Data Center Power & Policy in Vietnam
Every government action on data centers and power in Vietnam that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 27 November 2026, DC Market Insights tracks 16 government actions on data centers and power in Vietnam, 15 of them in force. Vietnam has 1 restriction on new data centers in force: Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law. 1 incentive scheme applies: Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives.
Market snapshot
Vietnam power and policy: key facts
- Industrial electricity price: 69.9 USD/MWh (2026). Rank 29 of 35 tracked countries, highest first.
- Latest change: Average retail tariff cut 2% to 2,159.9037 VND/kWh (Decision 2892/QD-BCT), 1 Nov 2026 (Ministry of Industry and Trade / EVN, 31 Oct 2026).
- By type: 5 regulation, 3 power tariff, 2 grid access and 2 plan or strategy.
Power indicators for Vietnam
Latest official figure for each indicator, with earlier years where we have them.
In force now in Vietnam
Restriction (1)
Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law
Issued on 15 Aug 2022 and in force from 1 Oct 2022. Covered businesses must store certain data in Vietnam: personal information of service users in Vietnam, data that users in Vietnam create, and data on users' relationships. Storage runs from receipt of a storage request until the request ends, with a minimum of 24 months.
24 months Minimum data storage period in Vietnam
Grid access (2)
Decree 243/2026/ND-CP: data center operators named as eligible large consumers for DPPA; rooftop solar surplus cap raised to 50%
Issued and in force on 26 Jun 2026, amending Decrees 57/2025 and 58/2025. The large-consumer categories eligible for direct power purchase now explicitly include customers using electricity to run data centers, alongside production customers and EV charging. Eligibility requires buying at 22 kV or above, with average monthly consumption over the last 12 months at or above a level set by MOIT. Surplus sales from rooftop solar may reach 50% of output, up from 20%.
50 % of rooftop solar output Cap on rooftop solar surplus sold to the grid (previously 20%)
Decree 57/2025/ND-CP: direct power purchase (DPPA) between renewable generators and large consumers
Government decree dated 3 Mar 2025 and effective on signing. It sets the mechanism for direct electricity trading between renewable generators and large electricity consumers. Art. 3(10) defines a large consumer by its capacity and consumption, and leaves the threshold to the Minister of Industry and Trade. Decree 243/2026/ND-CP amended it.
Power tariff (2)
Average retail tariff cut 2% to 2,159.9037 VND/kWh (Decision 2892/QD-BCT), 1 Nov 2026
MOIT Decision 2892/QD-BCT of 31 Oct 2026 set a new retail schedule and EVN cut the average retail electricity price by 2% to 2,159.9037 VND/kWh, excluding VAT, from 1 Nov 2026. Production customers at 220 kV and above pay 1,771 VND/kWh normal hours, 1,101 off-peak and 3,110 peak; above 35 kV to below 220 kV 1,792, 1,123 and 3,218 (press reports of the schedule).
2,159.9 VND/kWh Average retail price excluding VAT
Decision 14/2025/QD-TTg on the retail electricity tariff structure (replaces Decision 28/2014)
Prime Minister's decision of 29 May 2025 that sets the structure of the retail tariff, including voltage tiers (high voltage above 35 kV, medium 1-35 kV, low up to 1 kV) and reduces the household tariff to 5 tiers. It replaces Decision 28/2014/QD-TTg and applies from the first average-price adjustment after it takes effect. Tier prices may vary by plus or minus 2% from the appendix percentages.
Incentive (1)
Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives
The National Assembly passed this law on 14 Jun 2025. It takes effect on 1 Jan 2026, with some provisions in force from 1 Jul 2025. Art. 21(2)(d) lists data centers as shared digital infrastructure that gets priority for state budget funding. Art. 28(2) makes investment in building AI data centers a sector with special investment incentives. Art. 28(3)-(5) give large AI data center projects tax and land incentives, possible direct state support for plant and technical infrastructure costs, and customs priority.
Renewable energy (1)
Decree 58/2025/ND-CP: renewable and new energy development, including self-consumption rooftop solar (replaces Decree 135/2024)
Decree dated 3 Mar 2025 that details the Electricity Law on renewable and new energy, including self-produced, self-consumed rooftop solar. It took effect on 3 Mar 2025, when Decree 135/2024/ND-CP on self-consumption rooftop solar ceased to apply. Decree 243/2026 later raised its surplus sale cap from 20% to 50%.
Efficiency rule (1)
Information and Communications Infrastructure Master Plan 2021-2030 (Decision 36/QD-TTg): data center targets, PUE 1.4 or less
Signed on 11 Jan 2024. By 2025: data centers meeting international green standards, with PUE of new data centers no higher than 1.4; at least 2 national data centers (about 70,000 m2 and about 79 MW); at least 3 national multi-purpose data center clusters; and 1-2 regional data centers near financial centers. National data centers are to be sited first in the key economic regions.
1.4 PUE (maximum) Maximum PUE for newly built data centers
Regulation (5)
Law on Personal Data Protection No. 91/2025/QH15
Passed on 26 Jun 2025 and in force from 1 Jan 2026. Under Art. 20, anyone transferring personal data stored in Vietnam to a storage system outside the country must prepare a cross-border transfer impact assessment dossier within 60 days of the first transfer. Dossiers already filed under Decree 13/2023 can still be used (Art. 39).
60 days Deadline to prepare the cross-border transfer impact dossier
Decree 163/2024/ND-CP guiding the Telecommunications Law (data center and cloud services)
Government decree dated 24 Dec 2024 that implements the 2023 Telecommunications Law. It sets the information that data center and cloud providers must collect from customers, with retention periods following cybersecurity law (Art. 28). It also sets rules for foreign organisations providing data center and cloud services across the border, including a notification requirement (Arts. 29 and 45).
Electricity Law No. 61/2024/QH15
The amended Electricity Law, passed on 30 Nov 2024 and in force from 1 Feb 2025. It adds a two-part tariff (capacity price and energy price), pricing methods for transmission grids built by non-state investors, and new sections on renewable and new energy, including offshore wind.
Law on Data No. 60/2024/QH15
Passed on 30 Nov 2024 and in force from 1 Jul 2025. National databases must use the infrastructure of the National Data Center (Art. 30(2)). Art. 23 regulates cross-border transfer and processing of core and important data, including moving data stored in Vietnam to storage systems abroad, and leaves the detailed rules to the Government.
Law on Telecommunications No. 24/2023/QH15: data center services (no foreign ownership cap)
Passed on 24 Nov 2023 and in force from 1 Jul 2024. The law defines data center service as a telecom service that provides processing, storage and retrieval of information (Art. 3(9)). Under Art. 29, investors in data center and cloud services face no limit on share ownership, and providers are not liable for users' content while processing it. Before a data center is used commercially, the provider must publish its conformity with technical standards set by the Minister of Information and Communications.
Plan or strategy (2)
Revised Power Development Plan VIII (Decision 768/QD-TTg)
The Prime Minister approved the revised PDP8 on 15 Apr 2025. Domestic-serving capacity is planned at 183,291-236,363 MW by 2030, with solar at 46,459-73,416 MW, batteries at 10,000-16,300 MW and offshore wind at about 6,000-17,032 MW for 2030-2035. The MOIT summary does not mention data centers.
National Data Center Project (Resolution 175/NQ-CP)
Government resolution of 30 Oct 2023 approving the National Data Center project. National Data Center No. 01 is in Hoa Lac Hi-Tech Park, Hanoi, with about 150,000 m2 of construction area, a 300-rack specialised-area data center and a 1,000-rack shared-area data center. Basic construction of its infrastructure was due by end-2025.
Timeline of data center and power policy in Vietnam
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 31 Oct 2026 | Average retail tariff cut 2% to 2,159.9037 VND/kWh (Decision 2892/QD-BCT), 1 Nov 2026 | Power tariff | In force | Ministry of Industry and Trade / EVN |
| 26 Jun 2026 | Decree 243/2026/ND-CP: data center operators named as eligible large consumers for DPPA; rooftop solar surplus cap raised to 50% | Grid access | In force | Government of Vietnam |
| 26 Jun 2025 | Law on Personal Data Protection No. 91/2025/QH15 | Regulation | In force | National Assembly of Vietnam |
| 14 Jun 2025 | Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives | Incentive | In force | National Assembly of Vietnam |
| 29 May 2025 | Decision 14/2025/QD-TTg on the retail electricity tariff structure (replaces Decision 28/2014) | Power tariff | In force | Prime Minister of Vietnam |
| 9 May 2025 | Average retail tariff raised 4.8% to 2,204.0655 VND/kWh (Decision 1279/QD-BCT), 10 May 2025 | Power tariff | Expired | Vietnam Electricity (EVN) / Ministry of Industry and Trade |
| 15 Apr 2025 | Revised Power Development Plan VIII (Decision 768/QD-TTg) | Plan or strategy | In force | Prime Minister of Vietnam |
| 3 Mar 2025 | Decree 58/2025/ND-CP: renewable and new energy development, including self-consumption rooftop solar (replaces Decree 135/2024) | Renewable energy | In force | Government of Vietnam |
| 3 Mar 2025 | Decree 57/2025/ND-CP: direct power purchase (DPPA) between renewable generators and large consumers | Grid access | In force | Government of Vietnam |
| 24 Dec 2024 | Decree 163/2024/ND-CP guiding the Telecommunications Law (data center and cloud services) | Regulation | In force | Government of Vietnam |
| 30 Nov 2024 | Electricity Law No. 61/2024/QH15 | Regulation | In force | National Assembly of Vietnam |
| 30 Nov 2024 | Law on Data No. 60/2024/QH15 | Regulation | In force | National Assembly of Vietnam |
| 11 Jan 2024 | Information and Communications Infrastructure Master Plan 2021-2030 (Decision 36/QD-TTg): data center targets, PUE 1.4 or less | Efficiency rule | In force | Prime Minister of Vietnam |
| 24 Nov 2023 | Law on Telecommunications No. 24/2023/QH15: data center services (no foreign ownership cap) | Regulation | In force | National Assembly of Vietnam |
| 30 Oct 2023 | National Data Center Project (Resolution 175/NQ-CP) | Plan or strategy | In force | Government of Vietnam |
| 15 Aug 2022 | Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law | Restriction | In force | Government of Vietnam |
How Vietnam compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Costa Rica | — | 98.6% (2025) | 0.04 kgCO2/kWh (2025) | 1 | 1 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Israel | — | 14.6% (2024) | 0.41 kgCO2/kWh (2024) | 1 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| New Zealand | — | 88.5% (2025) | 0.08 kgCO2/kWh (2025) | 0 | 0 |
| Nigeria | 154 USD/MWh (2026) | 32.7% (2025) | — | 0 | 1 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Poland | 197 USD/MWh (2026) | 31.4% (2025) | — | 0 | 1 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
| Vietnam | 69.9 USD/MWh (2026) | — | — | 1 | 1 |
Questions
Is there a data center moratorium in Vietnam?
Yes. 1 restriction on new data centers is in force in Vietnam: Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law.
What incentives does Vietnam offer data centers?
In force: Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives. Each is listed with its authority and dates on this page.
What does electricity cost for data centers in Vietnam?
The industrial electricity price in Vietnam was 69.9 USD/MWh in 2026 (1,792 VND/kWh, production customers above 35 kV to below 220 kV, normal hours, excl. VAT, from 1 Nov 2026 (MOIT Decision 2892/QD-BCT as reported by SGGP); converted at SBV central rate 25,646 VND/USD on 19 Nov 2026: 1,792/25,646 x 1000 = 69.87 USD/MWh. En). Data center contracts can differ by voltage level, contract length and location.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.