As of 20 November 2026, DC Market Insights tracks 83 data centers operated by Google in 22 countries, of which 36 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 1 of 83 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Google data centers: key facts
About Google
Google, a subsidiary of Alphabet Inc., builds and runs its own hyperscale data centers. As of October 2026 its data center site lists 30 active locations in 11 countries, plus more than 30 sites in development across North America, Europe, Asia and South America. Google Cloud serves customers from 43 regions and 130 zones, each region built from three or more physical data centers.
- Headquarters
- Mountain View, United States
- Founded
- 1998
- Ownership
- Subsidiary of Alphabet Inc.
- Parent company
- Alphabet Inc.
- Tracked footprint
- 83 facilities in 22 countries
- Website
- datacenters.google
Data center business
- Google's data center site lists 30 active locations in 11 countries. Operating campuses in the United States include The Dalles (Oregon), Council Bluffs (Iowa), Berkeley County (South Carolina), Lenoir (North Carolina), Douglas County (Georgia), Pryor (Oklahoma), Loudoun and Prince William counties (Virginia), New Albany, Columbus and Lancaster (Ohio), Omaha, Papillion and Lincoln (Nebraska) and Midlothian (Texas).
- Outside the US, Google runs data centers in St. Ghislain (Belgium), Eemshaven, Middenmeer and Winschoten (Netherlands), Hanau (Germany), Dublin (Ireland), Fredericia (Denmark), Hamina (Finland), Waltham Cross (United Kingdom), Changhua County (Taiwan), Inzai (Japan), Singapore, Quilicura (Chile) and Canelones (Uruguay).
- Sites listed as in development include Farciennes (Belgium), Dietzenbach (Germany), Groningen (Netherlands), Horndal (Sweden), Kronstorf (Austria), Skien (Norway), Muhos and Vaala (Finland), Andhra Pradesh (India), Chonburi (Thailand), Selangor (Malaysia), and US campuses in Texas, Oklahoma, Indiana, Missouri, Minnesota, Georgia, Arkansas, Iowa, Michigan and Virginia.
- Google Cloud lets customers deploy workloads across 43 regions and 130 zones. Each region consists of three or more zones housed in three or more physical data centers.
- Hamina, Finland is Google's oldest European campus: Google bought the former Summa paper mill in 2009 and opened its first Hamina data centre in 2011, with EUR 3.5 billion invested in the region to date. In 2024 Google announced a seventh data centre at Hamina.
- Alphabet does not report data center capacity in MW. Its spending shows the scale of the build-out: purchases of property and equipment were USD 44.9 billion in the second quarter of 2026, while Google Cloud revenue rose 82% to USD 24.8 billion.
Recent updates
- Google announced EUR 13 billion of investment in digital infrastructure, clean energy and partnerships in Finland over the next two years, including a 22-year agreement supporting the life extension of the Loviisa nuclear plant and a 94 MW battery system.
- Alphabet reported Q2 2026 revenue of USD 119.8 billion, up 24%, with Google Cloud revenue up 82% to USD 24.8 billion and capital expenditure of USD 44.9 billion in the quarter.
- Google broke ground on its first Austrian data center in Kronstorf; once completed the facility will create 100 direct jobs.
- Google announced a data center in Pine Island, Minnesota, with Xcel Energy adding 1,400 MW of wind, 200 MW of solar and 300 MW of iron-air battery storage, and Google providing USD 50 million to Xcel's Capacity*Connect program.
- Google announced a new $40 billion investment in Texas through 2027 to build cloud and AI infrastructure, including new data center campuses in Armstrong and Haskell Counties.
Company details checked against company and official sources, 14 Nov 2026.
- The largest project in the pipeline is Google North Weald Airfield (163 MW, planned).
- United Kingdom accounts for 100% of tracked capacity (2 facilities).
- 1 of 83 facilities have a capacity stated by their source; the totals above count only those.
Google development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 163 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Google North Weald AirfieldGoogle | North Weald Bassett, United Kingdom | Planned | Hyperscale | 163 MW |
Facilities
83 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Google Morgan CountyHyperscale | United States | Planned | — | — | Operator / official |
Google MuhosHyperscale
History
|
Muhos, Finland | Planned | — | — | Trade press |
| Google Muskogee County data center campusHyperscale | United States | Planned | — | — | Operator / official |
| Google New AlbanyHyperscale | New Albany, United States | Operational | — | — | Operator / official |
Google New Florence data centerHyperscale
Cooling: Air or free cooling
History
|
New Florence, United States | Planned | — | — | Trade press |
| Google OmahaHyperscale Cooling: Chilled water, cooling towers · Owned: self-build; permit holder Westwood Solutions LLC represents Google | Omaha, United States | Operational | — | — | Operator / official |
| Google PampaHyperscale | Pampa, United States | Planned | — | — | Operator / official |
| Google PapillionHyperscale Cooling: Chilled water, cooling towers · Owned: self-build; permit holder Fireball Group LLC | Papillion, United States | Operational | — | 2019 | Operator / official |
Google Pine IslandHyperscale
Cooling: Air or free cooling
History
|
Pine Island, United States | Planned | — | — | Operator / official |
| Google Port of Little Rock Data CenterHyperscale Cooling: Evaporative or adiabatic · Owned: Port land sold to Willowbend Capital, LLC (purchaser; tie to Google only in press) | Little Rock, United States | Planned | — | — | Trade press |
| Google Prince William County data centerHyperscale | United States | Operational | — | 2023 | Operator / official |
| Google Putnam County Data CenterHyperscale | United States | Planned | — | — | Trade press |
| Google Quilicura data centerHyperscale | Quilicura, Chile | Operational | — | 2015 | Operator / official |
| Google Red OakHyperscale Cooling: Chilled water, cooling towers | Red Oak, United States | Under construction | — | — | Operator / official |
Google Saint-GhislainHyperscale
Cooling: Evaporative or adiabatic · Owned (self-build): Google-built and operated campus (first Google data centre outside the U.S.)
History
|
Saint-Ghislain, Belgium | Operational | — | 2010 | Operator / official |
Google second data centre, Elmina Business ParkHyperscale
History
|
Elmina, Malaysia | Planned | — | — | Trade press |
| Google Singapore data center campus (Jurong)Hyperscale | Singapore, Singapore | Operational | — | 2013 | Trade press |
| Google SkienHyperscale | Skien, Norway | Planned | — | — | Operator / official |
| Google Stillwater data center campusHyperscale Cooling: Chilled water, cooling towers | Stillwater, United States | Planned | — | — | Operator / official |
| Google Storey CountyHyperscale | United States | Operational | — | 2021 | Operator / official |
Google Tainan Data Center (planned)Hyperscale
History
|
Tainan, Taiwan | Planned | — | — | Trade press |
| Google The DallesHyperscale Cooling: Evaporative or adiabatic · Owned: Google self-built and self-operated campus | The Dalles, United States | Operational | — | 2006 | Operator / official |
| Google Tulsa County data center campusHyperscale | United States | Planned | — | — | Operator / official |
Google Uruguay data center (Parque de las Ciencias)Hyperscale
History
|
Colonia Nicolich, Uruguay | Under construction | — | — | Operator / official |
Google VaalaHyperscale
History
|
Vaala, Finland | Planned | — | — | Trade press |
| Google Van Buren TownshipHyperscale Owned: Google will be the final owner and operator; construction managed by Panattoni | Van Buren Township, United States | Planned | — | — | Operator / official |
| Google Visakhapatnam AI Hub (Tarluvada)Hyperscale | Visakhapatnam, India | Under construction | — | — | Trade press |
| Google Waltham CrossHyperscale Cooling: Air or free cooling · Owned: Google's own data centre | Waltham Cross, United Kingdom | Operational | — | 2025 | Operator / official |
| Google West Memphis Data CenterHyperscale Owned: 1,178-acre site sold to Google | West Memphis, United States | Under construction | — | — | Operator / official |
| Google Wilbarger CountyHyperscale | United States | Planned | — | — | Operator / official |
| Google WinschotenHyperscale Cooling: Air or free cooling · Owned (self-build): Google's own data center | Winschoten, Netherlands | Operational | — | 2025 | Operator / official |
| Green Box Computing hyperscale data center, Agriport A7 (50 ha)Hyperscale | Middenmeer, Netherlands | Planned | — | — | Operator / official |
| Project Tembo (formerly Project Jade)Hyperscale Owned: built by Jupiter Star Holdings LLC, a wholly owned Google subsidiary (replacing Crusoe) | United States | Planned | — | — | Operator / official |
Market position
How Google compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Google is one of 171 operators we track.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Netherlands, Google is one of 33 operators we track.
- In Finland, Google is one of 16 operators we track.
- Kansas City also hosts 7 other tracked data center(s), run by Edged, Iron Mountain, Lightedge and Meta.
- Our Deal Tracker lists 6 deal(s) naming Google, the latest on 17 November 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 4 | 40 MW | 162 MW |
| CloudHQ | 1 | — | 84 MW |
| Pure DC | 1 | — | 78 MW |
| Digital Realty | 13 | — | 70 MW |
| NorthC | 14 | 57 MW | — |
| CyrusOne | 1 | 54 MW | — |
| Iron Mountain | 2 | 13.1 MW | 20 MW |
| NTT DATA | 1 | 20.7 MW | — |
All data centers in Netherlands Power and policy in Netherlands
Data center operators in Finland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| atNorth | 4 | 41.6 MW | 590 MW |
| DayOne | 1 | — | 560 MW |
| Verne | 2 | 70 MW | 70 MW |
| Winda Energy | 1 | — | 100 MW |
| Nebius | 1 | 75 MW | — |
| Arcem | 1 | — | 60 MW |
| TikTok | 1 | — | 50 MW |
| Telia | 1 | 24 MW | — |
All data centers in Finland Power and policy in Finland
Other data centers in Kansas City
- Edged Kansas City · Edged · Operational · 26 MW
- Iron Mountain KCM-1 Kansas City · Iron Mountain · Operational · 3.9 MW
- Lightedge Kansas City Data Center · Lightedge · Operational
- Meta Kansas City Data Center · Meta · Operational
- Netrality 1102 Grand · Netrality · Operational
- Project Kestrel (KCI 29 Logistics Park) · Shenandoah Computing · Planned
- Red Wolf Kansas City Kansas hyperscale campus · Red Wolf DCD Properties · Planned
Deals naming Google
- Google → 50 MW superhot geothermal power from Project Obsidian, Central Oregon, for Google's The Dalles data center Power deal
- Google → Crusoe's southeast Wyoming data center campus site (Wyoming project, co-initiated with Tallgrass Energy) M&A
- Google LLC (credit support provider) → TeraWulf Justified Data Campus project financing, Hawesville, Kentucky (Anthropic lease) Financing
- Google → West Memphis, Arkansas data center campus expansion: ~$600m grid investment (Driver 1,000 MWh and Jones Mill 400 MWh batteries, Galet substation, two 230 kV lines) + Big Island 440 MW(ac) solar PPA Power deal $600.0M
- Google → Cheyenne Fuel Cell, LLC (AEP ~92%, Basalt Infrastructure Partners funds ~8%) power supply for Google in greater Cheyenne, Wyoming Power deal $4.00B
- Google (Jupiter Star Holdings) → Power supply for Google's planned data center, Cheyenne, Wyoming Power deal $1.80B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Google operate?
DC Market Insights tracks 83 Google data center(s) in 22 countries as of November 2026: 36 operational, 10 under construction and 37 planned.
Where is Google headquartered?
Google is headquartered in Mountain View, United States. Ownership: Subsidiary of Alphabet Inc.
Which other companies operate data centers in United States?
Besides Google, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Kansas City?
Other tracked data centers in Kansas City include Edged Kansas City (Edged), Iron Mountain KCM-1 Kansas City (Iron Mountain), Lightedge Kansas City Data Center (Lightedge) and Meta Kansas City Data Center (Meta).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.