Proprietary data

Data Center Power & Policy in Vietnam

Every government action on data centers and power in Vietnam that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 27 November 2026, DC Market Insights tracks 16 government actions on data centers and power in Vietnam, 15 of them in force. Vietnam has 1 restriction on new data centers in force: Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law. 1 incentive scheme applies: Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives.

16Actions tracked
15In force
69.9 USD/MWhIndustrial power price
—Renewable share of generation

Market snapshot

Vietnam power and policy: key facts

  • Industrial electricity price: 69.9 USD/MWh (2026). Rank 29 of 35 tracked countries, highest first.
  • Latest change: Average retail tariff cut 2% to 2,159.9037 VND/kWh (Decision 2892/QD-BCT), 1 Nov 2026 (Ministry of Industry and Trade / EVN, 31 Oct 2026).
  • By type: 5 regulation, 3 power tariff, 2 grid access and 2 plan or strategy.

Power indicators for Vietnam

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 69.9 USD/MWh 2026 · 1,792 VND/kWh, production customers above 35 kV to below 220 kV, normal hours, excl. VAT, from 1 Nov 2026 (MOIT Decision 2892/QD-BCT as reported by SGGP); converted at SBV central rate 25,646 VND/USD on 19 Nov 2026: 1,792/25,646 x 1000 = 69.87 USD/MWh. En
Peak electricity demand 54.4 GW 2025 · Pmax 54,370 MW in 2025, up 11.1% year on year (EVN, 30 Dec 2025) EVN (en.evn.com.vn)
Installed generation capacity 87.6 GW 2025 · About 87,600 MW at end-2025, excluding imports (EVN, 30 Dec 2025) EVN (en.evn.com.vn)

In force now in Vietnam

Restriction (1)

  • RestrictionIn force

    Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law

    Issued on 15 Aug 2022 and in force from 1 Oct 2022. Covered businesses must store certain data in Vietnam: personal information of service users in Vietnam, data that users in Vietnam create, and data on users' relationships. Storage runs from receipt of a storage request until the request ends, with a minimum of 24 months.

    24 months Minimum data storage period in Vietnam

    Government of Vietnam · Effective 1 Oct 2022

Grid access (2)

  • Grid accessIn force

    Decree 243/2026/ND-CP: data center operators named as eligible large consumers for DPPA; rooftop solar surplus cap raised to 50%

    Issued and in force on 26 Jun 2026, amending Decrees 57/2025 and 58/2025. The large-consumer categories eligible for direct power purchase now explicitly include customers using electricity to run data centers, alongside production customers and EV charging. Eligibility requires buying at 22 kV or above, with average monthly consumption over the last 12 months at or above a level set by MOIT. Surplus sales from rooftop solar may reach 50% of output, up from 20%.

    50 % of rooftop solar output Cap on rooftop solar surplus sold to the grid (previously 20%)

    Government of Vietnam · Effective 26 Jun 2026

  • Grid accessIn force

    Decree 57/2025/ND-CP: direct power purchase (DPPA) between renewable generators and large consumers

    Government decree dated 3 Mar 2025 and effective on signing. It sets the mechanism for direct electricity trading between renewable generators and large electricity consumers. Art. 3(10) defines a large consumer by its capacity and consumption, and leaves the threshold to the Minister of Industry and Trade. Decree 243/2026/ND-CP amended it.

    Government of Vietnam · Effective 3 Mar 2025

Power tariff (2)

  • Power tariffIn force

    Average retail tariff cut 2% to 2,159.9037 VND/kWh (Decision 2892/QD-BCT), 1 Nov 2026

    MOIT Decision 2892/QD-BCT of 31 Oct 2026 set a new retail schedule and EVN cut the average retail electricity price by 2% to 2,159.9037 VND/kWh, excluding VAT, from 1 Nov 2026. Production customers at 220 kV and above pay 1,771 VND/kWh normal hours, 1,101 off-peak and 3,110 peak; above 35 kV to below 220 kV 1,792, 1,123 and 3,218 (press reports of the schedule).

    2,159.9 VND/kWh Average retail price excluding VAT

    Ministry of Industry and Trade / EVN · Effective 1 Nov 2026

  • Power tariffIn force

    Decision 14/2025/QD-TTg on the retail electricity tariff structure (replaces Decision 28/2014)

    Prime Minister's decision of 29 May 2025 that sets the structure of the retail tariff, including voltage tiers (high voltage above 35 kV, medium 1-35 kV, low up to 1 kV) and reduces the household tariff to 5 tiers. It replaces Decision 28/2014/QD-TTg and applies from the first average-price adjustment after it takes effect. Tier prices may vary by plus or minus 2% from the appendix percentages.

    Prime Minister of Vietnam

Incentive (1)

  • IncentiveIn force

    Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives

    The National Assembly passed this law on 14 Jun 2025. It takes effect on 1 Jan 2026, with some provisions in force from 1 Jul 2025. Art. 21(2)(d) lists data centers as shared digital infrastructure that gets priority for state budget funding. Art. 28(2) makes investment in building AI data centers a sector with special investment incentives. Art. 28(3)-(5) give large AI data center projects tax and land incentives, possible direct state support for plant and technical infrastructure costs, and customs priority.

    National Assembly of Vietnam · Effective 1 Jan 2026

Renewable energy (1)

  • Renewable energyIn force

    Decree 58/2025/ND-CP: renewable and new energy development, including self-consumption rooftop solar (replaces Decree 135/2024)

    Decree dated 3 Mar 2025 that details the Electricity Law on renewable and new energy, including self-produced, self-consumed rooftop solar. It took effect on 3 Mar 2025, when Decree 135/2024/ND-CP on self-consumption rooftop solar ceased to apply. Decree 243/2026 later raised its surplus sale cap from 20% to 50%.

    Government of Vietnam · Effective 3 Mar 2025 · EVN (en.evn.com.vn)

Efficiency rule (1)

  • Efficiency ruleIn force

    Information and Communications Infrastructure Master Plan 2021-2030 (Decision 36/QD-TTg): data center targets, PUE 1.4 or less

    Signed on 11 Jan 2024. By 2025: data centers meeting international green standards, with PUE of new data centers no higher than 1.4; at least 2 national data centers (about 70,000 m2 and about 79 MW); at least 3 national multi-purpose data center clusters; and 1-2 regional data centers near financial centers. National data centers are to be sited first in the key economic regions.

    1.4 PUE (maximum) Maximum PUE for newly built data centers

    Prime Minister of Vietnam

Regulation (5)

  • RegulationIn force

    Law on Personal Data Protection No. 91/2025/QH15

    Passed on 26 Jun 2025 and in force from 1 Jan 2026. Under Art. 20, anyone transferring personal data stored in Vietnam to a storage system outside the country must prepare a cross-border transfer impact assessment dossier within 60 days of the first transfer. Dossiers already filed under Decree 13/2023 can still be used (Art. 39).

    60 days Deadline to prepare the cross-border transfer impact dossier

    National Assembly of Vietnam · Effective 1 Jan 2026

  • RegulationIn force

    Decree 163/2024/ND-CP guiding the Telecommunications Law (data center and cloud services)

    Government decree dated 24 Dec 2024 that implements the 2023 Telecommunications Law. It sets the information that data center and cloud providers must collect from customers, with retention periods following cybersecurity law (Art. 28). It also sets rules for foreign organisations providing data center and cloud services across the border, including a notification requirement (Arts. 29 and 45).

    Government of Vietnam · Effective 24 Dec 2024

  • RegulationIn force

    Electricity Law No. 61/2024/QH15

    The amended Electricity Law, passed on 30 Nov 2024 and in force from 1 Feb 2025. It adds a two-part tariff (capacity price and energy price), pricing methods for transmission grids built by non-state investors, and new sections on renewable and new energy, including offshore wind.

    National Assembly of Vietnam · Effective 1 Feb 2025 · Ministry of Industry and Trade (moit.gov.vn)

  • RegulationIn force

    Law on Data No. 60/2024/QH15

    Passed on 30 Nov 2024 and in force from 1 Jul 2025. National databases must use the infrastructure of the National Data Center (Art. 30(2)). Art. 23 regulates cross-border transfer and processing of core and important data, including moving data stored in Vietnam to storage systems abroad, and leaves the detailed rules to the Government.

    National Assembly of Vietnam · Effective 1 Jul 2025

  • RegulationIn force

    Law on Telecommunications No. 24/2023/QH15: data center services (no foreign ownership cap)

    Passed on 24 Nov 2023 and in force from 1 Jul 2024. The law defines data center service as a telecom service that provides processing, storage and retrieval of information (Art. 3(9)). Under Art. 29, investors in data center and cloud services face no limit on share ownership, and providers are not liable for users' content while processing it. Before a data center is used commercially, the provider must publish its conformity with technical standards set by the Minister of Information and Communications.

    National Assembly of Vietnam · Effective 1 Jul 2024 · Binh Phuoc Provincial Portal (official text of Law 24/2023/QH15)

Plan or strategy (2)

  • Plan or strategyIn force

    Revised Power Development Plan VIII (Decision 768/QD-TTg)

    The Prime Minister approved the revised PDP8 on 15 Apr 2025. Domestic-serving capacity is planned at 183,291-236,363 MW by 2030, with solar at 46,459-73,416 MW, batteries at 10,000-16,300 MW and offshore wind at about 6,000-17,032 MW for 2030-2035. The MOIT summary does not mention data centers.

    Prime Minister of Vietnam · Effective 15 Apr 2025 · Ministry of Industry and Trade (moit.gov.vn)

  • Plan or strategyIn force

    National Data Center Project (Resolution 175/NQ-CP)

    Government resolution of 30 Oct 2023 approving the National Data Center project. National Data Center No. 01 is in Hoa Lac Hi-Tech Park, Hanoi, with about 150,000 m2 of construction area, a 300-rack specialised-area data center and a 1,000-rack shared-area data center. Basic construction of its infrastructure was due by end-2025.

    Government of Vietnam · Effective 30 Oct 2023

Timeline of data center and power policy in Vietnam

DateActionTypeStatusAuthority
31 Oct 2026Average retail tariff cut 2% to 2,159.9037 VND/kWh (Decision 2892/QD-BCT), 1 Nov 2026Power tariffIn forceMinistry of Industry and Trade / EVN
26 Jun 2026Decree 243/2026/ND-CP: data center operators named as eligible large consumers for DPPA; rooftop solar surplus cap raised to 50%Grid accessIn forceGovernment of Vietnam
26 Jun 2025Law on Personal Data Protection No. 91/2025/QH15RegulationIn forceNational Assembly of Vietnam
14 Jun 2025Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentivesIncentiveIn forceNational Assembly of Vietnam
29 May 2025Decision 14/2025/QD-TTg on the retail electricity tariff structure (replaces Decision 28/2014)Power tariffIn forcePrime Minister of Vietnam
9 May 2025Average retail tariff raised 4.8% to 2,204.0655 VND/kWh (Decision 1279/QD-BCT), 10 May 2025Power tariffExpiredVietnam Electricity (EVN) / Ministry of Industry and Trade
15 Apr 2025Revised Power Development Plan VIII (Decision 768/QD-TTg)Plan or strategyIn forcePrime Minister of Vietnam
3 Mar 2025Decree 58/2025/ND-CP: renewable and new energy development, including self-consumption rooftop solar (replaces Decree 135/2024)Renewable energyIn forceGovernment of Vietnam
3 Mar 2025Decree 57/2025/ND-CP: direct power purchase (DPPA) between renewable generators and large consumersGrid accessIn forceGovernment of Vietnam
24 Dec 2024Decree 163/2024/ND-CP guiding the Telecommunications Law (data center and cloud services)RegulationIn forceGovernment of Vietnam
30 Nov 2024Electricity Law No. 61/2024/QH15RegulationIn forceNational Assembly of Vietnam
30 Nov 2024Law on Data No. 60/2024/QH15RegulationIn forceNational Assembly of Vietnam
11 Jan 2024Information and Communications Infrastructure Master Plan 2021-2030 (Decision 36/QD-TTg): data center targets, PUE 1.4 or lessEfficiency ruleIn forcePrime Minister of Vietnam
24 Nov 2023Law on Telecommunications No. 24/2023/QH15: data center services (no foreign ownership cap)RegulationIn forceNational Assembly of Vietnam
30 Oct 2023National Data Center Project (Resolution 175/NQ-CP)Plan or strategyIn forceGovernment of Vietnam
15 Aug 2022Decree 53/2022/ND-CP: data localisation under the Cybersecurity LawRestrictionIn forceGovernment of Vietnam

How Vietnam compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Costa Rica—98.6% (2025)0.04 kgCO2/kWh (2025)11
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Israel—14.6% (2024)0.41 kgCO2/kWh (2024)10
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Morocco—27% (2024)—00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
New Zealand—88.5% (2025)0.08 kgCO2/kWh (2025)00
Nigeria154 USD/MWh (2026)32.7% (2025)—01
Norway100 USD/MWh (2026)96% (2025)0.01 kgCO2/kWh (2025)10
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Poland197 USD/MWh (2026)31.4% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01
Vietnam69.9 USD/MWh (2026)——11

Questions

Is there a data center moratorium in Vietnam?

Yes. 1 restriction on new data centers is in force in Vietnam: Decree 53/2022/ND-CP: data localisation under the Cybersecurity Law.

What incentives does Vietnam offer data centers?

In force: Law on Digital Technology Industry No. 71/2025/QH15: AI data centers get special investment incentives. Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Vietnam?

The industrial electricity price in Vietnam was 69.9 USD/MWh in 2026 (1,792 VND/kWh, production customers above 35 kV to below 220 kV, normal hours, excl. VAT, from 1 Nov 2026 (MOIT Decision 2892/QD-BCT as reported by SGGP); converted at SBV central rate 25,646 VND/USD on 19 Nov 2026: 1,792/25,646 x 1000 = 69.87 USD/MWh. En). Data center contracts can differ by voltage level, contract length and location.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker