in Poland

DateActionTypeStatusAuthority
30 Oct 2026Capacity fee 2027: quarterly rates for non-household usersPower tariffAnnouncedURE (Energy Regulatory Office)
14 Jul 2026Government resolution backing the Baltic AI Gigafactory bidPlan or strategyAnnouncedCouncil of Ministers / Ministry of Digital Affairs
8 Jul 2026Polish Investment Zone (PSI) support decisions available to data centersIncentiveIn forceMinistry of Development and Technology
9 Jun 2026Digital State Strategy (Strategia Cyfryzacji Państwa)Plan or strategyIn forceCouncil of Ministers / Ministry of Digital Affairs
15 May 2026Draft Energy Law amendment UC121: waste-heat cost-benefit analysis for data centers above 1 MWEfficiency ruleProposedMinistry of Energy
13 Mar 2026Energy Law amendment of 13 March 2026: grid connection reformGrid accessIn forceSejm / Ministry of Energy
23 Jan 2026National Cybersecurity System (KSC) amendment transposing NIS2RegulationIn forceMinistry of Digital Affairs
1 Jan 2026PSE draft Transmission Network Development Plan 2027-2036 with data center demand forecastPlan or strategyProposedPSE S.A. (transmission system operator)
12 Dec 2025Lower quality fee for the largest energy-intensive consumers (odbiorca specjalny)Power tariffIn forceMinistry of Energy
30 Oct 2025Capacity fee (opłata mocowa) 2026: flat rate for non-household usersPower tariffIn forceURE (Energy Regulatory Office)
10 Oct 2025Gaia AI Factory in Kraków (second Polish EuroHPC AI Factory, after PIAST AI in Poznań)Plan or strategyAnnouncedMinistry of Digital Affairs
6 Jun 2024Data center energy performance reporting for 500 kW+ IT load (EU Delegated Regulation 2024/1364)Efficiency ruleIn forceMinistry of Climate and Environment (EU EED Art. 12)
28 Jul 2023Direct line (linia bezpośrednia) liberalisationRenewable energyIn forceSejm / Ministry of Development and Technology; register kept by URE

How Poland compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Costa Rica—98.6% (2025)0.04 kgCO2/kWh (2025)11
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Israel—14.6% (2024)0.41 kgCO2/kWh (2024)10
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Morocco—27% (2024)—00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
New Zealand—88.5% (2025)0.08 kgCO2/kWh (2025)00
Nigeria154 USD/MWh (2026)32.7% (2025)—01
Norway100 USD/MWh (2026)96% (2025)0.01 kgCO2/kWh (2025)10
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Poland197 USD/MWh (2026)31.4% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Poland?

We have found no moratorium or restriction on new data centers in force in Poland as of 27 November 2026. Proposed or announced measures, if any, are listed in the timeline.

What incentives does Poland offer data centers?

In force: Polish Investment Zone (PSI) support decisions available to data centers. Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Poland?

The industrial electricity price in Poland was 197 USD/MWh in 2026 (Eurostat nrg_pc_205, non-household band IE (20,000-69,999 MWh/yr), 2026-S1, excl. VAT and recoverable taxes 0.1687 EUR/kWh = 168.7 EUR/MWh x ECB average USD/EUR Jan-Jun 2026 1.1671 (monthly 1.1738/1.1824/1.1558/1.1706/1.1673/1.1518) = 196.9 USD/MWh; excl.). Data center contracts can differ by voltage level, contract length and location.

How much of Poland’s electricity is renewable?

Renewables supplied 31.4% of electricity generation in Poland in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst