Proprietary data
Data Center Power & Policy in Jordan
Every government action on data centers and power in Jordan that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 27 November 2026, DC Market Insights tracks 10 government actions on data centers and power in Jordan, 7 of them in force. We have found no moratorium or restriction on new data centers in force in Jordan. 1 incentive scheme applies: Investment Environment Law No. 21 of 2022.
Market snapshot
Jordan power and policy: key facts
- Renewable share of electricity generation: 26.9% (2024). Rank 34 of 51 tracked countries, highest first.
- Grid emission factor: 0.54 kgCO2/kWh (2023). Rank 7 of 42 tracked countries, highest first.
- Latest change: Amendment of the 2024 renewable connection rules to add energy storage (MEMR, 21 Apr 2026).
- By type: 3 power tariff, 2 renewable energy, 2 regulation and 1 plan or strategy.
Power indicators for Jordan
Latest official figure for each indicator, with earlier years where we have them.
In force now in Jordan
Grid access (1)
2024 bylaw on connecting renewable energy facilities to the electrical system
Bylaw published in the Official Gazette in September 2024 that sets procedures for connecting more renewable systems to the grid, eases approvals for investors installing renewable systems and supports energy efficiency and storage investment.
Power tariff (3)
Off-peak (time-of-use) tariff extended to banks, private hospitals, water pumping and hotels (phase 2)
MEMR and EMRC extended the incentivizing time-of-use tariff to banking, private hospitals, water pumping facilities and hotels from the start of 2025, with peak 17:00-23:00 and cheaper off-peak periods. Savings may reach up to 15% in low-demand periods.
15 % maximum saving in off-peak periods
EMRC time-of-use electricity tariff for productive sectors (phase 1)
EMRC split tariffs for extractive industry, large industry, medium industry, telecommunications, EV charging and optional water pumping into three periods: peak 17:00-23:00, partial peak 14:00-17:00 and 23:00-05:00, off-peak 05:00-14:00. Large industry pays 130/120/110 fils/kWh and the telecommunications sector 152/142/132 fils/kWh (peak/partial/off-peak). No data-center-specific tariff exists.
130 fils/kWh large industry, peak period
2022 electricity tariff restructuring: high-use commercial rate cut
EMRC's restructured electricity tariff took effect on 1 April 2022 to lower costs for economic sectors. For commercial users above 2,000 kWh a month the rate fell from 175 to 152 fils/kWh.
152 fils/kWh commercial, above 2,000 kWh/month (was 175)
Incentive (1)
Investment Environment Law No. 21 of 2022
Unified investment law (Official Gazette No. 5821, 16 Oct 2022), in force 90 days after publication. It gives customs exemptions on fixed assets and production inputs and an income-tax exemption or cut of at least 30% for up to five years in least developed regions or for projects employing at least 250 Jordanians, plus development zone and free zone regimes.
30 % minimum income-tax cut (Art. 10)
Regulation (2)
General Electricity Law No. 10 of 2025
New electricity law published in Official Gazette No. 5993, in force 90 days after publication. It aims to attract local and foreign investment in renewables and green hydrogen, allows self-generation with surplus sales to the grid, private power networks and ownership of storage by individuals and companies. Bylaws and instructions under the law were still being drafted in mid-2025.
Personal Data Protection Law No. 24 of 2023
Jordan's first data protection law, in force six months after publication (17 Mar 2024). Article 15 bars transfers of personal data outside the Kingdom to recipients whose protection level is lower than the Law's, with listed exceptions such as consent. No general data localisation rule.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Amendment of the 2024 renewable connection rules to add energy storage
The Energy Minister said Jordan is preparing to embed energy storage in its renewable energy framework by amending the 2024 regulation on connecting renewable facilities, with technical conditions, connection requirements for storage, network usage charges and export mechanisms under discussion.
Jordan Energy Sector Strategy 2025-2035 (draft)
Draft energy strategy for MEMR (revised March 2026). The reference pathway targets 33% renewable electricity by 2030 and 40% by 2035, with battery storage added alongside new variable renewables and the 450 MW Mujib pumped hydro plant expected in 2030. It recommends time-of-use tariffs and does not mention data centers.
40 % renewable share of electricity by 2035, reference pathway; date = 'Revised 03-2026' label, day not stated
NEPCO agreements for a 100 MW solar plant for industrial companies
NEPCO and Al-Shams Specialized Co. signed agreements for a 100 MW solar plant serving Amman Chamber of Industry factories; NEPCO builds a 400 kV switchyard and transmission line, construction from January 2026, so industry can pair it with time-of-use tariffs.
100 MW
Timeline of data center and power policy in Jordan
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 21 Apr 2026 | Amendment of the 2024 renewable connection rules to add energy storage | Renewable energy | Proposed | MEMR |
| 1 Mar 2026 | Jordan Energy Sector Strategy 2025-2035 (draft) | Plan or strategy | Proposed | MEMR |
| 11 Dec 2025 | NEPCO agreements for a 100 MW solar plant for industrial companies | Renewable energy | Announced | MEMR / NEPCO |
| 15 May 2025 | General Electricity Law No. 10 of 2025 | Regulation | In force | Parliament of Jordan / MEMR |
| 21 Jan 2025 | Off-peak (time-of-use) tariff extended to banks, private hospitals, water pumping and hotels (phase 2) | Power tariff | In force | Ministry of Energy and Mineral Resources (MEMR) / EMRC |
| 4 Sep 2024 | 2024 bylaw on connecting renewable energy facilities to the electrical system | Grid access | In force | Council of Ministers / MEMR |
| 1 Jul 2024 | EMRC time-of-use electricity tariff for productive sectors (phase 1) | Power tariff | In force | Energy and Minerals Regulatory Commission (EMRC) |
| 17 Sep 2023 | Personal Data Protection Law No. 24 of 2023 | Regulation | In force | Ministry of Digital Economy and Entrepreneurship (MoDEE) |
| 16 Oct 2022 | Investment Environment Law No. 21 of 2022 | Incentive | In force | Ministry of Investment / Parliament of Jordan |
| 16 Mar 2022 | 2022 electricity tariff restructuring: high-use commercial rate cut | Power tariff | In force | EMRC |
How Jordan compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Costa Rica | — | 98.6% (2025) | 0.04 kgCO2/kWh (2025) | 1 | 1 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Israel | — | 14.6% (2024) | 0.41 kgCO2/kWh (2024) | 1 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Jordan | — | 26.9% (2024) | 0.54 kgCO2/kWh (2023) | 0 | 1 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| New Zealand | — | 88.5% (2025) | 0.08 kgCO2/kWh (2025) | 0 | 0 |
| Nigeria | 154 USD/MWh (2026) | 32.7% (2025) | — | 0 | 1 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Poland | 197 USD/MWh (2026) | 31.4% (2025) | — | 0 | 1 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
| Vietnam | 69.9 USD/MWh (2026) | — | — | 1 | 1 |
Questions
Is there a data center moratorium in Jordan?
We have found no moratorium or restriction on new data centers in force in Jordan as of 27 November 2026. Proposed or announced measures, if any, are listed in the timeline.
What incentives does Jordan offer data centers?
In force: Investment Environment Law No. 21 of 2022. Each is listed with its authority and dates on this page.
How much of Jordan’s electricity is renewable?
Renewables supplied 26.9% of electricity generation in Jordan in 2024.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.
